Operating Instructions S-5EC General notes 1 General notes Compliance with the following instructions is mandatory to ensure the functionality and safety of the product. If the following instructions given especially but not limited for general safety, transport, storage, mounting, operating conditions, start-up, mainte- nance, repair, cleaning and disposal / recycling are not observed, the product may not operate safely and may cause a hazard to the life and limb of users and third parties.
Operating Instructions S-5EC Product overview The safe isolation from the supply must be checked using a two-pole voltage detec- • tor. The owner is obliged to ensure that the device is operated in perfect working order • only. Electrical equipment must be checked regularly: Loose connections are to be re- •...
Operating Instructions S-5EC Mounting 3.3 Disposal / recycling Disposal must be carried out professionally and in an environmentally friendly way in accordance with the respective national legal stipulations. Separate the materials by type and in an environmentally friendly way. " If necessary, commission a specialist company with the waste disposal.
Operating Instructions S-5EC Electrical installation Drilling template on packing Vertical mounting Bohrschablone drilling template Schraube 4,5 mm screw max 4,5 mm 91 mm Gehäuse / housing 106 mm 1 Lid screw (tightening torque 1.1 Nm) 5 Electrical installation 5.1 EMC-compatible installation of control lines Pay attention to maintain sufficient distance from powerlines and motor wires to prevent interferences.
Operating Instructions S-5EC Electrical installation 5.3 Output voltage 0 - 10 V Connection to terminals “A” and “GND ” (I Technical data). Information • The output voltage is directly dependent on the supply voltage! • It is not permissible to connect outputs of several devices to each other! •...
Page 8
Operating Instructions S-5EC Electrical installation Jumper "J1 Step 5" With internal jumper "J1 Step 5" it can be selected whether the setting with the Step 5 potentiometer "O set" is also meant to be e ective for step 5. Offset •...
Operating Instructions S-5EC Electrical installation 5.4 LED control With internal jumper "J2 LED" it can be selected whether the LED registers the operation of the potentiometer or if it is controlled via an external contact. Jumper "J2 LED" LED operating indication potentiometer Jumper "J2"...
Operating Instructions S-5EC Enclosure 6 Enclosure 6.1 Technical data Type S-5EC-2 Part-No. 449084 Max. current consumption ca. 7.5 mA . . 0 Housing PC (polycarbonate) Fire protection classi fication UL94V0 o i t c i t o i t n i t Weight approx.
Our products are manufactured in accordance with the relevant international regulations. If you have any questions concerning the use of our products or plan special uses, please contact: Systemair GmbH Seehöfer Straße 45 97944 Boxberg Tel.: +49 7930 92 72-0 Fax: +49 7930 92 72-92 info@systemair.de...
Need help?
Do you have a question about the S-5EC-2 and is the answer not in the manual?
Questions and answers