Palmako 0615402998789 Assembly, Installation And Maintenance Manual

Log cabin

Advertisement

Available languages

Available languages

Quick Links

Assembly, installation and maintenance manual
Montage-, Aufbau- und Wartungsanleitung ● Assemblage, manuel de montage et d'entretien ● Montaje, instalación,
y mantenimiento ● Manuale di montaggio, installazione e manutenzione ● Monterings- og vedlikeholdsmanual ●
Monterings-, installations- och underhållsmanual ● Kokoamis-, asennus- ja huolto-ohje ● Vejledning for montering
og vedligehold ● Handleiding voor montage, installatie en onderhoud ● Manual de montagem, instalação e
manutenção ● Návod k montáži, instalaci a údržbě ● Instrukcja montażu, instalacji i konserwacji ● Surinkimo,
montavimo ir priežiūros vadovas ● Montāžas, uzstādīšanas un apkopes rokasgrāmata ● Руководство по сборке
и обслуживанию ● Montaaži-, paigaldus- ja säilitamise juhend
Treatment options, Item code ●
Behandlungsoptionen, Artikel-Code ● Traitement options, code de
l'article ● Tratamiento opciones, código del artículo ● Opzioni di
trattamento, codice articolo ● Behandlingsalternativer,
artikkelnummer ● Behandlingsalternativ, varukod ●
Käsittelyvaihtoehdot, yksikön koodi ● Behandlingsmuligheder,
artikel nummer ● Behandelingsopties, artikelnummer ● Opções de
tratamento, código do artigo ● Povrchové úpravy, kód položky ●
Możliwości leczenia, kod produktu ● Apdorojimo variantai, prekės
kodas ● Apstrādes iespējas, artikula kods ● Варианты обработки,
код изделия ● Töötlusvõimalused, tootekood
Factory inspection by ● Werkskontrolle durch ●
Contrôle à partir de l'usine par ● Inspector de fábrica ●
Collaudato
da
Fabriksbesiktigat av ● Tehtaan tarkastaja ● Fabriks
Kontrol udført af ● Fabriekscontrole door ● Inspeção de
fábrica, por: ● Zkontrolováno ve výrobním závodě ●
Kontrola fabryczna do ● Apžiūrą gamykloje atliko ●
Rūpnīcas pārbaudi veicis ● Заводской контроль ●
Tehase kontroll teostatud:
.........................................................................................
Palmako AS | Näituse 25 | 50409 Tartu | Estonia | Ph: +372 7 355 530 | Fax: +372 7 355 544 | contact@palmako.ee | www.palmako.ee
Log cabin 0615402998789
Fabrikkkontroll
utført
BNVPI AR14758
Date ● Datum ● Date ● Fecha ● Data ● Dato ● Datum ●
Päiväys ● Dato ● Datum ● Data ● Datum ● Data ● Datums
● Data ● Дата ● Kuupäev:
av
Pack number ● Pack Nr. ● Packet n° ● Paquete N
N. ● Serienr ● Produktionsnummer ● Pakettinro ● Pakke nr.
● Pak nr. ● Número de embalagem ● Číslo balení ● Numer
opakowania ● Pakuotės numeris ● Iepakojuma numurs ●
Упаковочный номер ● Pakinumber:
o
● Pacco

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the 0615402998789 and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for Palmako 0615402998789

  • Page 1 ● Pak nr. ● Número de embalagem ● Číslo balení ● Numer opakowania ● Pakuotės numeris ● Iepakojuma numurs ● Упаковочный номер ● Pakinumber: ..................Palmako AS | Näituse 25 | 50409 Tartu | Estonia | Ph: +372 7 355 530 | Fax: +372 7 355 544 | contact@palmako.ee | www.palmako.ee...
  • Page 2: Inspection Certificate

    ● Certyfikat kontrolny ● Apžiūros pažyma ● Pārbaudes akts ● Акт осмотра ● Kontrollakt Art. Nr. AR14758 EAN 0615402998789 Please keep safely! Bitte gut aufbewahren! ● A bien conserver, s.v.p.! ● ¡A conservar! ● Da conservare! ● Ta vare på denne! ● Vänligen förvara säkert! ● Ole hyvä ja säilytä...
  • Page 3 Dansk: Det købte produkt fremstillet i overensstemmelse med de høje kvalitets krav. Produktet er blevet omhyggeligt inspiceret og pakket. For at undgå eventuelle problemer i løbet af monteringen udført af dig selv eller håndværker af dit eget valg, anbefaler vi, at du undersøger leverancen for fuldstændighed i overensstemmelse med listen over dele før samling.
  • Page 4 To be completed by buyer! (Please use block letters) ● Vom Käufer auszufüllen! (Bitte in Druckschrift) ● A remplir par l’acheteur! (en lettres d’imprimerie, s’il vous plaît) ● ¡Completa el cliente! (en mayúsculas) ● Da compilare dall’acquirente! (in stampatello) ● Fylles ut av kjøper! (Vær vennlig å...
  • Page 5 12.4m²...
  • Page 17: General Information

    Installation manual – English 1 General information Dear client, We are glad that you have decided in favour of our garden house! Please read the assembly manual carefully before proceeding with the house installation! You will thus avoid problems and will not waste time. Recommendations: ➢...
  • Page 18: Preparation For Assembly

    Installation manual – English Garden house painting and maintenance Wood is a natural material, growing and adapting depending on weather conditions. Large and small cracks, colour tone differences and changes, as well as a changing structure of wood are not errors, but a result of wood growing and a peculiarity of wood as a natural material.
  • Page 19 Installation manual – English Preparation of components: Sort the components based on the wall plans (see Technical specifications) and place them at the four sides of the house in the installation sequence. ATTENTION: Never place the components directly on grass or a muddy surface because it will be very difficult or even impossible to clean them up later!
  • Page 20 Installation manual – English Base frame (Foundation joists) The base frame of the house must be completely flat and level to ensure that the installation proceeds without problems. ATTENTION: different house can have different foundation placements – see the appended base frame drawing (in Technical specifications)! Place the impregnated foundation joists on the prepared foundation in accordance with the drawing at equal intervals.
  • Page 21: Door And Window

    Installation manual – English Continue the installation of the walls by strongly forcing the wall logs into one another. If necessary, use the hitting block and hammer. At the same time, do not forget to begin the installation of the door and windows.
  • Page 22 Installation manual – English Apex In most cases, the apex is supplied in one piece (attention: in some house options, the apex can comprise several parts! In this case, these parts will have to be screwed together prior to other actions).
  • Page 23 Installation manual – English Having installed the roof boards, the roof felt and roof Installation of roof slats: slats must be attached. The table of components shows whether the roof cover material and slats are included with this house option! First of all, screw the roof edge reinforcements and eave edgings under the roof board ends.
  • Page 24: General Advice

    Installation manual – English this case, the floor boards should not be attached very densely to avoid likely bulging. Leave some space (1-2 mm) between the floor boards to allow for swelling. But if your climate is warm and dry, you can install the boards densely because they will become drier and spaces may appear between them.
  • Page 25: Cher Client

    Notice de montage – Français 1 Généralités Cher client, Nous sommes heureux que votre choix se soit porté sur notre abri de jardin! Il est important de lire entièrement cette notice de montage avant de commencer la construction de votre abri en madriers! Vous vous éviterez ainsi des problèmes et des pertes de temps inutiles.
  • Page 26: Préparation Au Montage

    Notice de montage – Français Peinture et entretien Le bois est un produit naturel qui travaille de façon variable. Des caractéristiques telles que les madrures grossières et fines, les nuances de couleurs et les modifications, de même que les imbrications, ont leur origine dans la croissance du bois.
  • Page 27: Montage

    Notice de montage – Français Préparation des détails: Classez le matériel et déposez-le sur les quatre côtés de la maison, conformément à l'ordre de montage. IMPORTANT: Ne déposez pas les bois directement sur le gazon ou dans la saleté, car les bois seront alors difficiles, voire impossibles à...
  • Page 28 Notice de montage – Français Posez les longrines imprégnées sur les fondations préparées, en respectant à peu près le même écartement entre les longrines (voir plan de fondations dans les Caractéristiques techniques). Veillez à ce que les longrines soient de niveau et à angles droits, avant qu'elles ne soient assemblées par vissage. REMARQUE: Il est conseillé...
  • Page 29 Notice de montage – Français Porte et fenêtres Dormants: Montage des dormants (nécessaire seulement dans le cas d'une porte double!):  Dans le cas de la porte double, les éléments du dormant sont livrés détachés, pour des raisons de transport, et il faut commencer par les assembler.
  • Page 30 Notice de montage – Français Pignons Le triangle du pignon est la plupart du temps en une seule pièce. (Attention: En fonction du modèle, le triangle du pignon peut également être en plusieurs parties! Dans ce cas, il faut commencer par visser les différentes pièces entre elles).
  • Page 31 Notice de montage – Français Une fois que les planches du toit ont été posées, il faut Montage des baguettes du toit: mettre en place le carton bitumé du toit et les baguettes de finition du toit. Pour savoir si la couverture et les baguettes de finition du toit font partie de l'étendue de la fourniture, reportez-vous à...
  • Page 32 Notice de montage – Français sèches, mais que le climat est humide, elles absorbent facilement l'humidité. C'est la raison pour laquelle il est conseillé de ne pas fixer les planches trop près les unes des autres, afin d'éviter les éventuels gonflements. Laissez 1 à...

This manual is also suitable for:

Bnvpi ar14758

Table of Contents