Download Print this page

Delta breez VFB25AC Installation And Operating Instructions Manual page 5

Ventilation system

Advertisement

The Breez Ventilation System is easy to install
in new or existing construction.
Make sure that the dimensions of the opening are
suitable for installation and follow the steps below.
Wood Frame
1
Step
Attach the duct connector to the wood frame with taping screw.
Wood Frame
2
Step
Insert the body into the wood frame and connect it to the duct
connector. Secure the body on wood frame with taping screws.
Body
Step
3
Insert the duct into the duct connector.
Tape
Body
Ceiling
Grill
Duct Connector
Wood Frame
Taping Screw
Inside
Outside
Duct
Gradient
1°~2°
Inspection Hole
Two basic types of installation are shown:
Wood Frame Installation
Body
Step
Connect wires as shown in wiring diagram below.
Ventilation Fan
Step
Insert the mounting springs into the slots and mount
the grille to the body.
Slots
Grill
Taping Screw
Ventilation Fan Installation Guide
Joist Mounting Installation
Joist
4
Switch Box
(Purchase separately)
O
Black
On
White
Green
5
Joist
Live
Neutral
Ground
Spring
5

Advertisement

loading

This manual is also suitable for:

Breez vfb25achBreez vfb25adBreez vfb25axBreez vfb25aehBreez vfb25adh