Page 7
EN: The base is a docking structure, and the diagonal dimensions need to be consistent during assembly, with a flat ground, otherwise it will affect the entire tool room structure.
Page 8
EN_Note: Do not use screws in this screw hole; it will be assembled with part 5 in the next step.
Page 9
EN_Note: Do not use screws in this screw hole; it will be assembled with part 5 in the next step.
Page 12
Flat edge groove Note: When installing W3, the grooved edge should overlap with W5. Incorrect installation will cause interference in the next step. Note: There is no need to drill screws in the screw holes here, the next step is to assemble with Y47-UB.
Page 13
Note: GY must be properly assembled according to the diagram at this step because GY is the sliding door fixing com- ponent. Skipping this step will prevent subsequent installation and result in the sliding door being unassembled. W5 hole W3 hole W3 hole Note: There is no need to drill screws W5 hole...
Page 14
Fix the 4 F1 screws from underneath Y46-13 by screwing upwards. Note: Only these 2 screws need to be installed in the upper screw holes, and the rest of the screws should be assembled with the ventilator plate.
Page 19
Assemble the ventilation panel screws in the order shown in the diagram, starting with the middle hole to avoid misalignment. Assemble the ventilation panel screws in the order shown in the diagram, starting with the middle hole to avoid misalignment.
Page 21
Note: The part with holes should be on top. Incorrect installation will prevent the next step.
Page 22
The small hole should be on the outside and assembled with K812-8. The flat edge should be installed with K812- 8; other-wise, there will be interfer-ence. groove...
Need help?
Do you have a question about the 845-429V00 and is the answer not in the manual?
Questions and answers