Page 1
Assembly Instructions MODEL:AM2604 PRODUCT SIZE(LxWxH): 14X10 PLEASE READ CAREFULLY BEFORE ASSEMBLY Greenhouse 14x10 FT Assembly Instruction SKU: 1007040034B(BOX 1) 1007040035B(BOX 2) 1007040036B(BOX 3) Arrive in 3 separate boxes and may not be part of the same shipment; Please install the product after receiving all the packages.
Page 2
CONTENTS 1. Assembly Advice ..............Page 1 2. Product Features ..............Page 2 3. Parts List ................Page 3 -5 4. Door Assembly ..............Page 6 - 9 5. Roof Vent Assembly ............Page 10 - 12 7. Base Assembly ..............Page 13-15 8. Framework & Glazing Assembly ........Page 16 - 34...
Page 3
Assembly and Maintenance Advice 1. For safety purposes, we strongly recommend that this product is assembled by at least two people. 2. Some components have sharp metal edges. Please be careful when handling metal components. Please wear gloves, shoes and safety goggles during assembly. 3.
Page 4
Functions and Features: 1. The strong two part eaves beam includes an integral gutter. Downpipes are also included as standard so you can collect rainwater. 2. Manual window handles are included as standard with the roof vents. If required, automatic roof vent openers are available as an inexpensive optional extra. GM80001 Automatic Opener Manual Opener...
Page 8
PART Left Door L15B L15C L18B L16A Step 1 L16A L18B M5X12 ! Attention: Check the direction of the accessories Step 2 ! Attention:Remove the protective films from both sides of each polycarbonate panel, before inserting into aluminum channels. Ensure the milky white film faces towards the Sun.
Page 9
L15B L18B L16A L15C !Attention: The notched end of the L15B&C is connected to the L18B S26*2 Slide the adhesive strip J184 into the groove of L15A after installation, and then clamp the two ends with pliers.
PART Right Door L15A L16A L18A L18A Step 1 M5X12 L16A ! Attention: Check the direction of the accessories Step 2 ! Attention:Remove the protective films from both sides of each polycarbonate panel, before inserting into aluminum channels. Ensure the milky white film faces towards the Sun.
Page 11
L15A L15A S26*2 Slide the adhesive strip J184 into the groove of L15A after installation, and then clamp the two ends with pliers.
PART NO. QTY. Exploded View L11A L12A Window X 2 Ø4X16D Ø4X8 M4.2X16 L12A L11A...
Page 13
PART NO. QTY. NO. QTY. Part L11A L12A Ø4X16D Ø4X8 Step 1 ! Attention:Remove the protective films from both sides of each polycarbonate panel, before inserting into aluminum channels. Ensure the milky white film faces towards the Sun. Step 2...
PART NO Base Assembly D306 D307 M6X12 D307 D307 D307 Attention! D306 and D307 must be inserted into the soil or installed in reverse!! D306 D306 D306 D306 D306 Fix the base before assembly the greenhouse. This is the way to fix the base.
Page 16
Base Assembly ! Attention:Turn over the steel plinths D306 & D367 & D308 to complete the base installation as shown below, when the greenhouse is NOT inserted and secured into the soft soil. D306 D308 D308 D306 D306 D308 D306...
Page 17
PART NO Base Assembly D114 M6X60 Fix the base anchor clip D114 onto each base section with a distance of 5~10CM from each end. 2.Mark the middle of the D114 hole to drill the Ø8 hole, then use S69 to fix the D144 to the ground D114 D114 D114...
PART Wall Assembly L01A L02F L01A L02F L01A L23B L08A L08B L08A L23B L08B J181 L02F M6X12 Attention! L02F with notch facing up. M4.2X16 External view Internal view L01A L02F L01A L08A L08A&B L08A J181 L08A L08A&B L08A L23B L23B L08A L23B L23B with the extra reinforced...
Page 19
PART Wall Assembly L02G L02G L02G L23B L23B L08A M6X12 L08A M4.2X16 L02G Attention! Install S01 and M01 first, and put the side with 4 holes of L02G face upwards L23B with the extra reinforced edge in the middle should face inside. L02G L08A L23B...
Page 20
PART Wall Assembly L10A L26A L26B L23A L08A L23A L26A L26B L08C L10A L08A D317 M6X12 L26A Attention! Install S01 and M01 first, and put the side with 4 M6X12 holes of L26A face upwards M4.2X16 Fix L26A onto L08B, L26B onto L08C using S01 &...
Page 21
PART Wall Assembly L01A L23A L23B J181 L01A M6X12 L23B M4.2X16 L01A L08A L23A L23A J181 Attention! Put the side with 2 J181 holes of L23A facing upwards. L08C External view Internal view L01A L01A L08A&C L08A L23A&B J181 L08A L08A&B L23A&L23B with the extra reinforced...
Page 22
PART Wall Assembly L02F L02F Attention! L02F with notch facing up. L08A L23B L02F M6X12 M4.2X16 L23B C L23B L08A L02F L01A L08A L23B L08A L08A L23B with the extra reinforced edge in the middle should face inside. L08A L23B L23B Secure the L08A to the foundation with Z08 against the hole in the L08A...
Page 23
PART Wall Assembly L02A L02F L02F L26C Attention! L02F with notch facing up. L26C M6X12 L02A L02A L02F L02A&L02F L26C L02F L26C L02A&L02F L02A&L02F L23B Slide S01 into each L02A end L02F bolt channel to be used later.
Page 24
PART Wall Assembly Attention! Put the side of L07C has two holes in the middle L07A upward! L07A L07B L07B L07A L07A L07C L07A L07C D315 M6X12 D315 L07A&B&C L07A&B&C L07A L07A Attention! Part D315, two holes in the middle do not install screws, other screws should not be tightened until the entire Y6 Y6...
Page 25
PART Wall Assembly L04A WINDOW M6X12 WINDOW L04A L04A L04A L02F L04A S01X4 Slide 4 bolts (S01) into each L04A bolt channel. 2 to be fixed with A03, and another 2 to be fixed with L02F L11A L11A S01X2 L02F Slide 2 bolts (S01) into each L11A, and bolt it to L02B/L03B, using the S01 &...
PART Top Assembly L06A J128 J148 J128 M4.2X16 J148 J148 L06A J148 is approximately 80mm from the ends of L06A J128 J148...
Page 27
PART Top Assembly L06A L27A D316 D316 D316 L27A L27A M6X12 Attention! The side of L27A with four holes are facing downwards. External view Internal view L27A L27A L27A D316 D316 L27A L27A D315 External view L07A L07A L27A Internal view L07A D315 Attention! Do not tighten the...
Page 28
PART Top Assembly L02B L02E L02E L02B M6X12 L02B Attention! The side with a distance of 260MM from one end L02B&E of each L02B & L02E, where 2 holes are L02B&L02E drilled, should face down. Slide S01 into each L02B and L02E bolt channel to be used later.
Page 29
PART Top Assembly L02H M6X12 L02H Attention! When installing, the middle hole of L02H is L02H closer to the top. L06A L02H L02H L02H...
Page 31
PART Top Assembly L05E 504mm L05F L05F 1043mm L05E L05E L05E M6X12 Attention!When installing L05E and L05E L05F L05F, it is necessary to lift the top up so that the L07 segments are flush and do not protrude outward, and then tighten them with S01 and M01.
Page 32
PART Top Assembly J183 M4.2X16 J183 ! Attention:Remove the protective films from both sides of each polycarbonate panel, before inserting into aluminum channels. Ensure the milky white film faces towards the Sun.
Page 33
Top Assembly PART L09A L09B L09C M6X12 L09A L09B L09A L09A&B L09A When the panels are completely inserted, fix gutter profile L09A&B Slide 1*S01 into the bolt channel of both L09A, Tap it gently into position fix D25 to L09A using S01 & M07. with a rubber mallet.
Page 34
Top Assembly L09C L09B L09C L09C L09C L09B When the panels are completely inserted, fix gutter profile L09C Slide 1*S01 into the bolt channel of both L09B&C, Tap it gently into position fix D25 to L09B&C using S01 & M07. with a rubber mallet.
Door Assembly PART NO D00R-L D00R-R M4.8X16 M5X12 Left Door Right Door Left Door Right Door Fix A51(4 PCS) one side on the door profile and the other side to L26A/L26B using S27. Then secure with Z17.
PART NO Accessories Assembly J182 J182 J182 J182 M4.2X16 Ø4X16D L01A L09A&L9C J182 J182 L09A&L09C L01A After fixing J182, use glass glue to fill the Put J182 on L01A and fix gap between the board and J182. it on L09A&L09C with Z02. If you wish to eliminate Drill a hole in L01A leaks, use glue when...
Need help?
Do you have a question about the AM2604 and is the answer not in the manual?
Questions and answers