Download Print this page

ROUILLARD AGORA II ELITE OLEA Installation Manual

Double table with “o” shared legs

Advertisement

Quick Links

GUIDE D'INSTALLATION
INSTALLATION GUIDE
AGORA II ELITE OLEA
TABLE DOUBLE AVEC PIÈTEMENT MITOYEN EN "O" /
DOUBLE TABLE WITH "O" SHARED LEGS
29'' HAUT / HIGH
(TEO)
Service à la clientèle: 1 800 463-1611
Customer service: 1 855 459-1954

Advertisement

loading
Need help?

Need help?

Do you have a question about the AGORA II ELITE OLEA and is the answer not in the manual?

Questions and answers

Summary of Contents for ROUILLARD AGORA II ELITE OLEA

  • Page 1 GUIDE D’INSTALLATION INSTALLATION GUIDE AGORA II ELITE OLEA TABLE DOUBLE AVEC PIÈTEMENT MITOYEN EN “O” / DOUBLE TABLE WITH “O” SHARED LEGS 29’’ HAUT / HIGH (TEO) Service à la clientèle: 1 800 463-1611 Customer service: 1 855 459-1954...
  • Page 2 Liste de pieces / Part list Les tables de 120’’ de long et plus nécessitent des barres de renforts telles qu’illustrées ci-dessus. Tables of 120’’ long and more needs stretchers as shown above. Quincailleries / Hardware 56 x Vis 1/4-20 x 3/4’’ tête plate 56 x screw 1/4-20 x 3/4’’...
  • Page 3 Assemblage / Assembly Placez les dessus de tables à l’envers sur une surface de protection afin d’éviter les égratignures. Assemblez les pattes à la table avec 56 vis 1/4-20 x 3/4’’. Place tables tops upside down on a soft surface to prevent it from scratching. Assemble the legs to the surface using 56 1/4-20 x 3/4’’...
  • Page 4 Boîte d’électrification / Electrification Box (BE/BEXL) Quincailleries / Hardware 6 x Vis à bois #8 x 5/8’’ 6 x Wood screw #8 x 5/8’’ Assemblage / Assembly Fixez le panneau A sous la table avec les 6 vis à bois #8 x 5/8’’. Assemble the panel A under the table with 6 wood screws #8 x 5/8’’.
  • Page 5 Colonne passe-fils / Wire management (PF) Quincailleries / Hardware 2 x Vis 1/4-20 x 5/8’’ 2 x 1/4-20 x 5/8’’ Screws Quincaillerie pré-assemblée 2 x Lames de serrage Pre-assembled hardware 2 x Fixation plates Assemblage / Assembly Glissez les lames de serrage dans la rainure verticale de la patte.
  • Page 6 Panneau passe-fils / Wire Management Panel (PANDB) Quincailleries / Hardware 12 x Vis 1/4-20 x 5/8’’ 12 x 1/4-20 x 5/8’’ Screws 12 x Vis à bois #12 x 2’’ 12 x Wood screws #12 x 2’’ Assemblage / Assembly Accrochez le panneau A sur les plaques de fixation du panneau B.
  • Page 7 Panneau décoratif / Decorative Panel (PAN) Quincailleries / Hardware 4 x Vis à bois #8 x 5/8’’ 4 x Wood screw #8 x 5/8’’ Assemblage / Assembly Fixez le panneau dans les rainures du piètement avec 4 vis à bois #8 x 5/8’’. Screw the panel in the grooves of the leg with 4 wood screws #8 x 5/8’’.