Afore AF10000W-LG Installation And Operation Manual

Wall mounted energy storage battery

Advertisement

Quick Links

Wall Mounted
Energy Storage Battery
Installation and Operation Manual
+86-21-54326236
+86-21-54326136
info@aforenergy.com
Building 7, No.333 Wanfang Rd, Minhang District, Shanghai, China. 201112

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the AF10000W-LG and is the answer not in the manual?

Questions and answers

Summary of Contents for Afore AF10000W-LG

  • Page 1 Wall Mounted Energy Storage Battery Installation and Operation Manual +86-21-54326236 +86-21-54326136 info@aforenergy.com Building 7, No.333 Wanfang Rd, Minhang District, Shanghai, China. 201112...
  • Page 2: Table Of Contents

    Operation Manual AF10000W-LG CONTENTS 1 Technical Data 1 -2 2 Product Overview Brief Introduction Interface Introduction 2.2.1 Switch ON/OFF 2.2.2 LED Indicator Definition 2.2.3 CAN / RS485 Port 2.2.4 RS232 Port 3 Installation Guide Checking Before Installation 3.1.1 Checking Outer Packing Materials 3.1.2...
  • Page 3: Technical Data

    TECHNICAL DATA NOTE Operating current derating according to cell voltage and battery temperature.
  • Page 4: Product Overview

    1. Switch ON Turn on a single AF10000W-LG, turn on the air switch, then press the circular button (more than 3 AF10000W-LG has built-in BMS (Battery Management System), which can seconds) on / off button, the LED flashes and the battery works normally. L1 to L6 display the battery manage and monitor cells information including voltage, current, and temperature.
  • Page 5: Led Indicator Definition

    Discharge and then release the button. When all slave packages are closed, the master mode). For a single AF10000W-LG, turn off the Circular weak current switch. For multiple Battery Level Indicator package will be closed (hibernation mode). For a single LV -BAT -W10.24Ac, turn off...
  • Page 6 Quantit Quantit Battery box Wall mounting bracket Ground screw Hanging bracket Packing materials and components may get damaged during transportation. Therefore, it is recommended to check the condition of outer packing materials Bottom support bracket before installing the battery. Check the surface of packing materials for any damage such as holes or cracks.
  • Page 8 AF10000W-LG Fastening Screw Bottom bracket...
  • Page 9 1. Load power exceeding 10kW requires at least 2 units Parallel operation. 2. The maximum number of Number of parallel machines is 15. The power of the inverter selected for the battery module must be less than the maximum output power of the battery module.
  • Page 10 Warning For the inverter with only one battery input port, the wiring method of the combiner box must be added. For 2 units -15 units is 10KW - 20KW. (The number of units in the middle of the diagram is omitted, the length of the two positive and negative poles connecting lines must be the same.) Warning...
  • Page 11 Warning When using an inverter of 10kW or above, the positive and negative ports of each battery must be connected to the combiner cabinet in the wiring method shown in the figure below. For 2 units -15 units is 20KW - 70KW. (The number of units in the middle of the diagram is omitted, the length of the two positive and negative poles connecting lines must be the same.) COMBINER BOX...
  • Page 12 to Inverter to Inverter...

Table of Contents