Download Print this page

Advertisement

Quick Links

POWER POST
INSTALLATION GUIDE
DISCOVER MORE
For more Saris
Infrastructure products,
scan the QR code or visit
sarisinfrastructure.com

Advertisement

loading
Need help?

Need help?

Do you have a question about the POWER POST and is the answer not in the manual?

Questions and answers

Summary of Contents for Saris POWER POST

  • Page 1 POWER POST DISCOVER MORE For more Saris Infrastructure products, INSTALLATION GUIDE scan the QR code or visit sarisinfrastructure.com...
  • Page 2 Tell Us What You Think! Sarisinfrastructure.com/product/power-post Submit Your Installation Photos! Nothing makes us happier than seeing our infrastructure products out in the wild! Submit your photos at the link below. www.sarisinfrastructure.com/contact/submit-photos...
  • Page 3 Congratulations on choosing a world-class solution for eBike charging! The Power Post is a secure, super-fast solution to keeping electric bikes safe while they charge. With space for up to 2 bikes and an integrated outlet for charging eBikes while parked, the Power Post is the simple, affordable solution for eBike parking.
  • Page 4 Dimensions and Setbacks Dimensions Recommended Setbacks...
  • Page 5: Tools Required

    Electrical Outlet Details • Outlet type: NEMA 5-15R • Rated up to 15A 125V • 2 Pole - 3 Wire Grounding (2P+E) • Weatherproof with gasket (IP54 with Cover Closed) • Operating Temp: -25 C (-13 F) to +40 C (104 F) Tools Required •...
  • Page 6: Electrical Installation

    Electrical Installation 1. Place unassembled units into desired installation location and mark floor where anchor holes are to be placed. 2. Have a certified electrician run power through floor and up through baseplate of unit or run conduit through the knockout near the base.
  • Page 7: Anchor Installation

    Anchor Installation *DO NOT THROW AWAY THE PENTA SOCKET AFTER COMPLETING THE INSTALLATION. YOU WILL NEED IT TO REMOVE THE EQUIPMENT IF THAT IS NECESSARY. 1. Place the rack in the desired location (see setbacks document). Use a marker or pencil to outline the holes of the flange onto the base material.
  • Page 8 4. Before starting to drill the hole, it is important that eye and ear protection are used. Make sure the hammer drill is in the hammer mode and start drilling your hole. Continue drilling until the tape on the bit or the drill gauge meets the base material- this means that the required depth has been reached.
  • Page 9 6. Next, insert the drop in anchor with the open side up. Tap lightly to get the anchor flush with the base material. 7. Now, take the setting tool and insert it into the anchor. Strike the setting tool with the hammer several times until the set tool no longer moves down.
  • Page 10 (3) its failure resulted from a defect in material or workmanship and not from normal wear expected in the use of the product; (4) the product or part is delivered, freight prepaid, to Saris Products.