!
CAUTION! Always use care and wear appropriate PPE when working with chemicals!
Example Installation
WATER INLET
(1/2" NPT)
ANGLE SEAT
VALVE
WATER PRESSURE
GAUGE
8 1/2"
CHEMICAL SUCTION
LINE (6 FT.)
FOAMER
BODY
HOSE BARB
CONNECTION
2
Dilution
A. Place chemical container below unit
B. Select a metering tip for desired dilution ratio
C. Install the metering tip by screwing it onto the
hose barb for the chemical inlet
D. Install chemical suction line to hose barb
E. Connect suction line to chemical solution
Metering Tip Calculator
Mobile App:
Last Updated: 03/13/2023
20 1/8"
18 7/8"
1/2" QUICK FIT PLUG
(REMOVE FOR
SATELLITE INSTALL)
SOLENOID
AIR INLET
(1/2" QUICK FIT)
AIR
REGULATOR
AIR
PRESSURE
GAUGE
FOAM ENHANCER
HOSE
(3/4" - 1" X 10' DEPENDING
ON FLOW RATE)
Entryway Timed Venturi Foamer
1
Install and Connect
A. Mount SLX plate to wall
B. Flush supply lines
C. Connect supply lines:
• Compressed air (1/2" tube)
• Water (1/2" FNPT)
D. Connect discharge hose to
1/4" x4
spreader nozzle and hose barb
1/2" x4
on foamer
CONTROLLER
E. Mount the spreader nozzle to
COLOR HMI, 2"
wall near door
• V14: 4.5" height
• V25 or V42: 5-6" height
ELECTRICAL
ENCLOSURE
115VAC
NEMA 5-15P PLUG
3
Operation
A. Plug in power cord, 115VAC
B. Adjust timer for activation and interval settings
Default: 10 sec. on / 15 min. off
C. Engage water and air supply
D. Press START to activate system
E. Observe foam consistency - adjust air or water
pressure as needed (min water pressure 35 PSI)
F. Press BOOST to reduce interval time
G. Press START again to halt system
M2702 - SLX-ET-VF Quick Start Guide
Quick Start Guide
V14: 4.5"
V25 or V42: 5-6"
Need help?
Do you have a question about the SLX-ET-VF and is the answer not in the manual?
Questions and answers