CAUTION! Wear appropriate PPE when working with chemicals. Backflow prevention required.
1
Install and
Connect
A. Mount SLX enclosure
to wall
B. Flush supply lines
C. Install backflow
prevention per local
guidelines
D. Connect supply lines:
• Compressed air
(1/4" FNPT)
• Water (3/4" FNPT)
E. Connect discharge
hoses
F. Place chemical
containers below unit
SANITIZER DISCHARGE BALL VALVE
2
Dilution
A. Select a metering tip for desired dilution ratio
B. Install the metering tip by screwing it onto the hose
barb for each chemical inlet
C. Install chemical suction lines to hose barbs
D. Connect suction lines to chemical solutions
Metering Tip Calculator
Mobile App:
Last Updated: 01/20/2023
SANITIZER SUPPLY BALL VALVE
SANITIZER WATER PRESSURE GAUGE
SANITIZER CHEMICAL INLET
DOOR LOCK
SANITIZER
SANITIZER SOLUTION LINE WITH
STRAINER & CERAMIC WEIGHT
SANITIZER DISCHARGE HOSE (RED)
Venturi Sanitize Foam
Quick Start Guide
WATER SUPPLY (35 - 125psi)
3/4" NPT CONNECTION
FOAMER SUPPLY BALL VALVE
3
Operation
A. Take hold of spray wand for either system
B. Open discharge ball valve
C. Open water supply valve - unit will spray
D. Verify water pressure is at least 35 PSI
E. [Foamers] Open air supply valve - unit will foam
F. [Foamers] Adjust air pressure to alter foam quality
G. Foam equipment, from bottom to top, and rinse
before it dries
H. Sanitize from top to bottom
I.
When complete, turn off supply valves
J.
Store hose depressurized, with discharge valve
open, and coiled properly to prevent kinks
M2444 - SLX-MS2-VS-VF Quick Start Guide
Example Installation
FOAMER WATER PRESSURE GAUGE
AIR SUPPLY
AIR REGULATOR
AIR PRESSURE GAUGE
AIR SUPPLY BALL VALVE
FOAMER CHEMICAL INLET
FOAMER
FOAMER SOLUTION LINE WITH
STRAINER & CERAMIC WEIGHT
FOAMER DISCHARGE HOSE (BLUE)
FOAMER DISCHARGE BALL VALVE
Need help?
Do you have a question about the SLX-MS2-VS54-VF14 and is the answer not in the manual?
Questions and answers