ALTECH ZDM-01 / 02 Complete Installation: How To Install: 1. Installed the ③ fixing base on the top of 1st leaf door(closing to the upper hinge), make fixing base parallel to the gate side line besides of upper hinge, the distance from gate side should be 120-210mm as the Fig 2.
Page 4
ALTECH ZDM-01 / 02 3. Tighten up the screws ⑩ M4.8*32 as Fig 4. Fig 4 4. To install the ⑧ bottom guide roller, use φ3.2 and φ13 drills to drill holes in the bottom of the 2nd leaf door based on the following dimensions. When holes are ready, install the ⑧ guide roller with screws ⑩...
Page 5
ALTECH ZDM-01 / 02 6. Install the 2nd leaf door in correct place and tighten up the hinge screws as Fig 7. Fig 7 7. Fold the 2 leaves door, insert the ② gear rack rod into the fixing base, and ensure that the gear rack extends beyond the edge of the door by more than 110mm, and then install ④...
Page 6
ALTECH ZDM-01 / 02 9. Tighten up screws ⑩ M4.8*32 for ④ gear connection rod as Fig 10. Fig 10 10. Fix the ⑨ connection rod on the ② gear rack rod and the ① gate bracket with Latch as Fig 11.
Page 7
ALTECH ZDM-01 / 02 12. After installation all ok, tighten up the nut of the ⑨ connection rod as Fig 13. Fig 13 13. Close the door to the correct position, use pen or other tools to mark the position of the rubber stopper hole, and drill with a φ10 drill bit.