Download Print this page

Hypontech HP51100 Quick Installation Manual

Hide thumbs Also See for HP51100:

Advertisement

Quick Links

HP51100
1.
Product Overview
Parts Introduction(Battery System)
Top View
5
4
7
6
D
[1]
1 .
Power Button
2.
CAN 1 Port
4.
Port Negative
X2
5.
Port Positive
X2
[3]
DC Isolator
8. ADD Switch
7.
[ 1 ] In parallelized batter y system, CAN 1 Port on the Master unit must be connected with inverter.
[2] In parallelized batter y system, CAN 2 Port must be connected with CAN 1 Port of next batter y system.
[3] Add switch is under the metal lid.
Dimensions: W×H×D= 420 × 730 × 199mm
2.
Packing List (Single Unit)
Battery
Mounting
Mounting
Documents
System
Plate
Accessories
1 pcs
1 pcs
1 pcs
1 psc
Configured Parts in Single Unit
Output
Power Cable (+)
1 pcs
1.2m
Output
1 pcs
Power Cable (-)
1.2m
Grounding
1 pcs
Cable
1.5m
Output
Communication
1 pcs
Cable
1.5m
Waterproof
1 pcs
module
H838-00139-01
W
2
3
1
8
H
[2]
3. CAN 2 Port
6. Grounding Point
3.
Installing
Installation Requirements
1. Please install the battery system in places that
can avoid inadvertent contact.
2. Please install the battery on solid/smooth surfaces.
3. The battery(s) should not be installed near inflammable
or explosive objects.
4. The installation place should be clean and well ventilated.
5. The installation place should be convenient for operation on
and maintenance.
AVOID
Direct
Rain
Snow
Sunlight
Exposure
Lay up
1
3.1
Installation Clearance
≥200mm
3.2
Mounting
NOTICE
The battery system is 55kg. It's necessary to arrange more than 1 person to install battery module if without lifting
equipment, more than 2 person when install battery module in higher position.
Confirm that the DC isolator is in the OFF state to ensure that there is no live operation.
3.2.1 Floor Mounting
Step 1: Place the mounting plate close to the wall and floor firmly;
Mark the 2 locating points to wall with hole on the mounting plate as shown below.
Step 2: Lift up the mounting plate and align the other 2 holes with the 2 location points marked on the wall in step 1;
Mark the 4 fixed position with the mounting plate.
Measuring distance from floor to bottom of the mounting plate can also ensure the height (76~80mm).
Step 3: Drill 4 holes on the wall using an impact electric driller. Hole diameter : 12mm; Hole depth:70mm.
Step 4: Fix the mounting plate with the expansion screw packed in mounting accessories. Tightening Torque: 12N·m.
Step 5: Remove the cover from the batter y system (Use T20 screwdriver);
Hang the batter y system on the mounting plate.
Step 6: Use M5 bolt in mounting accessories to fix the batter y system for keeping horizontal (Use T25 screwdriver).
Step 1
locating point
-20°C~60°C
5%~95%RH
Step 4
Altitude<3000m
200mm~300mm
200mm~300mm
Step 2
locating point
4X Φ12mm
Depth:70mm
76~80mm
Step 5
3
1
2
2
≥200mm
Step 3
Step 6

Advertisement

loading
Need help?

Need help?

Do you have a question about the HP51100 and is the answer not in the manual?

Questions and answers

Summary of Contents for Hypontech HP51100

  • Page 1 Installation Clearance HP51100 H838-00139-01 Product Overview Parts Introduction(Battery System) ≥200mm 200mm~300mm 200mm~300mm ≥200mm Top View Mounting NOTICE The battery system is 55kg. It’s necessary to arrange more than 1 person to install battery module if without lifting equipment, more than 2 person when install battery module in higher position.
  • Page 2 3.Tighten cover to the main body. installed properly. 4. Ensure definition of 2 lines before connect to inverter Select the right battery model in Parameter Settings of Inverter on Hypon.Cloud: Select “Hypontech-LV”. Notice: If there is an unused terminal, please seal it with protective cap.
  • Page 3 Installing the PE Cable in Parallelized Battery System Part List (N-unit in Parallelized Battery System) Connect the PE cable first before installing the equipment. Disconnect the PE cable last when dismantling the equipment. M5 T25 M5 T25 The PE terminal is equipped at the interface of the Battery System. Object Description 2.5N·M...
  • Page 4 MAX. 10 units Battery Model Setting for Parallelized Battery System Select the right battery model in Parameter Settings of Inverter on Hypon.Cloud: Select “Hypontech-LV”. Connect to Inverter & Commissioning for Parallelized Battery System Double check all the power cables and communication connectors have been correctly wired NOTICE and tightened.