INSTALLATION and OPERATION MANUAL INSTALLATION and OPERATION MANUAL 1.2. Requirements for installation. • The length of connecting pipes between the water tank and consumer must be as short as possible. • Before connecting the boiler to the installation, check all screw connections (bolt inspection cover flange, plug and anode).
Page 4
INSTALLATION and OPERATION MANUALINSTALLATION and OPERATION MANUAL PS series - Inlet/Outlet arrangement: SPBM series - 100 angle degrees. Inlet/Outlet arrangement: 90 angle degrees Models PS - without coil for easy and convenient installation. Models PS1 - with one coil Models PS2 - with two coils Possible installation in the corner of boiler Product features: room.
Page 5
INSTALLATION and OPERATION MANUAL INSTALLATION and OPERATION MANUAL 2.2. Electric heating element /option/ All buffer tanks are equipped with Outlet connection 1 ½“ for electric heating element: 3000W/230V; 4500W/230V; 6000W/230V; 7500W/400V. The connection of the electric heating element to the electric power supply must be done by a qualified ...
INSTALLATION and OPERATION MANUALINSTALLATION and OPERATION MANUAL 3. TECHNICAL PARAMETERS BUFFERS - Р series 3.1. Model Р - without coIl P 300 P 500 P 800 P 1000 Capacity 1000 Height without insulation / with insulation H, Hi, mm 1410/1460 1610/1660 1860/1910 2040/2090 Minimal vertical clearance 1430 1640 1900 2075 Diameter without insulation /with insulation D, mm...
Page 7
INSTALLATION and OPERATION MANUAL INSTALLATION and OPERATION MANUAL 300 - 5000 P 1500 P 2000 P 2500 Р 3000 P 5000 Capacity 1500 2000 2500 3000 5000 Height without insulation / with insulation H, Hi, mm 2150/2220 2132/2182 2482/2532 2246/2296 2940/2990 Minimal vertical clearance 2220 2220...
Page 8
INSTALLATION and OPERATION MANUALINSTALLATION and OPERATION MANUAL 3.2. Model РR - with one coil PR 300 PR 500 PR 800 PR 1000 Capacity 1000 Height without insulation / with insulation H, Hi, mm 1410/1460 1610/1660 1860/1910 2040/2090 Minimal vertical clearance 1430 1640 1900 2075 Diameter without insulation /with insulation D, mm...
Page 9
INSTALLATION and OPERATION MANUAL INSTALLATION and OPERATION MANUAL R 300 - 3000 PR 1500 PR 2000 PR 2500 PR 3000 Capacity 1500 2000 2500 3000 Height without insulation / with insulation H, Hi, mm 2150/2220 2132/2182 2482/2532 2246/2296 Minimal vertical clearance 2220 2220 2542...
Page 10
INSTALLATION and OPERATION MANUALINSTALLATION and OPERATION MANUAL 3.3. Мodel РR2 - with two coils PR2 300 PR2 500 PR2 800 PR2 1000 Capacity 1000 Height without insulation / with insulation H, Hi, mm 1410/1460 1610/1660 1860/1910 2040/2090 Minimal vertical clearance 1430 1640 1900 2075 Diameter without insulation /with insulation D, mm...
Page 11
INSTALLATION and OPERATION MANUAL INSTALLATION and OPERATION MANUAL R2 300 - 3000 PR2 1500 PR2 2000 PR2 2500 PR2 3000 Capacity 1500 2000 2500 3000 Height without insulation / with insulation H, Hi, mm 2150/2220 2132/2182 2482/2532 2246/2296 Minimal vertical clearance 2220 2220 2542...
INSTALLATION and OPERATION MANUALINSTALLATION and OPERATION MANUAL 5. TECHNICAL PARAMETERS BUFFERS - SРBM series 5.1. Model SРBM - without coil SPBM SPBM SPBM SPBM SPBM SPBM 1000 1500 2000 Capacity 1000 1500 2000 Height without insulation / H, Hi, mm 1410/1460 1700/1750 1838/1888 2039/2089 2140/2290 2131/2181 with insulation Minimal vertical clearance 1430 1727 1877...
Page 19
INSTALLATION and OPERATION MANUAL INSTALLATION and OPERATION MANUAL 5.2. Model SРBM R - with one coil SPBM R SPBM R SPBM R SPBM R SPBM R SPBM R 1000 1500 2000 Capacity 1000 1500 2000 Height without insulation/ H, Hi, mm 1410/1460 1700/1750 1838/1888 2039/2089 2140/2290 2131/2181 with insulation Minimal vertical clearance 1430...
Page 20
INSTALLATION and OPERATION MANUALINSTALLATION and OPERATION MANUAL 5.3. Мodel SРBM R2 - with two coils SPBM R2 SPBM R 2 SPBM R2 SPBM R2 SPBM R2 SPBM R2 1000 1500 2000 Capacity 1000 1500 2000 Height without insulation/with insulation H, Hi, mm 1410/1460 1700/1750 1838/1888 2039/2089 2140/2290 2131/2181 Minimal vertical clearance 1430...
P 2000 1150x1150 1400x1400 mined to be defective in manufacture or ma- P 2500 1150x1150 1400x1400 terials, NES Ltd. will repair or replace the de- fective component or product. Dimensions of 11.2. Exclusions and Limitations of Warranty Buffer tank pallet Coverage (without insulation)
Technical Department. ter heaters set forth in brochures. 11.4. Limitation of liability e) NES Ltd. preserves the right, in case of re- NES Ltd. is not liable before the cus- placement, to deliver another model of water tomer, neither directly nor indirectly, for any...
Page 30
INSTALLATION and OPERATION MANUALINSTALLATION and OPERATION MANUAL...
Page 31
INSTALLATION and OPERATION MANUAL INSTALLATION and OPERATION MANUAL...
Page 32
ISO 9001 BUREAU VERITAS Certification tel.: +359 700 17 343 www.burnit.bg...
Need help?
Do you have a question about the SUNSYSTEM P Series and is the answer not in the manual?
Questions and answers