Download Print this page
Gira 0517 00 Installation Instructions
Gira 0517 00 Installation Instructions

Gira 0517 00 Installation Instructions

Powernet repeater

Advertisement

Quick Links

GIRA
Powernet Repeater
Info
Installation Instructions
Powernet Repeater Series-Mounting Device
System Information
This device is a product of the Gira-Powernet
technical knowledge obtained in instabus or Gira-Powernet
proper understanding.
The functionality of this device depends upon the software. Detailed information on loadable software
and attainable functionality may be taken from the manufacturer's ETS2 product database as well as
®
from the Gira-Powernet
Planning, installation and commissioning of the unit is done by means of the ETS2 software, Ver. 1.1
or later, as well as by the Gira-Powernet
Function
This repeater is provided for series mounting on a DIN top hat rail. The device repeats or amplifies the
signals within a wide-spread Gira-Powernet
three phases being actively coupled.
Whether the use of a repeater is necessary should be clarified at the preliminary planning stage within
the scope of determining the overall noise load of a Gira-Powernet
transmission tests should be made.
Connection
230 V AC ~
50 Hz
N L1 L2 L3
Powernet Repeater
®
EIB system and complies with EIBA directives. Detailed
EIB controller database.
®
EIB controller.
®
EIB system. Missing phase coupling is compensated, the
Switch off the mains voltage before establishing the
electrical connection.
The device must be snapped onto a DIN top hat rail. Establish
L1
connection as shown in the opposite illustration. It can be made
as single-phase or three-phase connection.
L2
Within one Gira-Powernet
L3
elimination filters, only one repeater each may be used. The
use of a repeater must be determined at the beginning of the
N
project planning stage. Subsequent integration entails the re-
programming of all Gira-Powernet
avoid overcoupling of signals from adjacent systems, the
signals of Gira-Powernet
from one another by band elimination filters. Avoid parallel line
arrangement of two adjacent Gira-Powernet
to eliminate signal overcoupling caused by line inductance and
capacitance. Installation should be made at the "star point" of a
Gira-Powernet
of a signal.
Assigning the Physical Address
Press programming key
up. It goes out when the physical address is taken over.
12/97
®
EIB training courses is a prerequisite to
®
EIB system. In case of doubt,
®
EIB installation delimited by band
®
EIB components used. To
®
EIB installations must be decoupled
®
EIB system to obtain maximum possible reach
on the repeater. Red LED
Art. Nr.: 0517 00
®
EIB installations
lights
Page 1 of 2

Advertisement

loading
Need help?

Need help?

Do you have a question about the 0517 00 and is the answer not in the manual?

Questions and answers

Summary of Contents for Gira 0517 00

  • Page 1 Whether the use of a repeater is necessary should be clarified at the preliminary planning stage within ® the scope of determining the overall noise load of a Gira-Powernet EIB system. In case of doubt, transmission tests should be made.
  • Page 2 Gira Giersiepen GmbH & Co. KG Postfach 1220 D-42461 Radevormwald Telefon: +49 / 21 95 / 602 - 0 Telefax: +49 / 21 95 / 602 - 339 Internet: www.gira.de Powernet Repeater 12/97 Page 2 of 2...