  • Page 1 LADDER TRAY RACK INSTALLATIONS w w w. s i e m o n . c o m...
  • Page 2: Table Of Contents

    Table of Contents Safety Information ........3 CTR Diagram .
  • Page 3: Safety Information

    Before loading equipment on to the cable tray rack, be sure to torque all mounting hardware provided with the rack to a setting of 75in-lbs. - The maximum load capacity of the cable tray rack should not exceed: CTR-02-01 - 9kg (20lbs) CTR-04-01 - 8kg (40lbs) CTR-06-01 - 27kg (60lbs) - The cable tray racks are intended to be installed in accordance with all applicable requirements of the National Electrical Code (NEC) and the local Authority Having Jurisdiction (AHJ).
  • Page 4: Ctr Diagram

    CTR-04-01 Diagram...
  • Page 5: Hardware

    HARDWARE TOOLS REQUIRED 1/2” Socket Wrench 1/2” Box Wrench...
  • Page 6: Below Tray Installation - Parallel - Ladder Mounted

    PARALLEL – BELOW CABLE TRAY (LADDER MOUNTED) Torque all hardware to 75in-lbs...
  • Page 7: Below Tray Installation - Parallel - Rail Mounted

    PARALLEL – BELOW CABLE TRAY (RAIL MOUNTED) Torque all hardware to 75in-lbs...
  • Page 8: Side Wall Installation

    SIDE WALL MOUNTED Torque all hardware to 75in-lbs...
  • Page 9: Rack Bonding

    RACK BONDING...
  • Page 10: Notes

    C. Never install this device in a wet location. D. Never install wiring during a lightning storm. Global Headquarters Watertown, Connecticut USA Tel: (1) 866-548-5814 For a complete listing of our global offices visit our web site www.siemon.com...