Download Print this page

Symphony QS-SYK-1049 Setup Instructions

10 x 10 inline

Advertisement

Quick Links

© 2024
QS-SYK-1049 - Symphony 10' x 10' Inline
10'
10'
Plan View
SETUP INSTRUCTIONS
If you would like to tell us about your experience with your setup instructions please email us at info@classicexhibits.com

Advertisement

loading
Need help?

Need help?

Do you have a question about the QS-SYK-1049 and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for Symphony QS-SYK-1049

  • Page 1 © 2024 QS-SYK-1049 - Symphony 10’ x 10’ Inline 10’ 10’ Plan View SETUP INSTRUCTIONS If you would like to tell us about your experience with your setup instructions please email us at info@classicexhibits.com...
  • Page 2 © 2024 Plan View = 1 sq ft...
  • Page 3 © 2024 General Information General Setup Instructions WARNING - Read entire setup instruction manual prior to unpacking parts and pieces. - The setup instructions are created specifically for this configuration. - Setup instructions are laid out sequentially in steps, including exploded views with detailed explanation for assembly.
  • Page 4 © 2024 Tool-less Frame Assembly Slide connector across seam of extrusions. Disassembly Tighten all knobs. Straight Connection 1) Loosen all knobs. When assembling frame, first attach all straight Straight Connector 2) Slide connectors off of one extrusion. connectors, then attach corner connectors.
  • Page 5 © 2024 SEG Graphic Installation The Perfect Fit SEG Graphic Installation in 3 Steps STEP 1: Attach Corners STEP 2: Attach Middle STEP 3: Attach Sides Always insert graphic into each alternate corner, then into the sides of the frame. Otherwise the graphic will not fit into the frame correctly.
  • Page 6 © 2024 Case Packing SYK-1049 Backwall Top View of Each Level 11,12 Counter 5,7,8,10 Workstation Legs Graphics Graphic Setup Hardware Monitor Mount Counter Level 1 Level 2 Level 3 Level 4 Level 5 Level 6 (Bottom level) Case 1 of 2...
  • Page 7 © 2024 Case Packing SYM-408 Counter Top View of Each Level Spacer Box Counter Top (empty) Left & Right Back Panel Front Panel Side Panels Shelf Lights Standoffs & Key Shelf Supports Level 1 Level 2 Level 3 Level 4 (Bottom level) Case 2 of 2...
  • Page 8: Front View

    © 2024 Backwall Frame Assembly Item Qty. Description Steps: 45”h TSP49 Vertical Extrusion Refer to the Tool-less Frame Assembly general information page. 41”h TSP49 Vertical Extrusion 45”h TSP49 Vertical Extrusion 1) Assemble vertical extrusions [1-2], [3-4], [11-12] & horizontals [5-6-7], [8-9-10] 41”h TSP49 Vertical Extrusion together, using Tool-less Spline Connectors...
  • Page 9 © 2024 Fabric Graphics Application Steps: SEG Graphic Installation 1) Apply SEG Graphic to front of assembled frame. Insert narrow side of STEP 1: Attach Corners silicone welt into the channel at corner 1, with fabric to the outside. Repeat for opposite corner 2, then corner 3, Always insert graphic then corner 4.
  • Page 10: Top View

    © 2024 Backwall Attachments Steps: Workstation Bracket Attachment 1) Attach Workstation Mounting Bracket Hook the Mounting Bracket Slide bracket forward, then Tighten thumb screws to to backwall vertical as shown. over the vertical extrusion. down onto V4 connector. secure connection to inside Workstation Bracket Attachment detail.
  • Page 11 © 2024 Backwall Attachments (cont’d) Steps: 1) Attach Monitor Mount to backwall vertical as shown. Monitor Mount Bracket Attachment detail. Monitor Mount Attachment Hook the Mounting Bracket Slide bracket forward, then over the vertical extrusion. down onto V4 connector. V4 connectors stay permanently attached to vertical extrusion.
  • Page 12 © 2024 SYM-408 Counter Assembly Steps: 1) Use screw caps to secure side panels to front & back panels. 2) Connect shelf supports with Velcro inside of panels, then place shelf on top of supports. 3) Attach Counter Top to assembled pedestal base. See Counter Top Attachment detail.