Disclaimer The information in this document is subject to change without notice and describes only the product defined in the introduction of this documentation. This documentation is intended for the use of Raycap customers only for the purposes of the agreement under which the document is submitted, and no part may be used, reproduced, modified or transmitted in any form or means without the prior written permission of Raycap. The documentation has been prepared to be used by professional and properly trained personnel, and the customer assumes full responsibility when using it.
® electrical protection at the RRH and BBU. PowerPlus is Raycap’s solution for power transmission to the RRH units of a DAS Telecommunication site. PowerPlus is a system installed at the PSU output that boosts the voltage at the base of a cellular site to overcome the voltage drop on the DC power cables that provide power to the RRHs.
PowerPlus System 100-3R-1U-X Series INSTALLATION INSTRUCTION & OPERATION MANUAL Appendix: Raycap PowerPlus 100-3R-1U-X Trouble Shooting Guide General Notes 14.1 • When installing modules, it takes about 20 seconds for the firmware to initialize. Never install and then remove a module without time for the firmware to fully initialize. • If a site is visited and the PowerPlus modules have their firmware updated, the opportunity to check the correct operation of the system’s electronic bypass circuitry should be taken (Gen 1 PowerPlus only).
Need help?
Do you have a question about the PowerPlus System 100-3R-1U-X Series and is the answer not in the manual?
Questions and answers