Page 1
SGS STC900 9-PIECE GARAGE STORAGE SYSTEM OWNER’S MANUAL FOR YOUR SAFETY PLEASE READ THESE INSTRUCTIONS CAREFULLY AND RETAIN THEM FOR FUTURE USE.
Page 2
When you open the cartons, carefully check the contents and make sure there is no damage. If you have any problems or you find any parts dam- aged or missing, please contact us first at support@sgs-engineering.com WARNING Do not return the product to the store before contacting us. Do not dispose of your cartons until you are completely satisfied with your purchase.
Carefully set the locker / 2-door base cabinet / 1-drawer 2-door cabinet on its back, then attach the adjustable leveling feet to the locker or the cabinet using sixteen M6x12 flat-head bolts with a Phillips screw driver. WWW.SGS-ENGINEERING.COM PAGE 6 PAGE 7...
Due to the spacing of the wall studs, some wall cabinets may only have one stud to attach to; this is acceptable if the wall cabinets are bolted together. WWW.SGS-ENGINEERING.COM PAGE 8 PAGE 9...
Page 6
Repeat for the other locker and wall cabinets. Repeat for the other locker and cabinets. Tighten all the bolts to fasten the cabinets and level the cabinets. The installation of the 9-piece garage system is finished. WWW.SGS-ENGINEERING.COM PAGE 10 PAGE 11...
OPERATION Drawer removal Pull the drawer out so that it is almost a fully extended. Push up on the black release lever on one side, while pulling down on the black release lever on the other side. While holding the levers in the positions as illustrated below, pull the drawer outward until it is released from the drawer slide.
Need help?
Do you have a question about the STC900 and is the answer not in the manual?
Questions and answers