Vent TV115803 TITAN VERSA High-Flow Vent Valve Assembly This manual is intended for users needing to install TITAN VERSA High- Flow valves on their own. The TITAN VERSA High-Flow Evacuation (Evac) valve reduces pump down times by 50%. The High-Flow vent valves greatly reduce typical vent times thereby improving overall cycle times.
Page 2
3. Remove the aluminum electrical board cover with a 2mm hex wrench. 4. Remove Accessory Cables: Disconnect all wires, except middle COM terminal, from the J8 (Relay Contacts) terminal block using a small flat head screwdriver. 5. Remove the two blue 0V wires connection from the 0V terminal block.
Page 3
ACCS 2 cable (LCA074) to left side of bracket. ACCS 2 ACCS 1 8. Re-connect the ACCS cables to terminal block J8 (Relay Contacts) on Titan Versa electrical board per the table below. Wire color Termination Accessory 1...
Page 4
Accessories). 2. If applicable change Accessory 1 to High-Flow Evac and press Save. See the main Titan Versa User Manual for details on all the various High-Flow Evac settings. 3. If applicable set Accessory 2 to High-Flow Vent and press save.
Page 5
4. Run preliminary leak tests cycles with the covers off and verify the High-Flow valve LED’s in valve DIN connector modules are lighting 5. Leak Test Instructions: Attach an NW-25 blank off to Inlet Tee (for Compact and Tower Versa, blank off pump port as well). In Vacuum test mode, put leak detector into a test cycle.
Maintenance Valves should be inspected and cleaned every 100,000 cycles or every two years (whichever comes first). Valve plunger seals and the internal valve body should be lightly cleaned with methanol or water if dirty or contaminated. Follow the valve replacement instructions below to inspect valves.