Inflatable
Stanchion
Air Structures International
HPML™ AD
ILITE module
ILITE Carry Bag
Sealed
Battery
Step by step
instructions to set
up your ILITE
Component List:
1 x HPML™ AD ILITE module (pictured)
1 x Inflatable stanchion (pictured)
1 x ILITE Carry Bag
1 x Pump and pump hose
1 x Battery Cable
1 x 14ah 12V Lead Acid Sealed Battery
1 x Battery Charger
1 x Universal Plug
1 x Battery Bag
3 x Ground Pegs
1 Set Guide Lines and Ground Pegs
3 x Sand Bags
IMPorTAnT WArnInGS:
• Optimum stanchion air pressure =
8 full pump cycles (up & down =1 cycle).
• Always ensure butterfly bolt is completely
tightened to fully secure the lamp unit.
• Before using battery, place inside the
supplied battery-bag.
• Always secure with the additionally
supplied guide lines in windy conditions.
• Always remove residual air after use with
deflation option on pump.
• Always fully re-charge battery after use.
• The LED module needs to connect to a 12V DC
battery which MUST have stable voltage output.
The maximum voltage operation range for
the LED module is 10.4 to 14V. Any voltage
over 14V may cause damage to the internal
electrical components of the LED module.
Need help?
Do you have a question about the ILITE and is the answer not in the manual?
Questions and answers