  • Page 1 Quick Installation HC-EV-AC-07K/11K/22K Smart Energy, Sustainable Solutions.
  • Page 2: Wall Mount Installation

    1 Wall-Mount Installation 1.1 Unpack and inspect components EV Charger*1 Positioning Cardboard*1 User Manual*1 Wall-Mount Bracket*1 AC Incoming Line Crimping RFID Card*2 Phillips Pan Head Screw*2 Expansion Bolt*4 Terminal(7KW*3;11/22kW*5) Production Test Report Qualified Certificate Quality Assurance Card 1.2 Installation tools Impact drills, φ10 impact drills, Phillips screwdrivers, marking pens, wire strippers, diagonal pliers, goggles, protective gloves.
  • Page 3 4. Lift the top cover from the open slit in the direction of the arrow with force. 5. Remove the top cover and place it in a safe location to avoid damage. 6. Use a Phillips screwdriver to remove 9 Phillips pan head screws on the inner cover of the charger and open the inner cover. 7.
  • Page 4: Installation Diagram

    1.5 Installation Diagram 1. Inspect the packaging 2. Take out the charger 3. Push inwards the clip 4. Open the top cover 5. Remove the top cover 6. Remove fixing screws*9 7. Remove AC inlet cable gland 8.Remove the AC inlet cable clamp 9.
  • Page 5 2. Pillar-Mount Installation(Optional) 2.1 Unpack and inspect components EV Charger*1 Positioning Cardboard*1 User Manual*1 Wall-Mount Bracket*1 AC Incoming Line Crimping RFID Card*2 Phillips Pan Head Screw*2 Expansion Bolt*4 Terminal(7KW*3;11/22Kw*5) Fixed screw M4X12*6 Back to back Pillar *1 M10X100 expansion bolt*4 Production test report (pre-tightened on the pillar) Qualified Certificate...
  • Page 6 6. Push inwards against the clip in the direction shown by the arrow and then push upwards to open the top cover clip. 7. Lift the top cover from the open slit in the direction of the arrow with force to complete the removal of the top cover of the charger.
  • Page 7: Pre-Installation Preparation

    9. Remove inner cover screws 10. Suspend the charger 11. Fix lower screw 12. Remove AC inlet cable gland 13. Remove AC inlet cable clamp 14. Connect AC inlet cable 15. Install the cable clamp 16. Fix the cable gland 17.
  • Page 8 3.3 Installation steps 1. Installation CT Open the buckle 1)Open the package and disassemble 3)The cable is inserted along the direction 2)Open the buckle along the position the current transformer of the arrow Secure with cable ties 5)Insert the three-phase cable into the 6)Secure with cable ties along the 4)Buckle up current transformer in sequence...
  • Page 9 3. Connect the 485 port of the DLB meter to the J11-485 port of the EV Charger (J11 terminal is at the top right corner of the EV Charger board, refer to the wiring diagram below). Snap the meter into the rail as shown. The rail-mounted meter is designed to slide into place, ensuring that the meter is firmly fixed to the rail.
  • Page 10 3.4 Precautions 1. It should be installed and powered on by a professional. 2. Throughout the installation process, be sure to comply with local electrical codes and standards. 3. Use the correct wire size and select the appropriate wire cross-section according to the current size. 4.