Page 1
XESS. Your decision to trust our product means a lot to us. At XESS, our focus is on technical excellence. Our batteries are the result of rigorous engineering and precise craftsmanship, and we have invested heavily in ensuring that each battery delivers outstanding performance and reliability.
Page 2
6.4.2. Maintaining Accurate SOC in Self-Managed Application 4.2. XESSION-5120 Battery Module & Box Contents 7: Maintenance 4.3. XESSION-5120 Battery Module Interface and Status LEDs 4.4. XESSION-5120 Battery Module Specification 8: Adding Batteries to an Existing System 4.5. XESSION-5120 Battery Module Specification...
Page 3
Self-managed), it's optimized for peak performance in o -grid applications. Its robust 5.12 kWh capacity Ensure a fire extinguisher is readily available before installation and use. and sleek 19−inch form factor seamlessly integrate into 19−inch data racks or XESS ION prewired battery cabinets.
Page 4
M6 × 16 Bolt 3.8. Wet Battery If the battery is submerged in water, stop using it immediately and seek assistance from XESS Energy employees. If you need to disconnect power or are in the same liquid environment as the battery, wear rubber gloves and boots beforehand to protect from electric shock.
Page 5
Charge: -10°C to 50°C / Discharge -20°C to 50°C Operating Temperature Range Self-Managed Charge: 0°C to 50°C / Discharge -5°C to 50°C There are LEDs on the front panel of XESS ION 5120 that indicate the battery state (Status, Error, and SOC). Operating Humidity Up to 95% (non-condensing) BMS Over-Voltage Cell Level Protection 3.65 V DC...
Page 6
Pre-wired Quick Connector with 4 AWG UL Cable For a safe, long-lasting operation, it is essential to choose an appropriate location for battery installation. If you opt not to purchase our XESS ION battery cabinets, please install the battery within a 19" data rack DC Circuit Breaker...
Page 7
5.6.1. Minimum Cabinet Clearances Minimum Clearance Requirements: 5.4. Tools The Tools below are necessary for the installation of the XESSION-5120. Please make sure you are well-pre- pared before you start with your installation. Front Door Front Door Front Door ≥...
Page 8
5.8. Inserting and Fastening Battery Modules 5.10. Connecting to Inverter The XESSION-5120 battery modules can be easily installed into the XESS ION battery cabinet. Starting for Ensure you follow your inverter manufacturer’s guidelines. Connect the main battery DC cables to the the bottom of the cabinet, slide the batteries in one by one until the desired amount is installed or the respective positive and negative battery connections with the inverter.
Page 9
5.11. Switching to Self-Managed – No Communication Mode 5.12.2 Connecting Parallel Cabinets to The Inverter The XESSION-5120 can operate without communication in Self-Managed (No Communication) Mode allowing connection to 3rd party charging sources that allow configuration of charging settings. This allows...
Page 10
6. Commissioning 6.1. LED Status The XESSION-5120 has LEDs to allow clear visualization of the status of the battery. These LEDs are simple and intuitive to understand. Status Description An error has occured. ON / OFF Error There are no active errors.
Page 11
• Look for any signs of animals, insects, or other creatures nesting in or around the battery solution. time for removal from service or replacement, you can return the battery to XESS Energy for repurposing or • Remove any foreign objects that have accumulated in or around the cabinet.
Need help?
Do you have a question about the XESSION-5120 and is the answer not in the manual?
Questions and answers