Download Print this page
MAHA MPJ 4.0/750 1S HM Original Operating Instructions
MAHA MPJ 4.0/750 1S HM Original Operating Instructions

MAHA MPJ 4.0/750 1S HM Original Operating Instructions

Pit jacks
Hide thumbs Also See for MPJ 4.0/750 1S HM:

Advertisement

Quick Links

MPJ 4.0/750 1S HM
MPJ 4.0/750 1S HA
MPJ 16.5/750 1S HM
MPJ 16.5/750 1S HA
MPJ 16.5/750 1S FA
MPJ 16.5/750 1S TA
MPJ 16.5/750 1S HAE
MPJ 20/750 1S HM
MPJ 20/750 1S HA
MPJ 20/750 1S FA
MPJ 20/750 1S TA
Original Operating Instructions
Installation | Operation | Service
MPJ 16.5/1200 2S FA
MPJ 16.5/1200 2S TA
MPJ 16.5/1200 2S HA
MPJ 16.5/1200 3S FA
MPJ 16.5/1200 3S TA
MPJ
Pit Jacks
BA550001-en

Advertisement

loading
Need help?

Need help?

Do you have a question about the MPJ 4.0/750 1S HM and is the answer not in the manual?

Questions and answers

Summary of Contents for MAHA MPJ 4.0/750 1S HM

  • Page 1 Pit Jacks Original Operating Instructions BA550001-en Installation | Operation | Service MPJ 4.0/750 1S HM MPJ 16.5/1200 2S FA MPJ 4.0/750 1S HA MPJ 16.5/1200 2S TA MPJ 16.5/1200 2S HA MPJ 16.5/750 1S HM MPJ 16.5/750 1S HA MPJ 16.5/1200 3S FA MPJ 16.5/750 1S FA...
  • Page 2 MAHA's claim is to also be a leader in the areas of reliability, safety and sustainability – this can be seen in many details that have been developed with these aspects in mind.
  • Page 3 Contents General Safety Instructions ..........................7 Symbols and Signal Words ......................... 7 1.1.1 Personal Injury ............................7 1.1.2 Property Damage ..........................7 Basic General Safety Instructions ......................7 Safety Instructions for Handling Hydraulic Fluid ..................8 What to Do in the Event of Defects or Malfunctions ................. 8 What to Do in the Event of an Accident ......................
  • Page 4 Optional Load Handling Attachments ...................... 34 Maintenance Unit ............................34 Bleeding Special Accessories ........................36 Foot pump ..............................36 Operation ................................ 37 10.1 Controls ..............................37 10.1.1 MPJ 1S ..............................37 10.1.2 MPJ 2S | MPJ 3S ..........................38 10.1.3 MPJ HAE .............................. 40 10.2 General Safety Instructions for Safe Operation ..................
  • Page 5 13.1 Safety Instructions ............................. 57 13.2 Washing / Cleaning / Oiling ........................57 13.3 Idle Stroke ..............................57 13.4 Maintenance Unit ............................57 Lubricating ..............................58 13.5 Changing Hydraulic Oil ..........................58 13.5.1 MPJ 1S ..............................58 13.5.2 MPJ 2S | MPJ 3S ..........................62 13.5.3 MPJ HAE ..............................
  • Page 6 [Blank page] BA550001-en...
  • Page 7 General Safety Instructions Symbols and Signal Words 1.1.1 Personal Injury DANGER indicates an immediate hazard which, if not avoided, will result in death or severe personal injury. WARNING indicates a potential hazard which, if not avoided, could result in death or severe personal injury.
  • Page 8 If irregularities occur, fully lower or support the lift immediately. • Turn off the main switch and secure it against unauthorised use. • Notify the MAHA Service Center at +49 8374 585-100 or via your contact partner. What to Do in the Event of an Accident •...
  • Page 9 • show knowledge and experience in handling the equipment and the dangers posed, • have had certified training regarding safety regulations. Requirements on Service Personnel Persons who are entrusted with the installation, maintenance and/or dismantling of the equipment must in addition: •...
  • Page 10 The jacks are not suitable for supporting lifted loads. Lifting more than one axle at a time is prohibited. Stepping on the load handling attachment is prohibited. Riding on the load handling attachment is prohibited. Use for other lifting operations is prohibited. Lifting with additional lifting gear is prohibited.
  • Page 11 pump has the ability to achieve higher hydraulic pressures and thus to lift heavier loads. In pneumatic-hydraulic jacks, the compressed air drives an air motor, which is firmly bolted to the hydraulic block. This oscillating pressure intensifier conveys the hydraulic oil. In rapid mode, the hydraulic oil in the tank is pressurised with compressed air, which displaces the hydraulic oil from the tank and allows the lifting piston to reach the load application point more quickly.
  • Page 12 Safety Features Relief Valve A pressure relief valve is installed between the pump and the check valve. This DBV limits the hydraulic pressure that can be generated by the pump, preventing excessive loads from being lifted. The DBV is adjusted to the load and set at the factory. The setting of the DBV must not be changed.
  • Page 13 Technical Data Relevant Pit Dimensions Outer width of upper pit profile Pit width Clear width of upper pit profile Pit depth Depth of pit protrusion left Depth of pit protrusion right Width of pit protrusion left Width of pit protrusion right Outer width of lower pit profile Clear width of lower pit profile BA550001-en...
  • Page 14 Nomenclature Type of drive 1200 16.5 Load capacity in t Chassis design Travel in mm Number of telescopic stages Number of telescopic stages xS Number of telescopic stages Chassis design Suspended design “Floor” = Floor-running, freely movable design “Track” = Floor-running, rail-guided design Type of drive M Manual operation with hand pump Automatic operation with rapid control and air motor...
  • Page 15 Pit Jack Data Load capacity [kg] 4000 16 500 20 000 16 500 Mounting inner diameter (trunnion) [mm] Outside diameter (piston rod) [mm] Dead weight lifter [kg] Max. Dead weight with chassis [kg] Drive 8...max. 10 bar at 350 L/min Drive 2.5 kW, 3 x 400 V, 50 Hz, Operating pressure [bar] 1200...
  • Page 16 6.4.1 Suspended Chassis Suspended chassis run on steel profiles at the edge of the pit and bear the code letter “H” (cf. Nomenclature). See Annex for detailed dimensions. Overview For pit jacks up to and including 16.5 t Track width ±70 mm adjustable Cylindrical or conical rollers For pit jacks up to and including 16.5 t Track width ±70 mm adjustable...
  • Page 17 6.4.2 Rail-Guided Chassis Rail-guided chassis run on steel profiles on the pit floor and bear the identifica- tion letter “T” (cf. Nomenclature). See Annex for dimensions. Overview For pit jacks up to and including 16.5 t Adjustable track width Cylindrical or conical rollers Internal or external rollers (see below) Internal chassis roller Cylindrical shape...
  • Page 18 External chassis roller Cylindrical shape Without wheel flange, only with roller for guidance on the pit wall Suitable for flat steel from a width of 55 mm 6.4.3 Freely Movable Chassis Freely movable carriages run on the pit floor or outside the working pit and bear the code letter “F”...
  • Page 19 Stroke Telescopic stages Chassis Drive Model capacity travel MPJ for cars and vans MPJ 4.0/750 1S HM 4,0 t 750 mm MPJ 4.0/750 1S HA MPJ for trucks and buses MPJ 16.5/750 1S FA MPJ 16.5/750 1S TA 750 mm MPJ 16.5/750 1S HM...
  • Page 20 Danger Zone The danger zone is defined as the pit jack incl. test vehicle plus the safety distances specified in the following table. 1000 mm Lifting height Pit jack (750/1200 mm) 2000 mm 2000 mm 1000 mm Lifting height Pit jack (750/1200 mm) 2000 mm 2000 mm Spatial limits...
  • Page 21 Transport, Handling and Storage Safety Instructions WARNING • Wear personal protective equipment. • Standing under a suspended load is prohibited. • The transport and storage of packages is only permitted using original transport racks. Observe the max. stacking height. • Before removing the packaging straps, secure the packages against falling and maintain a safe distance.
  • Page 22 Packaging Information The delivery is always made on europallet (800 mm x 1200 mm). Max. Dimensions of the package (L x W x H): 1593 x 1026 x 1145 mm Max. Weight of the package: 572 kg The center of gravity of the packages is located within the footprint of the Europallet.
  • Page 23 Installation Air jacks may only be operated with dry, lubricated compressed air according to ISO 8573-1:2010 [1:4:2]. In order to be able to guarantee the required compressed air quality, which is necessary for reliable operation of the lifter, a maintenance unit must be installed in the supply line in the immediate vicinity of the lifter (line length max.
  • Page 24 NOTICE The chassis is matched to the pit specified in the order. Use in other pits is only permitted after consultation with MAHA. For occupational safety reasons, the jack must be disconnected from the chassis during the installation process. To do this, remove all four hex head screws (A).
  • Page 25 sections are extended to the same distance (see dimension “X”). Secure pull-outs with hex head screws (B) using a tightening torque of 50 ±5 Nm. Lower the pit jack into the pit using suitable lifting gear. Mount the pit jack on the chassis in the reverse order to disassembly. Tighten the four hex head screws (A) to fix the pit jack with a tightening torque of 85 ±5 Nm.
  • Page 26 Installation of Pit Jack in Suspended Chassis 8.3.1 Adjustable Chassis up to 16.5 t Required aids and tools • Lifting gear (overhead crane, forklift, etc.) • Torque wrench up to and including 85 Nm • 2 round slings • Socket wrench with socket A/F 19 •...
  • Page 27 From this step onwards, at least a second person, and if necessary other persons, must be called in to assist with the installation work. Slide the chassis supports sideways onto the lifting rollers (Attention: Danger of tipping!) and secure with lashing straps. Make sure that the lashing straps are positioned as close as possible to the lift.
  • Page 28 Attach a round sling diagonally to two jack rollers. Then lift the jack inclu- ding chassis using lifting gear and lower it into the centre of the pit. The side panels must be inserted for this. Align the lift in the L-profile or in the U-profile depending on the installation situation.
  • Page 29 ≤ 10 mm BA550001-en...
  • Page 30 8.3.2 Customised Chassis 20 t The chassis for load capacities of 20 t are welded to size, i.e. no side sections can be moved or beams removed. Observe the installation procedure described in section “Installation of Pit Jack in Suspended Chassis”. The same aids and tools are required.
  • Page 31 of Pit Jack in Suspended Chassis”. As the made-to-measure chassis do not have handle openings, we recommend wrapping the side section. Note the central alignment of the lift and the counter-rotation of two lashing straps to prevent the lift from slipping. Attention: Crushing hazard After securing the jack in the chassis, it can be inserted into the pit (use the existing pit opening).
  • Page 32 Lower the pit jack into the pit in an upright position using a suitable lifting gear. Mount the jacks on the chassis in the reverse order to that for disassembly. Tighten the four hex head screws (A) to fix the pit jack with a tightening torque of 85 ±5 Nm.
  • Page 33 Floor-Running Chassis Pit jack or gear jack are ready mounted in the chassis. Remove the packaging and attach two round slings to the head plate of jack incl. chassis (see Fig.). Lift the jack from the euro pallet and move it to its destination (pit/floor). BA550001-en...
  • Page 34 Set down the load safely, without slipping and centered on the center of gravity. Maintenance Unit MAHA offers a maintenance unit for its air-powered pit jacks that provides additional support for air quality requirements. This maintenance unit can be ordered together with the lifter, but can also be retrofitted.
  • Page 35 BA550001-en...
  • Page 36 Bleeding Special Accessories See section “Bleeding”. Foot pump The manually operated foot pump enables precise positioning of the load handling attachment under the vehicle or transmission. This option is available to the telescopic lifters. Retrofitting of this option is possible at any time. BA550001-en...
  • Page 37 Operation 10.1 Controls 10.1.1 MPJ 1S The MPJ 1S jack series is equipped with either a manual pump or a pneumatic- hydraulic pump. Both variants allow 2 lifting speeds. The rapid traverse is very suitable for moving the load-handling attachment unloaded to the vicinity of the lifting point. The manual pump has two pumping pistons for this purpose.
  • Page 38 10.1.2 MPJ 2S | MPJ 3S Standard scope of delivery Drain spindle Maintenance unit Oil filler plug Load stroke control (foot operated) Rapid control (foot operated) Oil sight glass Option Foot pump Rapid control (manually operated) Load stroke control (manually operated) Foot pedal Handheld remote control with magnetic holder Quick coupling...
  • Page 39 BA550001-en...
  • Page 40 10.1.3 MPJ HAE The electro-hydraulic jack is equipped with a 5 m cable for power supply. To operate the jack, an appropriate shock-proof socket is required within reach of this cable. Main switch „Lift" button „Lower" button Potentiometer Sheet metal cover Oil tank BA550001-en...
  • Page 41 10.2 General Safety Instructions for Safe Operation WARNING Pit jacks and gear jacks are not suitable for supporting the load over a long period of time. Work under a lifted load may only be carried out using suitable supports. Safety devices must not be by-passed or rendered unusable in any other way. Riding with the load or on the load-handling attachment is prohibited Climbing up the lifted vehicle is prohibited.
  • Page 42 (e.g. by lashing straps). As standard, the jacks are supplied with a simple support. For loads that cannot be lifted safely with this, MAHA can supply suitable load handling attachments. When using these, the corresponding operating instructions of the accessories must be observed.
  • Page 43 Ensure that the connection cable is plugged in. Switch on the main switch to make the jack ready for operation. The jack is immediately ready for use. 10.5 Raising WARNING The permissible load must not be exceeded. Load and jack must be observed by the operator during the entire lifting and lowering process.
  • Page 44 The hydraulic-pneumatically operated jack is lifted by pressing the correspon- ding button for load or rapid stroke. The pushbuttons are provided with auto- matic reset. When the buttons are released, the stroke movement stops automatically. An attached claw serves as a load-handling attachment. For special load application points on vehicles, other suitable mounts from our range of accessories can be fitted (support plate, transmission plate, axle traverse).
  • Page 45 Press button (B) to lift. The respective button is only active as long as it is held down (dead man's switch). When a run command is triggered, the cylinder runs at a constant speed. A rapid control does not exist for this jack. 10.6 Supporting WARNING...
  • Page 46 The lowering process is initiated by pressing the corresponding pushbutton. During the lowering process, the lowering speed can be changed via a rotary potentiometer. MAHA strongly recommends that the following procedure be followed when lowering to avoid damage to property and personal injury: Set rotary switch to “0”.
  • Page 47 WARNUNG Before removing the vehicle, the jacks must be in the lower home position to prevent damage to the jacks and vehicle. Drive out the vehicle only at walking speed and only if there are no persons in the pit or on the driveway. ATTENTION: Be careful when running vehicle engines.
  • Page 48 Troubleshooting WARNING • The relevant health and safety regulations must be observed. • Wear personal protective equipment. • Service work may only be carried out by authorised service technicians. • Repair, maintenance and setup work may only be carried out when the jack is at a standstill.
  • Page 49 Trouble Possible cause Remedy Air motor initially runs at Air motor runs dry; no oil in the Refill oil idle stroke (typical noise), maintenance unit but becomes increasingly Air pressure too low; local slower under load and Contact service cause then stops completely Air motor first lifts the Too low oil level on the jack due...
  • Page 50 Trouble Possible cause Remedy Piston rods extend slowly Too low oil level on the jack due at first without load and to transport damage or natural Refill oil suddenly become faster consumption Too low oil level on the jack due to transport damage or natural Refill oil Piston rods “chatter”;...
  • Page 51 11.2 Electro-Hydraulic Pit Jacks Trouble Possible cause Remedy Check mains connection Jack does not respond No power Check fuses in the control box Check pump for running Pump / motor defective noises Piston rod does not Check connections in the extend control box (pushbutton) Control defective...
  • Page 52 Trouble Possible cause Remedy Seal defective, oil Customer service leakage at guide bushing Too little oil Refill oil (HLP-D-22) Piston rod does not extend completely Air in system See above BA550001-en...
  • Page 53 Periodic and Recurring Inspections WARNING All inspections must be carried out in unloaded condition. Irrespective of the periodic inspections, subsequent inspections must be carried out by the operator and user at the specified intervals. Of course, the operator can entrust external experts with these inspections during the year. The same applies to the rectification of any defects identified.
  • Page 54 12.2 Weekly 12.2.1 Piston Rod The piston rod must be extended empty once a week (see also “Maintenance”) to bleed the jack. In this course, the piston rod must be inspected for damage. Damaged piston rods lead to leakage at seals. Damage to the piston rod allows cleaning agents and salt water to penetrate unhindered.
  • Page 55 12.3.2 Rollers Needle bearing Needle bearing Chassis roller Circlip Lubricating nipple, funnel inside and outside Track rollers must receive special attention, as they must support the entire load on the one hand and ensure easy movement of the jack and the chassis on the other.
  • Page 56 If necessary, the brake must be readjusted as described in section “Adjusting the Pit Jack brake”. 12.3.5 Prefilter Pneumatically operated pit jacks have a prefilter at the compressed air inlet, which is necessary to protect the control system. To check, disassemble the compressed air coupling and the internal Allen threaded pin behind it.
  • Page 57 Servicing Regular maintenance ensures the function and operational safety of the lift and contributes to its value retention. In order to ensure the safe operation and function of the lift, maintenance must be carried out at the latest after the intervals of the maintenance plan to the extent described.
  • Page 58 Information on the oil specification and quantity can be found in the Annex. To ensure function and reliability, the use of alternative hydraulic oil must be verified by MAHA. The oil filler plug is located on the top plate, see Fig.
  • Page 59 Draining hydraulic oil • Provide an oil-tight container. • Remove screw plugs and sealing rings (see following Fig.), and drain hy- draulic oil into oil-tight container. • Close the screw plugs using new sealing rings. BA550001-en...
  • Page 60 Filling hydraulic oil Fill in the required quantity of hydraulic oil via the oil filler plug (see Fig.). Close the oil filler plug with a new sealing ring. Bleeding the hydraulic system The oil level must be checked and hydraulic oil topped up if necessary. The tar- get level of the hydraulic oil is between the two notches of the dipstick when retracted.
  • Page 61 Venting by means of hand pumps Pump up the jack using the rapid stroke (C) until the jack has moved approx. 100…200 mm. Immediately afterwards, pump up the load stroke (B) and also perform the stroke movement for approx. 100…200 mm without pausing. Now actuate the rapid stroke (C) pump again and move the jack to the mechanical stop.
  • Page 62 NOTICE Information on the oil specification and quantity can be found in the Annex. To ensure function and reliability, the use of alternative hydraulic oil must be verified by MAHA. Tools required • Collection container for waste oil 40 L •...
  • Page 63 BA550001-en...
  • Page 64 Filling hydraulic oil Step 1: Remove screw plug M14x1.5 (B). Fill in the following partial quantities (for oil quantities see also Annex): 2S ..11.5 L 3S ..18.5 L Close the oil filler opening with the screw plug. Step 2: Place a cloth around the piston rods below the bleeder screw.
  • Page 65 CAUTION Under no circumstances should the rapid stroke be actuated, as this would cause air to enter the hydraulic lifting system. 10 For pit jack 2S, 4.2 liters and for pit jack 3S, 12 liters must be discharged while actuating the load stroke. 11 As soon as the specified quantity has been removed, the bleeder valve is closed first and the operation of the load stroke is terminated immediately afterwards.
  • Page 66 Bleeding the hydraulic system WARNING • Use personal protective equipment! • Pit jack is unloaded, freely accessible and cleaned! • The pit jack is fully retracted and load-free! • The pit jack must be disconnected from the compressed air supply. Bleeder block Check the oil level and top up with hydraulic oil if necessary.
  • Page 67 Check the condition of the hydraulic oil via the oil sight glass and replace if necessary (see section “Changing the hydraulic oil”). Place a cloth around the piston rods below the G1/8" screw plug. The screw plug including the USIT sealing ring can then be removed (A). Immediately afterwards, screw in the bleeder valve (B) and tighten it hand-tight.
  • Page 68 To ensure function and reliability, the use of alternative hydraulic oil must be verified by MAHA. Draining hydraulic oil • The pit jack must be disconnected from the power supply. • Provide a 20 L collection container for waste oil.
  • Page 69 Filling hydraulic oil Remove the sheet metal cover (B) and open the oil filler cap underneath. Fill the first part of 10 liters of hydraulic oil and move the jack to 2/3 of the lifting height. Then fill in another 5 liters of hydraulic oil. Close the oil cover and install the sheet metal cover.
  • Page 70 13.6 Setting the Pit Jack Brake Pit jack brake Shim Pit jack roller The brake is used to fix the pit jack in the chassis. The brake lever moves an eccentric. This in turn presses on the back of one of the four rollers.
  • Page 71 Repairs WARNING Service and repair work on the lift may only be carried out by authorised and trained specialist personnel! The lifting system and its components were extensively tested during development and before marketing. Original spare parts correspond in quality and condition to those of a new lifting system.
  • Page 72 Disconnect the pit jack from the compressed air supply. Open the drain spindle slightly until the piston rod can be turned by hand (the piston rod may drop slightly). Disconnect the pneumatic control line from the valve (valve is located behind the drain spindle and the air motor).
  • Page 73 Place an oil-tight container under the hose. Remove the scraper using a slotted screwdriver. Scraper is destroyed in the process. Push the scraper upwards. 10 The retaining ring can then be removed with pliers. BA550001-en...
  • Page 74 11 Remove the pneumatic control line on the pit jack, which is located directly below the head plate. 12 Connect the jack to the compressed air supply and actuate the load stroke. WARNING Danger due to incorrect operation! 13 Extend the piston rod using the load stroke, as shown in the following Fig. Hold the piston rod firmly.
  • Page 75 14 The seal kit must be replaced as originally installed. The structure of the sealing package with full equipment is shown here as an example. Scraper NDA.07009510 Piston rod O-ring NDO.08603 Guide bushing O-ring NDO.07003 Spacer bushing O-ring NDO.03003 Piston Slotted rings NDN.08009010 Hex nut A/F 46 BA550001-en...
  • Page 76 15 To replace the seal kit, the hex nut A/F 46 must be removed (remove or install using an impact wrench). The piston, the spacer bushing and the guide bushing can then be removed. Make sure that the components are dismantled downwards.
  • Page 77 22 The piston rod with the hydraulic components can then be carefully reinser- ted into the pit jack. Make sure that the piston rod is inserted vertically into the jack. 23 As soon as the seals in the cylinder tube are tight, the drain spindle of the pit jack must be actuated so that the piston rod in the pit jack can be lowered.
  • Page 78 14.2 Replacing the Seal Kit MPJ 2S | 3S 14.2.1 Tools Required Special tools (see table) are required for disassembly of the MPJ 2S and MPJ 3S pit jack. Mounting wrench for guide bushing level 3 Material number: 1283817 Mounting wrench for guide bushing stage 2 Material number: 1283278 Mounting wrench for guide bushing stage 1 Material number: 1283279...
  • Page 79 Mounting aid: Sleeve 2 for telescopic pit jack Material number: 1413768 Mounting aid: Calibration sleeve for telescopic pit jack Material number: 1413769 • Hexagon wrench A/F 3, A/F 5, A/F 6, A/F 8 • Open-end wrench A/F 17, A/F 27, A/F 46 •...
  • Page 80 14.2.2 Overview of Components for Seal Kit Telescopic stage Description Dimensions Scraper 80x88x7 Rod seal 80x90x11 Stage 1 for 2S/3S Guide band 80x85x25 O-ring Ø100x2 Scraper 115x127x10 Rod seal 115x125x13 Guide band 115x120x25 Stage 2 for 2S/3S O-ring Ø150x3 Guide band 140x135x25 Piston seal 140x119x8,1...
  • Page 81 Using a lifting device, pull the piston rod upwards at the eyebolt with a slight pull (approx. 20 mm). Lifting the jack off the ground should be avoided. Then remove the upper screw plug. Pull the piston rod upwards a further 200 mm. The guide bush can then be unscrewed using the installation wrench.
  • Page 82 push it onto the piston rod from below. Then refit the piston including the four cylinder screws (minimum installation torque 108 Nm) and M30x1.5 nut using an impact wrench. Work steps Stage 2 Fit the installation wrench and screw in the threaded mandrel. Using a lifting device, pull the cylinder tube upwards at the eyebolt with a slight pull (approx.
  • Page 83 The guide bush can be pulled off upwards after the threaded mandrel has been removed. To remove the piston, first remove the threaded pin. The piston can then be unscrewed. If this does not come loose, there are two M8 threads in the piston crown for attaching a dismantling aid.
  • Page 84 NOTICE In the illustration on the right, a non-return valve can be seen inside the piston, see large arrow. Check for damage and contamination. Generously coat the area inside the guide bush with hydraulic oil and push the guide bush onto the cylinder rod from below. Then tighten the piston hand-tight and secure with a threaded pin.
  • Page 85 Work steps Stage 3 Fit the installation wrench and screw in the threaded mandrel. Using a lifting device, pull the cylinder tube upwards at the eyebolt with a slight pull (approx. 200 mm). Lifting the jack off the ground should be avoided.
  • Page 86 Fit a new set of seals to the cleaned guide bush and piston. To keep the O- ring in position, we recommend applying multi-purpose grease to the groove for the O-ring. NOTICE In the illustration on the right, a non-return valve can be seen inside the piston, see large arrow.
  • Page 87 Work step 4: Inserting stages 1 to 3 Before inserting the stages, ensure that the interior is clean and that the cylinder tube is thinly coated with hydraulic oil. Never insert the sections into the pit jack by hand. Always use suitable lifting gear! When inserting in the groove ring area (on the piston), ensure that the groove rings do not come into contact with the thread of the cylinder tube.
  • Page 88 Tighten the guide bush hand-tight using the installation wrench and then fix it in place with a light tap (rubber hammer) on the installation wrench. Lower the stage completely and remove the installation wrench and threaded mandrel. Insert the remaining stages into the pit jack as described above. Install the screw plugs on the largest and smallest guide bush.
  • Page 89 14.3 Replacing the Hydraulic Unit 14.3.1 Replacing the Hydraulic Unit MPJ 1S When replacing the hydraulic unit, the hydraulic oil must also be changed at the same time. Carry out section “Changing the hydraulic oil MPJ 1S”. The hydraulic oil must be drained for further steps. Remove the four screws from the block (hex head screw A/F 13 / cylinder head screw A/F 6).
  • Page 90 14.3.2 Replacing the Hydraulic Unit MPJ 2S | 3S When replacing the hydraulic unit, the hydraulic oil must also be changed at the same time. Carry out section “Changing the hydraulic oil MPJ 2S | 3S”. The hydraulic oil must be drained for further steps. Remove the cover (if necessary, mark the air hoses to avoid confusion).
  • Page 91 Annex 15.1 Tightening Torques Tightening torques for all screws without torque specification: Thread Strength class Tightening torque 6 Nm 10 Nm 25 Nm 50 Nm 85 Nm 15.2 Load Application of the Chassis Pit jack model F.L1 [kN] F.L2 [kN] F.R1 [kN] F.R2 [kN] Load application *MPJ 4.0/750 1S H...
  • Page 92 MPJ 16.5/750 1S T 15.83 116.54 28.73 Chassis roller MPJ 20.0/750 1S T 16.38 10.39 118.98 75.45 Chassis roller *Worst Case assumption: FGH 14.P-120 without offset; extensions approx. 14 mm extended to a total width of B dimension = 1083 mm. Maximum asymmetrical force transmission via rollers into the foundation.
  • Page 93 15.4 Dimensions of Adjustable Chassis B min…B max [mm] Outer dimension (pushed together) [mm] 580…720 640…780 700…840 760…900 820…960 880…1020 940…1080 1020 1000…1140 1080 1060…1200 1140 BA550001-en...
  • Page 94 15.5 Overview of Chassis Rollers [mm] [mm] [mm] [mm] Chassis roller 1267244 Standard 6-30T Chassis roller 1267245 — Rd 95x50 I-profile with Chassis roller 1267253 6-30T inclination Difference Chassis roller dimension B 1128378 — 44,5 Rd 95x48 > 10 mm; w/o collar Chassis roller 1267257...
  • Page 95 [mm] [mm] [mm] [mm] Chassis 1267255 roller Collar 20 mm 6-30T Chassis 1267254 roller Collar 15 mm 6-30T Roller for 1267252 N02.31-13 U80 profiles I-profile with Chassis 1267249 roller inclination Chassis roller 1267248 — Tread 35 mm Rd 95x45 Chassis Tread 69 mm roller 1267246...
  • Page 96 15.6 Electric Circuit Diagram MPJ HAE 15.7 Hydraulic Circuit Diagrams 15.8 Operating Instructions for Maintenance Unit 15.9 Declaration of Conformity See following page(s). BA550001-en...
  • Page 108 Postfach 6040 Quelltext: deutsch D-73726 Esslingen Version: 9712c Telefon (0711)347-0 Teile-Nr.: 380645 Bedienungsanleitung Operating Instructions Bruksanvisning Proportionalöler Proportional lubricator Proportionell smörjanordning Typ LOE-...-D-... Type LOE-...-D-... Typ LOE-...-D-... Einbau und Inbetriebnahme nur von autorisiertem Fachpersonal, gemäß Fitting and commissioning to be carried out by qualified personnel only in accordance Montering och idrifttagning får endast utföras av auktoriserad fackkunnig personal i Bedienungsanleitung.
  • Page 109 Product Design LFR(S)-/LR(S)-/LF(M.../X)-...-D Filter regulator, Pressure regulator, Filter 1 Rotary knob 2 Plug screw 3 Pressure gauge 4 Drain screw Festo SE & Co. KG 5 Filter bowl Ruiter Straße 82 73734 Esslingen 6 Housing Germany +49 711 347-0 www.festo.com Instructions | Operating 8121613 2019-11k...
  • Page 110 2. Screw in threaded bolt FRB-D 9. Tightening torque: 2.5 – 0.5 Nm 2. Unscrew the filter bowl 5. 3. Disassemble the old filter cartridge: – LFR(S)/LF: unscrew the filter plate and remove the filter cartridge. – LFM.../LFX: unscrew the filter cartridge. 4.
  • Page 111 Ralf Kerkmeier, MAHA Maschinenbau Haldenwang GmbH & Co. KG, Hoyen 20, 87490 Haldenwang, Germany Haldenwang, 2024-03-01 Dr. Peter Geigle Geschäftsführer | Managing Director MAHA Maschinenbau Haldenwang GmbH & Co. KG · Hoyen 20 · 87490 Haldenwang · Germany ☎ +49 8374 585-0 ·  maha@maha.de ·  www.maha.de...
  • Page 112 PL670000_002-de...