GEYA 100A Series Manual

GEYA 100A Series Manual

Uninterruptible millisecond switching dual automatic transfer switch

Advertisement

Quick Links

The product data referred to in the company shall be subject to material object.
Subject to change without notice. The company has the final right to interpret.
This album is printed with eco paper. Cherish resources, treat the environment.
ADD:Wenzhou Brige Industrial Zone,Beibaixiang Town,Yueqing,Zhejiang,China 325603
Tel:0086-577-62771036
Tel:0086-13567770207
E-mail:sale@cngeya.com
Web:www.geya.com
UNINTERRUPTIBLE MILLISECOND
SWITCHING DUAL AUTOMATIC
TRANSFER SWITCH
ZHEJIANG GEYA ELECTRICAL CO.,LTD
Please read the instructions carefully, when product acceptance
and installation, and retain it for future reference.
GEYAElectrical
SafetyFirst
ZHEJIANGGEYAELECTRICALCO.,LTD

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the 100A Series and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for GEYA 100A Series

  • Page 1 This album is printed with eco paper. Cherish resources, treat the environment. ZHEJIANGGEYAELECTRICALCO.,LTD UNINTERRUPTIBLE MILLISECOND SWITCHING DUAL AUTOMATIC TRANSFER SWITCH ZHEJIANG GEYA ELECTRICAL CO.,LTD Please read the instructions carefully, when product acceptance and installation, and retain it for future reference. ADD:Wenzhou Brige Industrial Zone,Beibaixiang Town,Yueqing,Zhejiang,China 325603 GEYAElectrical Tel:0086-577-62771036...
  • Page 2: Table Of Contents

    CONTENTS Everything for electrical safety PREFACE Dear user: Thank you for using our products , we believe this product will your work and life benefits and convenience , welcome your valuable suggestions and comments in the use course, we will continue to provide you with enthusiastic and attentive service. Or if you have any questions , please contact the manufacturer directly with our vendors.
  • Page 3: General

    Operation conversion time <50ms 2.6 Installation conditions Return conversion time <50ms ATS can be installed vertically in control cabinet or distribution cabinet. Make sure the installation distance meets the reguirements in Fiqure1. Power off time <50ms GEYA ELECTRICAL GEYA ELECTRICAL...
  • Page 4: 100 Type Wiring Diagram

    Common incoming line control line Common zero Common line input control line Standby power indicator Standby incoming line Standby control line Standby zero Standby incoming line line input Standby power indicator Load output Standby control line GEYA ELECTRICAL GEYA ELECTRICAL...
  • Page 5: Overall And Installation Dimension Of 100

    Standby power supply B Standby incoming line Connection to electrical equipment Standby control line 6. Overall and installation dimension of 100 Fig.8 Timing switching connection mode Fig.6 Standby incoming line (Auto/manual) circuit terminal Standby control line GEYA ELECTRICAL GEYA ELECTRICAL...
  • Page 6: Installation And Wiring

    8.2 In order to ensure the good performance of ATS , the first maintenance and inspection shall be carried out within 6 months after use , and shall be maintained and inspected at least once a year. In harsh installation conditions , the frequency of maintenance and inspection should be increased. GEYA ELECTRICAL GEYA ELECTRICAL...

Table of Contents