BELL SYSTEM PRACTICES
Plant Series
SECTION 502-300-300
Issue
1,
Sep
te
mber
,
1957
AT&TCo
Standard
HAND TELEPHONE
SETS
- 200 SERIES
MAINTENANCE
1.00
INTRODUCTION
.
This
section covers the requirements
and ad-
justing procedures for the maintenance
of types A, B,
C, D, E,
and
G
handset mountings of the 200 series
hand telephone
sets.
2.00
GENERAL
2.01
Prior to
proceeding with routine maintenance,
inspect
th
e
exterior
and interior of the hand
telephone
set for
loose,
displaced, or broken parts and
determine
if any
such
defects are responsible for
the
trouble
condition.
2.02
R
eplace set if
replacement
parts are not avail-
able.
3.00
CONTACTS
ALIGNMENT
3.01
Point
and disc contacts shall line up so that
the point
fa
lls
wholly within
the circumference
of the opposing contact
disc
( see
Fi
g.
1 )
.
3 .02
Crossbar
contacts sha
ll lin
e
up so
the width of
one falls
wholly within
the
contact surface of
the other (
see
Fig.
1
) .
I/
PO
I
N T
/OISC
I
•~
'
ftJ
I
I
Ji
FIG
.
I-P
OINT
AND
DISC AND
CROSSBAR
CONTACTS
MARGINS
3.03
When
the plunger is slowly re leased on types
A, B, D,
and
E
mountings, no
contacts
shall
make or
break
until the
plunger
has raised at
least
1/
16
inch (see
Fig.
2A).
3.04
On
G-type mountings, the operating stud shall
not touch
the operating
springs
when
the
switchhook
is in its extreme
upward
position
( see
Fig.
2B).
,
..
i6
FIG.
2A-
TYPES
A, B,
D,
AND
E
MOUNTING
MARGIN
FI
G.
2B-G-TYPE
MOUNTING
MARGIN
Copyrirht,
1957,
by
American Telephone and
Tele gra
ph
Company
Printed
in
U. S.
A.
Page
1
Need help?
Do you have a question about the Bell System 200 Series and is the answer not in the manual?
Questions and answers