Download Print this page

FVC UN1112B Installation Manual

Rear door platform gear box

Advertisement

Quick Links

RE AR DO O R PL AT FORM GE AR B OX
UN1 11 2B
INSTALLATION
GUIDE
F L AT L I N E VA N C O • S U P P O R T @ F L AT L I N EVA N C O . C O M • 8 8 8 - 6 6 7- 5 5 7 6
TOOLS REQUIRED
(NOT INCLUDED)
+
9/16" SOCKET
+
RATCHET
+
5MM ALLEN WRENCH
+
MEASURING TAPE
+
9/16" WRENCH
+
MARKER
INSTALL INFO
TIME TO INSTALL THIS PRODUCT: 30-45 MINUTES
Additional help is suggested for a few of the install steps.
Compatible with all FVC Rear Door Platforms.
BEFORE YOU START
Please inspect the product and packaging upon
delivery to ensure there are no issues and that
all parts and hardware are accounted for.
Contact us ASAP if anything is missing at:
support@flatlinevanco.com
0 1

Advertisement

loading
Need help?

Need help?

Do you have a question about the UN1112B and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for FVC UN1112B

  • Page 1 INSTALL INFO TIME TO INSTALL THIS PRODUCT: 30-45 MINUTES Additional help is suggested for a few of the install steps. Compatible with all FVC Rear Door Platforms. BEFORE YOU START Please inspect the product and packaging upon delivery to ensure there are no issues and that all parts and hardware are accounted for.
  • Page 2: Before You Start

    BEFORE YOU START All Flatline Van Co products must be properly assembled and secured before attaching to your vehicle. Improper attachment could result in an automobile accident, and could cause serious bodily injury or death to you or to others involved. You are responsible for assembling and securing Flatline Van Co products to your vehicle, checking the mounting points and attachments prior to use, and regularly inspecting the products for wear and or damage.
  • Page 3: Package Contents

    PACKAGE CONTENTS GEAR BOX QTY: 1 F L AT L I N E VA N C O • S U P P O R T @ F L AT L I N EVA N C O . C O M • 8 8 8 - 6 6 7- 5 5 7 6...
  • Page 4 HARDWARE 3/8-16 X 1 FLANGED 3/8-16 NYLON INSERT 3/8 SCREW FLAT WASHER HEX HEAD SCREW LOCKNUT QTY: 4 QTY: 4 QTY: 8 F L AT L I N E VA N C O • S U P P O R T @ F L AT L I N EVA N C O . C O M • 8 8 8 - 6 6 7- 5 5 7 6...
  • Page 5 Box for additional security, you’ll have to order some extra hardware. 1.2 If you are using a product other than the FVC Rear Door Platform, mark the back of the box to match your available mounting points and drill out (4) 3/8”...
  • Page 6 RATCHET TOOLS REQUIRED FOR THIS STEP: 9/16” SOCKET 9/16” WRENCH STEP | 02 BOX TO PLATFORM INSTALL 2.1 Open the lid of the box to access the mounting holes. 2.2 Insert (1ea) 3 ⁄ 8-16 x 1” Flanged Hex Head Screws and 3 ⁄...
  • Page 7 TOOLS REQUIRED FOR THIS STEP: 5MM ALLEN WRENCH STEP | 03 BOX ADJUSTMENTS [AS NEEDED] DOOR HINGES HINGE PIVOT BOLT 3.1 The adjustable torque hinges can be adjusted using a 5MM Allen Wrench. Tighten the Hinge Pivot Bolt to increase torque, loosen Hinge Pivot Bolt to decrease torque (FIG 5).
  • Page 8 FVC (and see) from you! Head to the products and following along and we will make it right. FVC is product page and click “Leave a company of van and outdoor with your adventures. Tag us Review.”...