Download Print this page

Advertisement

Quick Links

Sentry Buildings
Assembly Book
!e#ise& ()g)st ,-. ,/,0
the Virginia
-123,/2 4)i5&ing
Manufactured by RBS Holdings, LLC
205 Arlington Drive
Greenville, PA 16125
78is 9:n):5 is ;<=>rig8te&@ An&er t8e ;<=>rig8t 5:Bs. t8is 9:n):5
9:> n<t Ce ;<=ie&. in B8<5e <r in =:rt. Bit8<)t ;<nsent Dr<9
!4E F<5&ings. GGC
I C<=>rig8t ,/,,

Advertisement

loading
Need help?

Need help?

Do you have a question about the the Virginia and is the answer not in the manual?

Questions and answers

Summary of Contents for RBS Holdings the Virginia

  • Page 1 Assembly Book !e#ise& ()g)st ,-. ,/,0 the Virginia -123,/2 4)i5&ing Manufactured by RBS Holdings, LLC 205 Arlington Drive Greenville, PA 16125 78is 9:n):5 is ;<=>rig8te&@ An&er t8e ;<=>rig8t 5:Bs. t8is 9:n):5 9:> n<t Ce ;<=ie&. in B8<5e <r in =:rt. Bit8<)t ;<nsent Dr<9 !4E F<5&ings.
  • Page 2 MPORTANT NFORMATION BOUT C8e;R Bit8 ><)r 5<;:5 FX( <r C)i5&ing ;<&e <DDi;e D<r :n> reQ)ire9ents. Building Permits: restri;ti<ns <r =er9its ne;ess:r> D<r ;<nstr);ti<n@ 4> <Bner@ !eDer t< ne3t =:ge D<r D<)n&:ti<n s)ggesti<ns :n& siYe@ Foundation: X)r =:;R:ge in;5)&es =reZ;)t 9:teri:5s D<r t8e ,n& D5<<r r<<D g:C5es. r<<D What's Included: tr)sses :n&...
  • Page 3 Foundation Types & Measurements ImportantV b<) Bi55 nee& t< 8:#e : =r<=er D<)n&:ti<n inst:55e& t< s)==<rt t8e C)i5&ing@ De=en&ing <n t8e inten&e& )se &eter9ines B8:t t>=e <D D<)n&:ti<n is Cest@ Do Not 9:Re t8e D<)n&:ti<n 5:rger t8:n t8e C)i5&ing siYe@ [8en inst:55ing t8e C)i5&ing <n : ;<n;rete s5:C.
  • Page 4 Rough Opening Details for Windows and Doors (not included) If installing seperately purchased windows and doors follow the manufacturers instructions for correct rough opening size@ 78e Ce5<B e3:9=5es :re D<r reDeren;e <n5> :n& 9:> nee& t< Ce 9<&iDie& &e=en&ing <n st>5e :n& siYe <D ><)r Bin&<Bs :n& &<<rs@@ Fe:&ers :C<#e Bin&<Bs :n&...
  • Page 5 Step 1 Assemble (2) Two 92-1/2" Rear Wall Frames -@ C)t K,L tB< ,30ZT2 K<ne Bi55 Ce tre:te&L t< : 5engt8 <D f,Z-c,d@ M<siti<n t8e C<:r&s t<get8er :n& in&i;:te Bit8 2g2 9:rRs B8ere t8e B:55 st)&s Bi55 Ce 5<;:te&@ ,@ O:rR : 2C2 :n>B8ere CetBeen Dirst tB< st)& 9:rRs@ 78is is reDeren;e& in : 5:ter ste=@ 92-1/2 Top Wall Plate 92-1/2"...
  • Page 6 Step 2B Assemble (2) Two 8' Side Wall Frames continued If you are adding additional windows or doors, frame-in rough opening(s) per manufacturer's instructions. ,@ Jnst:55 K]L se#en =reZ;)t B:55 st)&s CetBeen t8e t<= :n& C<tt<9 =5:tes@ a:i5 t8e tre:te& C<tt<9 =5:te t<...
  • Page 7 Step 4 Assemble (2) Two 12' Side Wall Frames -@ 7ri9. if necessary. K,L tB< ,30Z-,2 C<:r&s K<ne Bi55 Ce tre:te&L t< : 5engt8 <D -00d@ M<siti<n t8e C<:r&s t<get8er :n& in&i;:te Bit8 2g2 9:rRs B8ere t8e B:55 st)&s Bi55 Ce 5<;:te&@ 144"...
  • Page 8 Step 5 Assemble 15'-5" Front wall Door Frame Instructions show a suggested location for a 24"x36" window. (&e)st st)& s=:;ing iD n< Bin&<B <r iD : &iDDerent siYe Bin&<B B:s =)r;8:se&@ ( B:5RZin &<<r ;:n :5s< Ce inst:55e& iD &esire&@ -@ C)t K,L tB<...
  • Page 9 Step 6 Set Wall Frames Front and back wall frames are positioned between long side walls. -@ Jnst:55 <ne <D t8e f,Z-c,d re:r B:55 Dr:9es :g:inst insi&e <D : T2 si&e B:55 Dr:9e@ IMPORTANT: Xrient en& 9:rRe& Bit8 : 2C2 t< ;<rner@ Ee;)re Dr:9es t<get8er :t t8e ;<rner )sing K0L D<)r -/& sinRers@ 4r:;e B:55s Bit8 =reZ;)t st)&s@ ,@ Jnst:55 t8e <t8er f,Z-c,d re:r B:55 Dr:9e t<...
  • Page 10 Step 7 Install 2x4 Tie Plates -@ Jnst:55 : -12 5<ng ,30 <n t8e C:;R B:55@ Ase -/& sinRers s=:;e -1d :=:rt t< se;)re tie =5:tes@ ,@ !e=e:t t< inst:55 : -12 5<ng ,30 tie =5:te <n t8e <==<site Dr<nt B:55@ 8' Long 2x4 Tie Plate 16' Long 2x4 Tie Plate Back Wall Frames...
  • Page 11 Step 8B Install Siding on Wall Frames continued -@ Jnst:55 : D)55 Bi&t8 si&ing =:ne5 <n t8e si&e B:55 Bit8 t8e 2G(M2 e&ge D5)s8 Bit8 t8e ,30s <n t8e C:;R B:55@ Jnst:55 K0L D<)r 9<re si&ing =:ne5s@ JD ne;ess:r> ;)t 5:st =:ne5 D5)s8 Bit8 ,30s <n Dr<nt B:55@ Ase T&...
  • Page 12 Step 9 thru 11 Steps not needed with this size and model. Step 12 Install Stairs IMPORTANT: Go now to the instructions in the stair kit book to install the stairs, floor joist and flooring.
  • Page 13 Step 13A Assemble Rear Gable Assemble the roof gables and trusses on the center of the loft floor. This will make it easier to stand the gable upright over the lower wall. -@ C)t K,L tB< ,30Z-/2 C<:r&s t< : 5engt8 <D f]Z-c,d@ M<siti<n t8ese ,30s. on edge :n& C)tt t<get8er@ ,@ M<siti<n K,L tB<...
  • Page 14 Step 13B Assemble Rear Gable continued -@ Ee;)re t8e ,31 C<:r&s t<get8er :t t8e Rnee :n& ri&ge Bit8 -c,d XE4 g)ssets@ Ase 1& ;<99<n n:i5s@ a:i5 \Z-c0d 3 -,d XE4 Di55ers B8ere s8<Bn Ce5<B@ 5/1/4" x 12" OSB Gusset 1/2" Gusset at Ridge 5-1/4"...
  • Page 15 Step 14 Install Siding on Rear Gable Frame -@ Et:n& )= t8e g:C5e Dr:9e :n& s5i&e it t< t8e re:r <D t8e C)i5&ing@ M<siti<n t8e Dr:9e Bit8 t8e C<tt<9 t<B:r&s t8e re:r B:55 s< it ;:n Ce ere;te& :Dter t8e si&ing is :==5ie&@ Jnst:55 : =reZ;)t si&ing =:ne5 Bit8 t8e 2;)t e&ge2 D5)s8 Bit8 t8e 5eDt si&e <D t8e g:C5e Dr:9e@ 78e si&ing s8<)5&...
  • Page 16 Step 16 Install Rear Roof Gable 2x4-12' Vertical Boards -@ Jnst:55 K,L tB< ,30Z-,2 C<:r&s <n t8e C:;R B:55 t< =re#ent t8e g:C5e Dr<9 D:55ing <DD &)ring g:C5e inst:55:ti<n@ Jnst:55 K,L tB< 9<re ,30Z-, C<:r&s t< Cr:;e t8e #erti;:5 ,30 in =5:;e@ 4eD<re Cr:;ing t8e #erti;:5 ,30s in =5:;e :tt:;8 K,L tB<...
  • Page 17 Step 17 Assemble & Install Front Gable Instructions show a suggested location for a 36"x36" window. P<55<B Ete=s -_ Z -0 t< C)i5& Bit8<)t : Bin&<B@ -@ !e=e:t Step 13 t< :sse9C5e Dr<nt g:C5e@ (5ter st)& Dr:9ing D<r Bin&<B <=ening@ G<;:te K_L t8ree 0]Z_c0d 5<ng ,30s@ C)t K-L <ne t<...
  • Page 18 Step 19 Install 2x6 Soffit Blocks -@ G<;:te =reZC)i5t ,31 s<DDit C5<;Rs. K0L P<)r Bi55 8:#e si&ing :tt:;8e&@ Et:rting Dr<9 C:;R B:55 =<siti<n : s<DDit C5<;R Bit8 :tt:;8e& si&ing )n&er C<tt<9 =5:te <D g:C5e :n& D5)s8 Bit8 D:;e <D g:C5e si&ing@ Ee;)re t< B:55 )sing K,L tB< _d &e;R s;reBs@ ,@ Jnst:55 s<DDit C5<;Rs &<Bn t8e 5engt8 <D t8e B:55 )n&er t8e ;enter <D e:;8 2gd <n tr)ss =5:te@ ^#er>...
  • Page 19 Step 20 Assemble Roof Trusses -@ G:> tr)ss =:rts insi&e t8e ,30 C5<;Rs )se& :r<)n& g:C5e Dr:9es@ Xne en& <D t8e T-Z_c0d 5<ng ,31 C<:r&s 8:#e : C5)e 9:rR@ M5:;e t8ese en&s t<get8er :t t8e ri&ge@ (&& : ,30 C5<;R :t t8e C<tt<9 <D t8e tr)ss 5egs t<...
  • Page 20 Step 21 Install Roof Trusses -@ Jnst:55 ,31 8:ngers <#er t8e 2g2 9:rRs <n t8e tr)ss =5:te :n& D5)s8 Bit8 <)tsi&e e&ge <D ,31@ Ase -Z-c,d e<ist 8:nger n:i5s@ Eet tr)ss 5egs int< 8:nger@ Ase -/& ;<:te& sinRer n:i5s t< se;)re t8e tr)ss t<...
  • Page 21 Step 23 Install Front Gable Soffit -@ Jnst:55 T-Z_c0d 5<ng ,30s <n t8e t<= <D t8e Dr<nt g:C5e. D5)s8 Bit8 t8e t<= <D t8e g:C5e Dr:9e@ Jnst:55 2x4x81-3/4" t8e en&s Bit8 t8e C5)e 9:rR t<get8er :t t8e =e:R <D t8e g:C5e@ Ase -/& sinRers s=:;e& -,d :=:rt@ ,@ Jnst:55 T,Z\cTd 5<ng ,30s <n t8e si&e <D t8e Dr<nt g:C5e.
  • Page 22 Step 24B Install Roof Sheathing continued Straight ,@ Et:rting :t g:C5e Rnee inst:55 r<<D s8e:t8ing :t Edge t8e Dr<nt <D t8e C)i5&ing. refer to the sheathing 48"x59" Roof layout below@ Asing : str:ig8t e&ge =<siti<n t8e Sheathing Dirst s8eets =5)9C Bit8 t8e s<DDit =:ne5s@ 78e r<<D s8e:t8ing s8<)5&...
  • Page 23 Step 25 Install Gable Trim -@ Jnsert : T-Z_c0d 5<ng ,30 CetBeen t8e s<DDit =:ne5s :n& t8e r<<D s8e:t8ing <n t8e )==er g:C5e@ Ase -Z-c0d tri9 s;reBs t< se;)re t8e s<DDit =:ne5s t< t8e ,30s@ Ase 1& ;<99<n n:i5s t< se;)re t8e r<<D s8e:t8ing t<...
  • Page 24 Step 26 Install Front Gable Trim continued 0@ Jnst:55 T,Z-c0d 5<ng -31 tri9 C<:r&s :t t8e t<= <D t8e g:C5e@ Blue Ends Together Jnst:55 t8e en& Bit8 t8e C5)e 9:rRing :t t8e ri&ge@ Jnst:55 -31 D5)s8 Bit8 t8e t<= <D t8e r<<D s8e:t8ing@ Ase T& g:5#@ n:i5s@ 82-1/4"...
  • Page 25 Step 28 Install Door Stop on Left Door jt>@ Material Shipped in 48" Door Kit 0Td 3 T0d MreZC)i5t D<<rs -,d 3 0,d 7r:ns<9 [in&<Bs -30d 3 T0d D<<r 7ri9 -30d 3 0TZ_c0d D<<r 7ri9 -31d 3 -/d he>st<ne _Z]cTd 3 T0d GM _cTd Mri9e& D<<r k:9C 1d D<<r Finges D<<r F:n&5e U G:t;8 1d 4:rre5 4<5t...
  • Page 26: Install Doors

    Step 29 Install Doors If your door opening is out of square, the space around the doors will not be even. You can remove and re-position the side trim to make allowances for this. The side trim does not have to be flush with the frame of the door opening.
  • Page 27 Install Roofing — Not Supplied in Kit -@ Jnst:55 9et:5 r<<D 2&ri=2 e&ging :5<ng Optional Roof Covering t8e =eri9eter <D t8e r<<D@ C&5@ !<<D E8ing5es JD ><) nee& &et:i5e& instr);ti<ns <n =;s@ !<<D 2&ri=2 ^&geZ-/2 inst:55ing s8ing5es. t8ere :re g<<& =)C5i;:ti<ns :#:i5:C5e <n5ine@ ]// sQ@ Dt@ Pe5t M:=er...
  • Page 28 M:;Ring Gist iirgini: -12 [i&e 3 ,/2 4)i5&ing hit Qty. Material Shipped on 'A' Pallet Qty. Material Shipped on 'B' Pallet MreZC)i5t S:C5e Pr:9es ,-Z_c0d 3 7r)ss Z 7<= C<r& 3 T-Z_c0d MreZC)i5t S:C5e Pr:9es -fZ-c0d 3 S:C5e X#er8:ng 3 T-Z_c0d 7r)ss Z Gegs 3 ]-Z_cTd S:C5e [:55 Et)&s...