Advertisement

Quick Links

GE GRID SOLUTIONS LLC
CAPMD
TM
I
& I
M
NSTALLATION
NSTRUCTION
ANUAL
First Release
Modification
Revision
Prepared By
Date
Approved by
Control
Checked by:
Date
Approved by
Control
01
MNL
9-06-2024
___
___
___
___
___
___
©COPYRIGHT 2024 GE VERNOVA (USA), LLC AND/OR ITS AFFILIATES. All rights reserved. The information contained herein is GE Grid
Solutions Proprietary Technical Information that belongs to GE Vernova, GRID SOLUTIONS, LLC and/or their affiliates, which has been
provided solely for the express reason of restricted private use. All persons, firms, or corporations who receive such information shall be
deemed by the act of their receiving the same to have agreed to make no duplication, or other disclosure, or use whatsoever for any, or all
such information except as expressly authorized in writing by GE Vernova, GE GRID SOLUTIONS, LLC and/or its affiliates.
Page 1 of 11
© 2024 GE Grid Solutions and/or its affiliates. All rights reserved.

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Grid Solutions CAPMD and is the answer not in the manual?

Questions and answers

Summary of Contents for GE Grid Solutions CAPMD

  • Page 1 Control 9-06-2024 ©COPYRIGHT 2024 GE VERNOVA (USA), LLC AND/OR ITS AFFILIATES. All rights reserved. The information contained herein is GE Grid Solutions Proprietary Technical Information that belongs to GE Vernova, GRID SOLUTIONS, LLC and/or their affiliates, which has been provided solely for the express reason of restricted private use. All persons, firms, or corporations who receive such information shall be deemed by the act of their receiving the same to have agreed to make no duplication, or other disclosure, or use whatsoever for any, or all such information except as expressly authorized in writing by GE Vernova, GE GRID SOLUTIONS, LLC and/or its affiliates.
  • Page 2: Table Of Contents

    Should further information be desired or should particular problems arise which are not covered sufficiently for the purchaser’s purposes, the matter should be referred to GE. Page 2 of 11 © 2024 GE Grid Solutions and/or its affiliates. All rights reserved.
  • Page 3: Introduction

    LED blinking. Sensors are mainly designed to be installed on fuseless cap banks with no/minimum harmonic content – in case of special applications, please contact our team. Page 3 of 11 © 2024 GE Grid Solutions and/or its affiliates. All rights reserved.
  • Page 4: Instructions For Installation

    Keep in mind If you have also purchased CapMD receivers, select mounting configurations that give each sensor as close to a line-of-sight with a receiver as possible. Page 4 of 11 © 2024 GE Grid Solutions and/or its affiliates. All rights reserved.
  • Page 5 “Terminal A”, and the capacitor terminal that the voltage divider will be connected to is designated “Terminal B.” Page 5 of 11 © 2024 GE Grid Solutions and/or its affiliates. All rights reserved.
  • Page 6 14. Reinstall all removed connections from Terminal A back onto the terminal extender. Torque the nut to 38-42 N.m or 10-11 ft.lb. 15. Reinstall animal protection onto both Terminal A and Terminal B. Page 6 of 11 © 2024 GE Grid Solutions and/or its affiliates. All rights reserved.
  • Page 7: Sensor Field Validation Test

    5. Disconnect the auxiliary power supply. 6. Replace the protective cap onto the auxiliary power connector. FIELD CONFIGURATION SOFTWARE Currently the sensor configuration will be performed by the GE grid solutions service team. USING THE CAPMD SENSOR The target capacitor impedance and the warning/failure thresholds will be set at the factory or by the field service team.
  • Page 8: Capacitor Unit Field Measurement

    CAPACITOR UNIT FIELD MEASUREMENT To measure capacitor unit capacitance, use a GE’s NCM-20 capacitance meter or equivalent. Disconnect the leads, remove the sensor (needed?) and test capacitance between terminal A and B as per instructions of the capacitance meter manual/manufacturer.
  • Page 9: Fcc - Electronic Labeling Guidance

    —Reorient or relocate the receiving antenna. —Increase the separation Page 9 of 11 © 2024 GE Grid Solutions and/or its affiliates. All rights reserved.
  • Page 10: Sensor Troubleshooting

    If sensor is not responding, please contact us with serial#. The sensor can be replaced by a spare one while the investigation is performed. 10 SUPPORT CONTACTS Factory address: GE ITI - 1925 Calumet St, Clearwater, FL 33765 Factory contacts - Sales: capmd-sales@ge.com Factory contacts - Service: capmd-sales@ge.com...
  • Page 11 GE GRID SOLUTIONS LLC GE BRILLIANT FACTORY CLEARWATER, FL Page 11 of 11 © 2024 GE Grid Solutions and/or its affiliates. All rights reserved.

Table of Contents