Download Print this page
ZUCCHETTI Gill ZGL5517 Instruction For The Installation

ZUCCHETTI Gill ZGL5517 Instruction For The Installation

Faucets

Advertisement

Quick Links

Gill
Istruzioni per l'installazione della rubinetteria
I
Instructions for the installation of the faucets
GB
Instructions pour l'installation de la robinetterie
F
Montageanleitungen zur installation der armaturen
D
Instrucciones para la instalacion de la griferia
E
ИНСТРУКЦИИ ПО МОНТАЖУ СМЕСИТЕЛЬНОЙ АРМАТУРЫ
RU
Instrukcje instalacji armatury
PL

Advertisement

loading
Need help?

Need help?

Do you have a question about the Gill ZGL5517 and is the answer not in the manual?

Questions and answers

Summary of Contents for ZUCCHETTI Gill ZGL5517

  • Page 1 Gill Istruzioni per l’installazione della rubinetteria Instructions for the installation of the faucets Instructions pour l’installation de la robinetterie Montageanleitungen zur installation der armaturen Instrucciones para la instalacion de la griferia ИНСТРУКЦИИ ПО МОНТАЖУ СМЕСИТЕЛЬНОЙ АРМАТУРЫ Instrukcje instalacji armatury...
  • Page 3 Index Gill collection ZGL5517-ZGL5518 ZGL5266 ZGL5327 ZGL5766 ZGL5767 Z92250 Z92251 ZGL5695 ZGL5729-Z94614 ZGL5659-ZGL5660 ZGL5646 ZGL5512 ZGL5661-ZGL5662...
  • Page 4: Installazione - Installation

    Installazione - Installation ZGL5517-ZGL5518 Utensili necessari - Necessary tools CH.12 CH.2 CH.27 ≥10 mm CH.12...
  • Page 5 CH.27...
  • Page 6 CH.2 CH.2 CH.32 - FLESSIBILI DI ALIMENTAZIONE G 1/2” F NON INCLUSI - FLEXIBLE HOSES G 1/2” F NOT INCLUDED...
  • Page 7 Installazione - Installation ZGL5266-ZGL5327 Utensili necessari - Necessary tools CH.12 CH.2 CH.27 FORO/ HOLE Ø 35 mm CH.12 CH.12...
  • Page 9 Installazione - Installation ZGL5766-ZGL5767-Z92250-Z92251-ZGL5695-ZGL5729 Utensili necessari - Necessary tools TEFLON CH.27 CH.17 CH.13 CH.2 CH.17 X-5 mm CHIUSO CLOSED...
  • Page 10 X+7 mm CH.13...
  • Page 11 CH.27 CH.2 CH.2 CH.2...
  • Page 13 Installazione - Installation ZGL5659-ZGL5660-ZGL5661-ZGL5662-ZGL5646 Utensili necessari - Necessary tools CH.27 CH.17 CH.2 CH.3 CH.3...
  • Page 14 CH.2 X-5 mm ECCETTO/EXCEPT ZGL5646 CH.17...
  • Page 15 X+7 mm PAG.11 CH.27 CH.2...
  • Page 16 Installazione - Installation ZGL5512 Utensili necessari - Necessary tools TEFLON CH.42 CH.35 CH.2 Ø 48/50 Ø 33/35 Ø 33/35 Ø 33/35 Ø 33/35 DEVIATORE DIVERTER 100 100 100...
  • Page 17 CH.2 CH.35 FILETTO SINISTRO LEFT THREAD...
  • Page 18 CH.35...
  • Page 19: Water Inlet

    WATER INLET...
  • Page 20 Sostituzione vitone - Headwork replacement ZGL5517-ZGL5518-ZGL5266-ZGL5327-ZGL5512 CH.2 CH.19...
  • Page 21 Sostituzione vitone - Headwork replacement ZGL5766-ZGL5767-Z92250-Z92251-ZGL5695-ZGL5729 ZGL5659-ZGL5660-ZGL5661-ZGL5662-ZGL5646 CH.2 CH.27 CH.17...
  • Page 22 можете воспользоваться чистящим средством ZETABRILL. product ZETABRILL. CZYSZCZENIE NETTOYAGE Do czyszczenia wszystkich produktów Zucchetti, zarówno chromowanych, złoconych, malowanych, jak i w innych, specjalnych Pour nettoyer toute notre robinetterie dans les versions chromées, dorées, colorées ou finitions particulières, il est recommandé d’éviter wykończeniach, absolutnie nie wolno stosować...
  • Page 23 Recommended temperat.: 60-65°C Zucchetti taps can be used with electric storage water heathers and instant gas types, centralised system, combi wall-mounted gas boilers and district heating systems. Before connecting the taps we recommend draining the system thoroughly; it is also advisable to install under basin stop valves with filter (art.
  • Page 24 Zucchetti Rubinetteria S.p.A. Via Molini di Resiga, 29 - 28024 Gozzano (No) - Italy - Tel. +39 0322 954700 - Fax +39 0322 954823 - www.zucchettikos.it...