Installing The Hub; Making Connections - D-Link DSH-8 User Manual

D-link dsh-8 network-hub: user guide
Table of Contents

Advertisement

except that their pinouts are different.
and the Uplink port at the same time.
Right-hand Side Panel
♦ AC Power Adapter Connector For the external power supply.

Installing the Hub

Install the hub in a fairly cool and dry place. See Specifications for the
acceptable temperature and humidity operating ranges.
Install the hub in a site free from strong electromagnetic field
generators (such as motors), vibration, dust, and direct exposure to
sunlight.
Leave at least 10 cm of space at the front and rear of the hub for
ventilation.
Install the hub on a sturdy, level surface that can support its weight.
When installing the hub on a level surface, attach the rubber feet to
the bottom of the device. The rubber feet cushion the hub and protect
the hub case from scratches and prevent it from scratching other
surfaces.

Making Connections

Connectivity Rules
Ethernet
(10Mbps)
networks
connectivity rules:
Do not use both Port 1
need
to
respect
the
following

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents