Pre-Delivery Inspection Clearances Top – 24 in. Minimum for top mount fan. Service Side 18 in. Minimum for end mount fan. Fan End Service Side – 18 in. Minimum Non-Service Side – 7 in. Minimum Fan End – 1 in.
Page 4
Grounding EnPak Ground Cable from EnPak to Chassis. EnPak mechanically bonded to chassis with metal-to-metal contact. Hoses Compressor ¾ in. ID hose used. Hose runs direct from EnPak to tank. 20-gallon tank recommended. 10-gallon tank minimum. ...
Page 5
Pre-Delivery Setup Compressor ON/OFF Settings Button Start Button Green LED Verify Safety Interlock -Watch Green LED. Should be flashing when Safety Interlock is engaged. Should be OFF when chassis can move. -Press Start button once to turn on Remote. -Press Settings button. -On Settings Screen, select the System Settings option.
Page 6
Crane Voltage Threshold For 0V to 12V Step or 0V to 12V Proportional remotes, set to .1V For IMT Cranes, set higher than .1V For 12V to 0V Proportional remotes, set to slightly less than 12V. IF unit does not idle down when all loads are off, increase the Crane Voltage Threshold slightly until unit idles down.
Page 7
Use of hydraulics Tapping a stick electrode to workpiece (weld equipped units, in stick mode, with Tap To Start Enabled) Chassis battery voltage drops below 12.3 volts Start the unit with one of the above methods Set Auto Start/Stop time to desired length Finishing Up ...
Need help?
Do you have a question about the EnPak A60 GBHW and is the answer not in the manual?
Questions and answers