QED MICROPURGE MP100 Operation Manual

QED MICROPURGE MP100 Operation Manual

Peristaltic pump

Advertisement

Quick Links

Operation Manual
M
P
® MP100
ICRO
URGE
Peristaltic Pump

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the MICROPURGE MP100 and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for QED MICROPURGE MP100

  • Page 1 Operation Manual ® MP100 ICRO URGE Peristaltic Pump...
  • Page 2: Table Of Contents

    Operation Manual MP100 Peristaltic Pump TABLE OF CONTENTS Table of Contents ..............................2 Introduction ................................3 Intended Use ................................. 3 Setup & Operation ..............................4 Components ................................4 setup ..................................5 System Operation ..............................7 System Maintenance + Transport ......................... 7 Technical Specifications ............................
  • Page 3: Introduction

    INTRODUCTION INTENDED USE The QED Environmental Systems Inc, MP100 is a portable peristaltic pump designed for collecting shallow groundwater and surface water samples. It operates using a 12V power supply, making it great for field use. Peristaltic pumps work on the principle of peristalsis, utilizing a flexible tube and rollers at the pump head. The fluid only contacts the inside of the tube, making cleaning and maintenance easy and preventing cross- contamination.
  • Page 4: Setup & Operation

    Operation Manual MP100 Peristaltic Pump SETUP & OPERATION COMPONENTS 1. Pump head assembly 2. Speed control knob 3. Rotation direction (forward/reverse) 4. Power ON / OFF 5. Voltmeter 6. Resettable circuit breaker (6A) 7. 12V power cable 8. Power cable connector 9.
  • Page 5: Setup

    Operation Manual Page 5 of 11 MP100 Peristaltic Pump preset depth of the probe, the MP30 unit will send a signal to the peristaltic pump to pause operation. When the water level rises above the probe depth again or the probe is lowered further, the pump will resume operation. Replacement &...
  • Page 6 Operation Manual MP100 Peristaltic Pump 4. Lay cut tubing on top of the roller assembly, see picture. With the roller assembly parallel with the QED logo. 5. With the Power OFF. Rotate by hand the roller assembly in a clockwise or counterclockwise motion, while pushing the tubing down into place around the perimeter of the motor housing.
  • Page 7: System Operation

    8. Increase the speed with the dial, there will be a delay in water coming to the surface. SYSTEM MAINTENANCE + TRANSPORT Tubing: QED recommends the use of a silicone tubing for proper performance of the pump; use of incorrect tubing or tubing material may damage the pump head and void the warranty.
  • Page 8: Technical Specifications

    Operation Manual MP100 Peristaltic Pump TECHNICAL SPECIFICATIONS Maximum water depth below ground surface: Up to 30 ft of lift (at sea level) Overall Case Dimensions: 16.44 x 13.00 x 6.82 in Power Source: 12 VDC Operating Current: 2 Amps Overcurrent Protection: 6 Amps Weight: 13.5 lbs APPROXIMATE FLOW RATES Pump Tubing...
  • Page 9: Patent Information

    3. Separately Sold Parts, Spare Parts Kits and Repairs - Separately sold parts and spare parts kits are warranted for ninety (90) days. Repairs performed by QED are warranted for ninety (90) days from date of repair or for the remaining term of the original warranty, whichever is longer.
  • Page 10 This warranty does not cover, and QED shall not be liable for general wear and tear, or any malfunction, damage or wear caused by faulty installation, misapplication, abrasion, corrosion, inadequate or improper maintenance, negligence, accident, tampering, substitution of non- QED component parts, or the selection of improper material or product configuration for Purchaser’s...
  • Page 11 QED Environmental Systems Inc. 2355 Bishop Circle West Dexter, MI 48130 - 1592 1 (800) 624 – 2026 info@qedenv.com A Graco Company...

Table of Contents