Download Print this page

Amphenol MSD Series Assembly Instructions

Advertisement

Quick Links

AI-22
Industrial
1500V 350A MSD
Assembly Instructions
Rev.
Date
Description
A
2023/05/20
Initial Release
1

Advertisement

loading
Need help?

Need help?

Do you have a question about the MSD Series and is the answer not in the manual?

Questions and answers

Summary of Contents for Amphenol MSD Series

  • Page 1 AI-22 Industrial 1500V 350A MSD Assembly Instructions Rev. Date Description 2023/05/20 Initial Release...
  • Page 2 Installation Process AI-22 EXPLANATION 1. M8 Nut (Customer to prepare) 2. Soft copper plate (Customer to prepare) 3. MSD Receptacle 4. Installation panel (Customer to prepare) 5. M5 screws (Customer to prepare) 6. MSD plug...
  • Page 3 Mounting Requirements AI-22 When installing the receptacle, the customer needs to prepare 4* M5 screws assemblies (including spring washers and flat washers). Insert the receptacle through the mounting panel, secure the recep- tacle and mounting panel with 4* M5 screws, The recommended screw specifications are 8+A+Bmm, A is the thickness of the mounting panel, B is the thickness of the spring washer), the recommended installation torque is 5.0±0.5 N•m.