Advertisement

Monitor Service Manual
Model: BE24ECSBT
Version no.: 0
Release date: 2024/4/15

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the BE24ECSBT and is the answer not in the manual?

Questions and answers

Summary of Contents for Asus BE24ECSBT

  • Page 1 Monitor Service Manual Model: BE24ECSBT Version no.: 0 Release date: 2024/4/15...
  • Page 2 ASUS will only be responsible for or indemnify you for loss, damages or claims based in contract, tort or infringement under this Warranty Statement. This limit also applies to ASUS’ suppliers and its reseller. It is the maximum for which ASUS, its suppliers, and your reseller are collectively responsible.
  • Page 3: Table Of Contents

    Table of Contents 1. Safety Precautions ......................4 2. Exploded View ........................5 3. Disassembly and Assembly Procedures................ 6 Disassembly SOP ...................... 6 Assembly SOP ......................10 4. Trouble Shooting ......................14...
  • Page 4: Safety Precautions

    1. Safety Precautions FOR PRODUCTS CONTAINING LASER: DANGER- Invisible laser radiation when open. AVOID DIRECT EXPOSURE TO BEAM. CAUTION- Use of controls or adjustments or performance of procedures other than those specified herein may result in hazardous radiation exposure. CAUTION- The use of optical instruments with this product will increase eye hazard. TO ENSURE THE CONTINUED RELIABILITY OF THIS PRODUCT, USE ONLY ORIGINAL MANUFACTURER'S REPLACEMENT PARTS, WHICH ARE LISTED WITH THEIR PART NUMBERS IN THE PARTS LIST SECTION OF THIS SERVICE MANUAL...
  • Page 5: Exploded View

    Item Description Q'ty Description Q'ty PANEL SCRW TAP-P FPH M3*8(5/1.2) BZN MIDDLE FRAME MYLAR PWR BE24ECSBT KEY BOARD MYLAR USB #SCRW TP-B FPH M2*4L B-ZN Rear Case #SCRW MACH FLATM3*0.5P*4.5L ZN SENSOR BOARD ASSY SHIELDING #SCRW TAP-P PH W/FL M3*6L B-ZN SPEAKER SCRW FPHM4*10L(7.7/1.6)B-ZN NY...
  • Page 6: Disassembly And Assembly Procedures

    3. Disassembly and Assembly Procedures Disassembly SOP Preparation before disassemble 1. Clean the room for disassemble 2. Identify the area for monitor 3. Check the position that the monitors be placed and the quantity of the monitor; prepare the area for material flow; according to the actual condition plan the disassemble layout 4.
  • Page 7 1. Tear off Mylar and disinsert Key Board wire Remove tapes from Main Board. 2. Tear off 2 tapes from lamp wire & Speaker then disassemble cable Remove tapes from Main Board. Remove tapes Remove tapes 3. Remove tapes from cable.
  • Page 8 1. Unlock 9 Middle Frame Torque : screws. 7.0±0.5 Screw: (#SCRW MACH Kg-cm FLATM3*0.5P*4.5L ZN) 2. Unlock 3 screws to remove Key Board. Torque : Screw: 1.3±0.1 (#SCRW TP-B FPH M2*4L Kg-cm B-ZN) Screw driver...
  • Page 9 Torque : 1. Unlock 1 screws on the 4.5±0.5 Kg-cm Shielding. Screw: (SCRW TP-S FPH M3*6(6/1.3) BZN) Main Board 2. Remove Mylar. 3. Unlock 7 PCBA screws Power Screw and disassemble Main Main Board Board driver Board and Power Board Torque : from Shielding.
  • Page 10: Assembly Sop

    3.2 Assembly SOP Preparation before assemble 1. Clean the room for work 2. Identify the area for material 3. Prepare the implement, equipment and materials as bellow: 1) Working table 2) Screw-driver 3) Glove 4) Cleaning cloth 5) ESD protection After unplugging the power cord, the power board still have power energe.
  • Page 11 4. Lock 1 screws on the Shielding and paste 2 safety mylar on the Shielding. Screw: Torque : (SCRW TP-S FPH 4.5±0.5 Kg-cm M3*6(6/1.3) BZN) 1. Assemble Key Board to Middle Frame then lock 3 screws to fix Key Board. Screw: Torque : #SCRW TP-B FPH...
  • Page 12 4. Assemble the LVDS Cable/Main Board to Panel wire to the Don’t cross the cable Don’t paste the wire on the screw Main Board & Panel. The wire can’t cover on the screw Fix the wire in the wire clip 5.
  • Page 13 1. Assemble Stand to Rear Case. 2. Finish...
  • Page 14: Trouble Shooting

    4. Trouble Shooting...

Table of Contents