Growatt THOR 40DS-P US User Manual

Growatt THOR 40DS-P US User Manual

Dc charging equipment

Advertisement

Quick Links

Shenzhen Growatt Dynocharge Energy Technology Co., Ltd.
4th Floor, No.23 Zhulongtian Road, Shuitian Community, Shiyan Street,
Baoan District, Shenzhen
T
+ 86 755 2747 1900
E
info@ginverter.com
www.ginverter.com
W
THOR 40DS-P US
DC charging equipment user manual

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the THOR 40DS-P US and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for Growatt THOR 40DS-P US

  • Page 1 THOR 40DS-P US DC charging equipment user manual Shenzhen Growatt Dynocharge Energy Technology Co., Ltd. 4th Floor, No.23 Zhulongtian Road, Shuitian Community, Shiyan Street, Baoan District, Shenzhen + 86 755 2747 1900 info@ginverter.com www.ginverter.com...
  • Page 2 NSTRUCTIONS PERTAINING TO A RISK OF FIRE OR ELECTRIC SHOCK. and publications. INSTRUCTIONS AYANT TRAIT à UN RISQUED’INCENDIE OU DE All rights reserved. Growatt has the final interpretation of this user manual. The CHOC éLECTRIQUE product specification may be updated from time to time and is subject to change without prior notice! For use with Electric Vehicles.
  • Page 3: Table Of Contents

    5.3 4G Configuration ................20 Check the charger cable and case regularly for damage. If the product is 5.4 AP Mode Configuration ..............21 defective or damaged, suspend use and contact Growatt for advice. 6. Parameter configuration 6.1 System Parameters................23 6.2 Network parameters................. 24 Do not open, repair, tamper or modify the charger in any way without.
  • Page 4: Product Description

    1. Product description 1. Main board; 2. SECC communication; 3. SPD (Lightning protection); ① ② ③ 4. AC input terminal block. Terminal definition is ( L3;)from left to right; 5. PE terminal; 6. Insulation testing; 7. Power meter. 1. LED indicators; 6.
  • Page 5: Packaging List

    2. Packaging list 3. Installation and wiring 3.1 Installation on the wall Items Remark DC EV Charging station 3.1.1 Firstly, according to the specific installation height requirement of the user, determine the installation height of the charging equipment and the installation User manual height of the cable holder.
  • Page 6: Installation On A Pole

    3.2 Installation on a pole 3.1.3 After the mounting bracket and cable holder is fixed, place the charging 3.2.1 Open the packaging of the pole, take out the pole and mounting accessories. equipment onto the mounting bracket, with the outward bent part inserted to the slot on the rear side of the charging equipment.
  • Page 7 3.2.3 Fix the pole onto the holes with expansion bolts. The input cables shall go 3.2.5 Position the charger onto the bracket and secure it on the bracket with the 2 into the pole from the bottom middle area and come out of it from the area below screws.
  • Page 8: Wiring

    Note: 3.3 Wiring 1.Only professional personnel can do the wiring, connect the AC input wires in correct Now prepare for wiring. Use 3 power cables and 1 PE cable, it is suggested to use phase order according to the markings on the terminal block. a 4-core cable(with PE included) for the convenience of using the water-proof cable gland.
  • Page 9: App Download, Register, And Login

    Users can scan the QR code (Android and IOS ) with the WeChat, or go to the App Store and Google Play to search for ShinePhone or log in to our monitoring website server.growatt.com or server-cn.growatt.com to download. 4.2 Register Before using ShinePhone APP the first time, the user must register an account in advance.
  • Page 10: Sign In And Log Out

    5. EV Charger Internet Configuration b) There are two ways to fill in the plant address, automatic acquisition, and For new users, please click the "+" in the upper right corner of the overview, select manual input. Automatic acquisition, through satellite positioning, obtain the “...
  • Page 11: Wifi Configuration

    5.1 WiFi Configuration a) Choose a related power plant after adding the device (Note: a power plant is required to build before adding the EV Charger) b) Enter the serial number of the EV charger or scan the Bar/QR code to add the EV charger c) Select “WiFi”...
  • Page 12: Network Cable Connection Configuration

    5.2 Network Cable Connection Configuration a) Choose a related power plant after adding the device (Note: a power plant is required to build before adding the EV Charger b) Enter the serial number of the EV charger or scan the Bar/QR code to add the EV charger c) Select “Network Cable”...
  • Page 13: Configuration

    5.3 4G Configuration If the EV charger is a 4G model, then the user can click the “skip” directly during the page of network configuration methods. © ©...
  • Page 14: Ap Mode Configuration

    6. Parameter configuration 5.4 AP Mode Configuration If the network connection is abnormal, the users can use the AP mode to reset the After installed and connected, the charging equipment must first be configured network or do some basic setting. according to the actual needs of the user.
  • Page 15: System Parameters

    6.1 System Parameters Function description Parameters DC meter’s modbus address(already preset in Meter address factory, it is not allowed to modify) Screen language Settings, integrated English Language set and French System time setting. Format is Y, M, D, H, M, S. The Year setting can only set the last 2 digits, Time set e.g.
  • Page 16: Protection Parameters

    6.1 System Parameters 6.3 Protection parameters The protection-related parameters, such as voltage, current, temperature, power, etc. Function description Parameters Server address setting, used to set domain or IP Server URL1 address of back-office server. Address of backup server. This parameter is not Server URL2 available now, reserved for future use.
  • Page 17: Operation Instruction

    7. Operation instruction and LCD description 7.1 Charging mode and Operation RFID mode: User can go to the “setting” page and click the “Charger setting”, to set the Charging can only be initiated or ceased by swiping RFID card. charging activation way like APP, RFID, plug and charge. RFID mode operation process flow Plug&Charge: Charging will start automatically afte r EV plugged in.
  • Page 18: Lcd Interface Introduction

    7.2 LCD interface introduction The charging equipment is equipped with a 7 inch industrial-grade resistor type touch panel. The display content is as below, Password window. Before entering numeric, please first press the text display field to move the cursor there, then you can type in the 4- When powered up, the charging digit password.
  • Page 19: Ev Charger Workmodes

    8. EV Charger WorkModes 8.1 Fast Mode Plug & Charge Click “charge” directly and the EV will be charged at maximum power coming from a renewable energy source or simply from the grid, especially quick if you’re in a Fault record page, user can check hurry, and support multiple control strategies of timer, charging capacity, charging history fault record here.
  • Page 20: Pv Linkage Mode

    8.2 PV Linkage Mode Charging Capacity Reservation Users can set the target charging capacity(kWh) and the start time through Introduction clicking “energy”, and also can enable “every day” to make it to work following that Driven by solar, charge your car with renewable energy, the EV will be charged by strategy to work all the time the surplus solar power dynamically, combining PV and EV charger together to maximize the solar self-consumption rate and cut your bill.
  • Page 21 Wiring APP Operation To monitor the real-time power import and export from the grid, meter The PV linkage mode require the EV charger to connect with an external current is required for this function to work properly sensing device, and choose the corresponding configuration *(Meter type, choose the right brand of the meter type,SDM630MCT ETL) The SDM630MCT ETL meter is used, please wire it as below.
  • Page 22 Boost Function ●Manual Boost Function It is useful if users arrive home with an almost empty battery and users want to ●Smart Boost Function charge the EV quickly to ensure enough energy for a short trip when the solar It’s useful to guarantees EV’s battery capacity before a set time when the solar energy is insufficient.
  • Page 23: Off-Peak Modes

    Smart Boost Function 8.3 Off-peak modes Introduction It’s useful to guarantees EV’s battery capacity before a set time when the off-peak time is not long enough. Once enable the Off-Peak mode, the EV charger will automatically charge the EV when it’s at off-peak time to reduce the electricity bill. Users also can customize their low-rate charging time in the off-peak mode page While users enable the smart boost function and set “pick-up time”...
  • Page 24: Load Balancing Function

    8.4 Load balancing function The EV charger can read the incoming power to the house with an additional CT/Meter. Then the EV charger will adjust its charging power dynamically according to the home power to avoid exceeding the limited point, always charge your car at the maximum charging speed without triggering the power limitation.
  • Page 25: Other Settings

    9. Other Settings Network setting: network connection method, network mode setting, gateway The setting page includes basic information, network setting, pile setting, load settings, subnet mask, DNS address balancing and authorization management. ●Basic information: EV charger ID, EV charger name, country and city, version number.
  • Page 26 ●Version upgrade Users can check the latest version of the charger’s firmware and the current version they are used now.If there is new version,users can upgrade by clicking the ‘Upgrade’. ●Authorization management: Permissions: it’s useful for authorization management, add and authorize the other account which can use the EV Charger directly...
  • Page 27: Record

    10. Record 11. Data a)Charging record: The users can read the total charge capacity(kWh) and cost, also the self- consumption energy and rate by day, month, and year. Display the serial number of the EV charger, number of the charging gun, start time, end time,charging time, charging cost, charging capacity, and self- consumption rate b)Appointment record:...
  • Page 28: Configuration Through Internal Web (Service Tool)

    12. Configuration through internal web (Service Tool ) 3. Right-click on Local Area Connection and click on Properties. After the installation and wiring is done, connect the Charger to a computer and configure parameters via the web browser of the computer, then the Charger can be ready for use. 12.1 Set computer’s IP The Charger’s default IP address is 192.168.1.5.
  • Page 29: Configure Parameters

    (3) Charger ID, this is the unique identification of the Charger. If the charger is to be connected to Growatt back-office server, this ID must be set as the serial number on the nameplate of the Charger. Otherwise the Charger cannot be registered on the server.
  • Page 30 (10) Server URL is to set the domain name or IP address of the back office server to be other information. connected. The domain name of Growatt server is “ws://ev.growatt.com:80/ocpp/ws”; IP address is “ws://192.168.1.5:8080/ocpp/ws”. Authentication Key and Heartbeat Interval is used for testing and no need to reset.
  • Page 31 (24) MAC address. This is the MAC address used for LAN cable connection. If the charger is connected to Growatt back-office server via LAN cable and the router has MAC access control, then you can put this MAC in the router to allow the charger to access server Fig.18...
  • Page 32: Update By Sd Card

    12.3 Update by SD card (25) Charging fee per unit of electricity. There are 2 ways to update firmware for EV charger 1. Update by SD card 2. Update on parameter setting page Fig.25 (26) Login password is used for web page login parameter settings,the default password The firmware file must be named as “App.bin”.
  • Page 33: Update On Parameter Setting Page

    3. Open the txt file, write “state=1” in it and save the file. 4. Insert the SD card into the charger, turn off and back on the charger, the update will start automatically. The indicator will first flash red and then flash green with a long beep as the end of the update(sometimes the beep sound may not be clearly heard).
  • Page 34: Troubleshooting

    13. Troubleshooting 13.1 Fault list Fault description During the update, the LED indicator will behave as below, Emergency stop is pressed! First flash red and goes out with a short beep sound, during this period the firmware file is RFID communication fault! transmitted to the charger’s flash memory from the computer;...
  • Page 35: Firmware Update Fails

    a. Please check and input the correct WiFi SSID and password to retry; AC Input Overvoltage! AC Input Undervoltage! BMS communication fault! Door is opened Fan working fault 13.2 Firmware update fails 13.2.1 Firmware update failure with SD card: If you check the WiFi setting on the APP, please turn off and back on the charger and connect your mobile to the WiFi emitted by the charger for checking and setting.
  • Page 36: Cannot Access Parameter Setting Page

    Check if server address is correct in the“Server URL” field. The correct setting is : ws://evcharge.growatt.com:80/ocpp/ws d. 1. Some routers have 2 WiFi, one is 2.4GHz, the other is 5GHz. Most homes just use the 5GHz WiFi as their default WiFi.
  • Page 37 (3). Right-click on Local Area Connection and click on Properties. c. Check what web browser is being used, it’s suggested to use Firefox or IE, Chrome cannot be used to update firmware. d. Check if you have input the complete content, which is http://192.168.1.5:8080, in the address field, do not leave out the http:// or the“:8080”.
  • Page 38: Charging Issue

    14. Specification 13.5 Charging issue Model THOR 40DS-P US If charging cannot start after the car is plugged in, a. Check if the red emergency stop button is pressed. Dimension(mm) 632*858*300(W*H*D) b. Check what charge mode is being used Weight(kg)
  • Page 39: Electrical Diagram

    15. Electric diagram Ingress protection NEMA 3R Operating temperature -13℉~122℉, derate since 122℉ 208V/240V/480V/AC input Relative humidity 5%~95% ≤2000m, derate for higher than 2000m Altitude Forced air cooling Cooling method Remote monitoring Ethernet/WIFI/4G/485/232 Payment APP/RFID/Plug&Charge Standby power UL2202, UL2231, ISO15118, FCC part 15B Standards Mounting Wall or Pole...
  • Page 40: Warranty

    16. Warranty Warranty period 13.2 Warning and safety marks Label description The warranty period of this product(Including hardware and software) is 3 year. If the contract stipulates otherwise, the contract shall prevail. WARNING For warranty cases during the warranty period, the customer should present the This device is intended only for charging vehicles invoice of the purchase of the product to our service team.
  • Page 41: Contact

    17. Contact Company Name:Shenzhen Growatt Dynocharge Energy Technology Co., Ltd. Address: 4th Floor, No.23 Zhulongtian Road, Shuitian Community, Shiyan Street, Baoan District, Shenzhen Website: www.ginverter.com Service line: 86 755 2747 1900 E-mail: info@ginverter.com...