Download Print this page
One Link Dynagen 9988N Installation Manual

One Link Dynagen 9988N Installation Manual

Advertisement

Quick Links

Installation Instructions:
1. Put the generator in stop mode.
2. Disconnect the positive battery terminal.
(Do not reconnect the positive battery
terminal until step 19.)
3. Using the magnetic mounts, mount the
One Link inside of the generator enclosure
close to the controller. (Be sure the
mounting location is away from weather
exposure.)
4. Connect the ring connector on the
wire of the battery wiring harness to the
positive (+) battery terminal.
5. Connect the ring connector on the
wire of the battery wiring harness to the
negative (-) battery terminal.
6. Route the
red
the One Link I/O cable to the battery wiring
harness installed in steps 4 and 5.
7. Using one of the included lever wire
connectors, connect the bare
from the battery wiring harness to the
wire from the One Link I/O cable.
8. Using one of the included lever wire
connectors, connect the bare
the battery wiring harness to the
from the One Link I/O cable.
wire and
black
black
red
1 (888) 366-7886
red
black
wire from
wire
black
wire from
red
wire
Dynagen 9988N
Installation Guide
One Link v2
Panel:
Parts List:
OLM002
Lever Connectors(2)

Advertisement

loading
Need help?

Need help?

Do you have a question about the Dynagen 9988N and is the answer not in the manual?

Questions and answers

Summary of Contents for One Link Dynagen 9988N

  • Page 1 (-) battery terminal. 6. Route the wire and black wire from the One Link I/O cable to the battery wiring OLM002 harness installed in steps 4 and 5. 7. Using one of the included lever wire connectors, connect the bare...
  • Page 2 9. Route the white wire from the One Link I/O cable to the back of the Hertz Meter. 10. Route the white wire with black stripe from the One Link I/O cable to the back of the Hertz Meter. 11. Route the blue wire with white stripe from the One Link I/O cable to Terminal 7 on the Electronic Control Unit.
  • Page 3 Installation Instructions(cont.) 19. Reconnect the positive battery terminal to the battery. At this time the One Link will power up and begin communicating with the generator. Please allow 5-10 minutes for the One Link to establish a connection to the internet. Check...