TERRA Installation Manual Nova Series Installation Manual Nova Series Installation Manual Terra Installation Manual Nova Series Installation Manual Nova Series Installation Manual...
3. Condensate Drain P-Trap 3.1 Blow-Through Configuration 3.2 Draw-Through Configuration 3.3 Condensate Pump 4. Access Requirements 5. Lifting Requirements 6. Electrical Hookups 6.1 Electrical Information 6.2 Single Point Power Wiring 6.3 Fan Connection Single Phase 6.4 Fan Connection Three Phase Terra Installation Manual...
(NFPA), and the Canadian Electrical Code (CEC) must be followed. Installation of this product must be performed by a qualified and accredited professional in conformance with local and national codes, standards and licensing requirements. Terra Installation Manual...
External Pipes are protected by wood boxes that are secured with Poly Strapping and must also be removed. If a unit has a baserail, it will be screwed down directly to the pallet. External Pipes Protected by Wood Boxes Terra Installation Manual...
SECOND DRAIN PAN cabinet. If reinforcing the insulation is not feasible in a humid installation environment, it is recommended to provide and install a second drain pan (supplied by others). Terra Installation Manual...
Controls wiring connections must be made by connecting loose quick connector terminals. Please refer to wiring diagrams Note: On units where the fan and filter provided with unit submittal. modules are separated, a tubing quick connect may be provided. Terra Installation Manual...
27 ⅝ 41 ⅜ 66/84 90/108 27 ⅝ 53 ⅜ Dimensions are in inches. DX and HGRH section lengths depend on number of circuits, driven by coil capacity. Electric heater accessory lengths vary and are not included above. Terra Installation Manual...
(HG4) WEIGHT (LBS) 2.6 Installation 2.6.1 Ceiling Mount Terra is available exclusively for ceiling mount/horizontal applications with inner and outer brackets only. The hanging brackets are factory installed. One 5/8” hole on each of the four (4) corner hanging brackets are used for thru-bolting to hang the unit from the 1”...
2.7 Installation of Accessories Terra with Electric Pre-Heat Terra with Factory-Brazed DX Coil Terra with Factory-Brazed DX Coil and HGRH Coil Terra Installation Manual...
Page 10
Terra with mixed air ventilation includes a mixing box coupled accessory. Refer to the diagrams below for duct port layouts related to the mechanical drawing nomenclature. Left-Handed Unit Right-Handed Unit Terra Installation Manual...
Page 11
2.7.1 Coupled Modules & Accessories Terra units come in two or more modules. Refer to the image below for corner bracket details required for coupling. Corner brackets come installed with each Terra unit. Note: Accessories should be independently supported with Unistrut on the end farthest from the unit.
The cable may be extended up to 50m using a Category 3 extension cable. The sensor is adjustable and must be mounted according to manufacturer instructions and the probe must be aligned parallel to the air flow in the center of the duct. Terra Installation Manual...
It is important that the sensor is installed in such a way that the measuring hole is positioned at the center of the duct. Terra Installation Manual...
Series have 1/4˝ OD and a barbed fitting for use with 3/8˝ OD tubing. Caution: While installing check that there are no sharp bends in the tubing at any connection. Bends and creases may leak over time as the tubing ages. Terra Installation Manual...
Page 15
Note: Always mount vertically with pressure connections facing down- wards, drain of possible condensed water (factory calibration). For the measurement of relative pressure, theindication ‘connected to ambient atmosphere’ is shown. Terra Installation Manual...
To Open: 1. Lift the quick release fasteners 2. Swing open the detached cover Ensure the dip switch configuration from the factory matches what is shown below: Tubing (“PIPE”) is coiled and provided loose with the unit. Terra Installation Manual...
L = H + J + Pipe Dia. system and building. • When the fan is ON, it creates positive pressure in the drain pan compartment which aids the drainage of condensate. Terra Installation Manual...
3.3 Condensate Pump If a condensate pump is required for proper drainage, a P-trap is recommended in all cases; however, a p-trap is not required for blow-through coil applications, depending on the specific conditions and local building codes. Terra Installation Manual...
The National Electrical Code (NEC) stipulates that there must be a minimum of 36 inches of clearance from an electrical connection. The installing contractor must ensure there is at least 36 inches of clearance perpendicular to the top of the electrical box. Terra Installation Manual...
5.0 LIFTING REQUIREMENTS Units can be lifted by mounting angles. Lifting directly from the aluminum frame is not recommended. Nova model shown as example only. Unit with Spreader Bars Terra Installation Manual...
6.2 Single Point Power Wiring Terra Installation Manual...
Page 24
THE OXYGEN8 APPLICATIONS TEAM. HARDWIRED POWER SUPPLY RECOMMENDED CONDUIT ROUTING SPP UNIT POWER CABLE FROM ELECTRIC HEATER IS SUPPLIED BY OTHERS AND IS FIELD INSTALLED. OXYGEN8 RECOMMENDS 10 GA WIRING UNLESS OTHERWISE DICTATED BY LOCAL CODES AND STANDARDS. Terra Installation Manual...
Need help?
Do you have a question about the TERRA and is the answer not in the manual?