Download Print this page

tecanno VENT ONE PLUS 100 Installation

Cover installation

Advertisement

Quick Links

COVER INSTALLATION
VENT ONE PLUS 100/125
1.
bolt holders
retention bolts
Vent housing and vent cover
1. Vent housing with four bolt holders
2. Vent cover with four retention bolts
Attention: To avoid contamination on the valve, it is recommended to wear fabric gloves!
3
To disassemble the cover: Use both index fi ngers to reach behind
two corners of the valve cover and press gently against the valve
frame with your thumb. Repeat this process at the other two cor-
ners. In this way, gently pull the retention bolts out of the holders
until the cover is completely detached from the valve housing.
2.
1
Insert all four retention bolts into the four bolt holders on the valve
and gently press until the cover is fl ush to the valve frame.
2
Now the cover is fi rmly in position.
W WW.TECANNO.DE

Advertisement

loading
Need help?

Need help?

Do you have a question about the VENT ONE PLUS 100 and is the answer not in the manual?

Questions and answers

Summary of Contents for tecanno VENT ONE PLUS 100

  • Page 1 COVER INSTALLATION VENT ONE PLUS 100/125 bolt holders retention bolts Vent housing and vent cover 1. Vent housing with four bolt holders Insert all four retention bolts into the four bolt holders on the valve Now the cover is fi rmly in position.
  • Page 2 Attention: To avoid contamination on the valve, it is recommended to wear fabric gloves! them. Hold the cover at a slight angle. Lean the cover onto the vent. Insert the two fl exible tabs into the free slots. Now the cover is fi rmly in position. W WW.TECANNO.DE...

This manual is also suitable for:

Vent one plus 125