REVELL Edur Ice Bath Product Manual
REVELL Edur Ice Bath Product Manual

REVELL Edur Ice Bath Product Manual

Ice bath

Advertisement

Revel Edur
Ice Bath
PRODUCT MANUAL

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Edur Ice Bath and is the answer not in the manual?

Questions and answers

Summary of Contents for REVELL Edur Ice Bath

  • Page 1 Revel Edur Ice Bath PRODUCT MANUAL...
  • Page 2: Table Of Contents

    Contents Important Safety Getting Acquainted Read First Quick start guide Assembly Guide Caring for your Edur Warranty...
  • Page 3: Important Safety

    Ice baths. trical devices. 12. WARNING: Do not turn on power to the Edur Ice Bath until filled to the 5. DANGER: Risk of Electric Shock. Do not permit any electrical appliance, required level. Running the chiller without water could cause immedi- such as a light, mobile, radio, television, etc.
  • Page 4: Getting Acquainted 02

    Getting Acquainted Voltage / Hz 220V /50HZ LED Power 12V 5W Current 0.4 A Adjust the feet to level the Edur ice bath...
  • Page 5: Read First 03

    PLEASE INSPECT THE CRATE TO MAKE SURE ALL ITEMS ARE PRESENT. CHILLER INSTRUCTIONS Edur Ice Bath We’re thrilled for you to start your Edur experience, but we kindly request that you leave the chiller in an upright position and unplugged for four Insulated Tub Cover hours before switching it on.
  • Page 6: Quick Start Guide 04

    Assembly Guide 1. LOCATION REQUIREMENTS Place the Edur Ice Bath on a flat surface that can support 550kg Keep it at least 150cm from any appliances. If placing the chiller near a wall, ensure there is at least 40cm of space between the chiller and the wall to allow for proper air flow.
  • Page 7: Caring For Your Edur 05

    Drain the Edur Ice Bath iii. Drain the water filter iv. Drain the chiller (See Chiller guide for instructions) v. Clean tub with non abrasive cleaner and rinse clean vi. Refill the Edur Ice Bath and follow the initial setup instructions...
  • Page 8: Warranty 06

    Voiding Warranty for Ice Bath Orders: purchase date and a description of the defect or malfunction. - Chiller must be on the same level as the Edur Ice Bath - The interconnecting pipework must be no longer than 5 metres on...
  • Page 9 Revel in Wellness...

Table of Contents