Zuwa SOLARCHECK MOBILCENTER P80 Operating Instructions Manual

Hide thumbs Also See for SOLARCHECK MOBILCENTER P80:

Advertisement

Quick Links

-Zumpe GmbH
-Zumpe GmbH
Pumpen und Spritzgeräte
Pumps and Sprayers
Operating Instructions
betriebsanleitung • operating instructions
notice technique • istruzioni per l'uso • Manual
Solarcheck Mobilcenter P80

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the SOLARCHECK MOBILCENTER P80 and is the answer not in the manual?

Questions and answers

Summary of Contents for Zuwa SOLARCHECK MOBILCENTER P80

  • Page 1 -Zumpe GmbH -Zumpe GmbH Pumpen und Spritzgeräte Pumps and Sprayers Operating Instructions betriebsanleitung • operating instructions notice technique • istruzioni per l‘uso • Manual Solarcheck Mobilcenter P80...
  • Page 2: Declaration Of Conformity

    Notes on the documentation This manual provides important information for a safe and correct operation of the solar filling unit SOLARCHECK MOBILCENTER P80. The manual is designed for qualified personnel who are trained and specialised in installing heating systems. Service and maintenance works must only be carried out by approved specialists.
  • Page 3 ZUWA SOLARCHECK MOBILCENTER english Assembly Instruction Solarcheck Mobilcenter KOMPAKT Step 1 Step 1 Components included:    = Axle          = Hexagon screw with snap ring  = Disc  = Eyebolt ...
  • Page 4: General Safety Instructions

    ZUWA SOLARCHECK MOBILCENTER english 2.1 Legends Danger: immediate danger of death and severe injury Danger: danger of death from electric shock Danger: danger of scald burn Danger of environmental and material damage Information, note 2.2 General safety instructions Store these instructions in such a way that they are accessible at all times for...
  • Page 5: Transportation And Unpacking

    ZUWA SOLARCHECK MOBILCENTER english Danger of scald burn due to high media temperature > Fill the solar system only when cold – if necessary cover the solar collectors. Danger Danger of burn due to hot motor casing > Do not block neither suction nor pressure hose more than 1 minute to avoid overheating of the motor.
  • Page 6: Mounting And Commissioning

    ZUWA SOLARCHECK MOBILCENTER english 4. Mounting and commissioning Connect return hose to Connect pressure hose to tank pump outlet Fill tank and open ball Connect pressure hose (1) and valve return hose (2) to the fill/vent valves and open valves. Close stop valve (3).
  • Page 7: End Of Operation

    ZUWA SOLARCHECK MOBILCENTER english Open tank lid to ensure the circulation of the air. Caution: Monitor fluid level in the tank and, if necessary, refill heat transfer fluid to prevent air entering the solar circuit. Flush the solar circuit with the fluid.
  • Page 8: Maintenance

    ZUWA SOLARCHECK MOBILCENTER english 6. Maintenance Danger of death due to electric shock > Prior to work on the pump, always disconnect the drive from the Danger power supply. Danger of environmental damage due to hazardous pumped media > Collect escaping pumped media and dispose of according to the Caution locally applicable regulations.
  • Page 9: Technical Data

    ZUWA SOLARCHECK MOBILCENTER english 8. Accessories  Four-way cock with bypass for mixing the heat transfer medium on-site  Kit for filling ground loops including two 150 litre tanks, hose extension, additional stop valves and four-way-cock to switch the suction line from external tanks to internal tank ...
  • Page 10: Parts List

    6.1 Connections > Check regularly if hose couplings are tight. Parts list Solarcheck Mobilcenter P80 6.2 Cleaning the filter There is a built-in fine filter on the suction side of the pump to filter out sold and welder residues.
  • Page 11 ZUWA SOLARCHECK MOBILCENTER english 8. Accessories  Four-way cock with bypass for mixing the heat transfer medium on-site  Kit for filling ground loops including two 150 litre tanks, hose extension, additional stop valves and four-way-cock to switch the suction line from external tanks to internal tank ...
  • Page 12 ZUWA-Zumpe GmbH Franz-Fuchs-Straße 13 - 17 • D-83410 Laufen Fon: +49 8682 8934-0 • Fax: +49 8682 8934-34 E-Mail: info@zuwa.de • Internet: www.zuwa.de © 06/2011 ZUWA © 08/2014 ZUWA...

This manual is also suitable for:

Solarcheck mobilcenter kompakt

Table of Contents