Download Print this page
Premier 135NT Installation, Inspection, Operation & Maintenance Manual
Premier 135NT Installation, Inspection, Operation & Maintenance Manual

Premier 135NT Installation, Inspection, Operation & Maintenance Manual

Coupling

Advertisement

Quick Links

MANUFACTURING CO.
THE FIRST NAME IN QUALITY COUPLINGS
Installation, Inspection, Operation
& Maintenance Guide
Model 135NT Coupling
IMPORTANT
Read these instructions completely before installing, using or
attempting to repair this product. If you have any questions,
call Premier at (800) 255-5387 or (503) 234-9202.

Advertisement

loading
Need help?

Need help?

Do you have a question about the 135NT and is the answer not in the manual?

Questions and answers

Summary of Contents for Premier 135NT

  • Page 1 THE FIRST NAME IN QUALITY COUPLINGS Installation, Inspection, Operation & Maintenance Guide Model 135NT Coupling IMPORTANT Read these instructions completely before installing, using or attempting to repair this product. If you have any questions, call Premier at (800) 255-5387 or (503) 234-9202.
  • Page 2 Below are general guidelines for selecting Premier Couplings and Drawbar Eyes. If you feel that your application is unique, please give Premier a call so that we may help you through the selection process. Follow these four steps to ensure proper selection of Premier Couplings and Drawbar Eyes.
  • Page 3 Selecting The Right Equipment Understanding Premier Load Specifications Each Premier product undergoes extensive design and testing prior to being introduced. We use the latest in Computer Aided Design and Analysis Software as well as physical destructive tests. Premier’s published load specifications are the maximum load a given product or part will withstand without failure.
  • Page 4 • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • 2400H † Saf-Tite Product * Industrial Application CAUTION: Verify that both the coupling’s and drawbar eye’s rated capacities meet your application(s) requirements. Page 4 PREMIER MANUFACTURING COMPANY 1-800-255-5387 • www.premier-mfg.com...
  • Page 5 2 1/16 in. (52 mm) property damage, severe injury, or death. Unit Weight: 25.8 lbs. (11.7 kg) STANDARD INSTALLATION DRAWING REPLACEMENT PART INFORMATION 135P 144-75 Model 135NT parts available: 134B 131: 144-75: Snap Ring (2) 132: Latch 275-50: Snap Ring (2) 135A...
  • Page 6 Work the latch assembly several times to then drill the holes. Note: Drill the center distribute the lubricant evenly and remove any hole diameter for the 135NT shaft to 1 7/8 in. excess with a rag. Do not apply lubricant to (48mm).
  • Page 7 Do 7. Never weld on any Premier part in order to NOT use if any of these conditions exist. repair damaged or worn areas. Field and/or 2.
  • Page 8 8. WARNING: Prior to towing, make certain that adequately rated safety chains have been properly connected. IMPORTANT GUIDELINES that apply to all Premier Non-Air Couplings - Do not weld on any coupling assembly - Lubricate all coupling components at a minimum of 90 day intervals...
  • Page 9 (6) PRIOR TO USE, ALWAYS CONNECT SAFETY CHAINS OF ADEQUATE STRENGTH FOR (13) NEVER REPLACE ANY PART IN ANY OF LOAD(S) BEING TOWED. PREMIER’S ASSEMBLIES WITH NON-PREMIER COMPONENTS. DOING SO WILL VOID ALL (7) DO NOT BIND-UP (JACKKNIFE) ANY WARRANTY AND POTENTIALLY COMPROMISE APPLICATION AS STRESSES CAN CAUSE THE UNIT’S INTEGRITY, WHICH COULD RESULT...
  • Page 10 Installation, etc. Revised: 10/09 WARRANTY: We warrant all Premier products to be free from defects in material or workmanship for one year. We will repair or replace, at our option, any Premier product which our examination reveals to be defective, provided that the product is returned to our factory, at Tualatin, Oregon transportation prepaid, within one year of purchase by the first retail purchaser.