Page 4
Installation steps(安装步骤) Step 1 Installation of motor-driven (电动波箱安装): Insert motor-driven the motor-driven into it (电动波箱) according to the position shown in the diagram(将电 动波箱按照图示位置嵌入其 中)...
Page 5
Installation steps(安装步骤) 14500 battery box(14500 电池盒) Waterproof Step 2 switch(防水 Installation of battery box 开关) and waterproof switch(电 池盒及防水开关安装): Install the battery box and waterproof switch in the corresponding position(将 电池盒及防水开关安装至相 应位置)...
Page 6
Installation steps(安装步骤) Step 2’ motor-driven (电动波箱) Refer to the actual internal structure diagram(参见内部 构造实图) 14500 battery box(14500 电池盒) Firing device Water pipes (击发器) Waterproof (水管) switch(防水 开关)...
Page 7
Installation steps(安装步骤) Step 3 Assemble(组装):Merge the other half and assemble the corresponding screws according to the diagram(将另 一半合并,并按照图示装配相应的螺丝)...
Page 8
Installation steps(安装步骤) Step 4 Assemble(组装)Install the handle and assemble the corresponding screws(安 装托手,装配相应的螺丝)...
Page 9
Installation of gun barrel and silencer(枪管及 消音器安装) Installation steps(安装步骤) Step 5 Assemble(组装):The barrel, silencer, and main body are connected through 3D printed threads (枪管,消音器及主 体是通过3D打印的螺纹相连接)...
Page 10
Installation steps(安装步骤) Step 6 Assemble(组装): Glue the sight up and down and push it into the main body (瞄准镜上下胶接,并推入主体) Push in the main body in this direction (沿此方向推入主体) GLUE( 胶接)
Page 11
Installation steps(安装步骤) Step 7 Assemble(组装): Assembly of water storage tank(组装储水瓶), Please install the 14500 battery(请 安装14500电池), The assembly is now complete (至此组装完成), Have fun playing(愉快的玩耍 吧)。...
Need help?
Do you have a question about the Electric Water Gun Toy UZI and is the answer not in the manual?
Questions and answers