BELL SYSTEM PRACTICES
AT&T Company
SECTION 578-4~00
Issue
2.
June 1981
"COMM-STOR*" II COMMUNICATIONS STORAGE UNIT
TESTING AND TROUBLESHOOTING PROCEDURES
1.
GENERAL
1.01
This section covers the COMM-STOR II
Communications
Storage
Unit
manu-
factured by Sykes Dat.atronics, Incorporated,
as
described
in their section SYKS 578-400-500.
1.02
This section is reissued to provide informa-
tion
on improved
diagnostic
test pro-
cedures (Part 5 ).
1.03
Testing
and troubleshooting
procedures
covering the COMM-STOR II Communica-
tions Storage Unit are cont.a.med in the attached
reprint of_ the practice prepared by Sykes Dat.a-
tronics, Incorporated.
(No special equipment
is
required
for the procedures
described
in the
practice.)
*
Registered trademark of Sykes Datatronics, Incorporated.
1.04
This section does not apply to COMM-
STOR II units equipped for 8Al/8Bl
pro-
tocol
operation
on
COMM-STOR
II/SMDR
(St.ation Message Detail Recording) units. Testing
and troubleshooting procedures for 8Al/8Bl
units
are described in Sections 578-400-501 and -502 for
COMM-STOR II SMDR units.
1.05
An
operation
checkout
should
be
performed after installation or on trouble
calls. It may
be
a brief checkout to ensure that the
st.ation is operable or a complete checkout to
exercise all features and options. Since off-line
checkout procedures do not check the interface or
send and receive capabilities, an on-line checkout is
also
required to completely test the COMM-STOR
II unit. (See Section 668-140-500, "Remote Test
Procedures.")
Printed in U.S.A.-
Page 1
1 Page

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the COMM-STOR II and is the answer not in the manual?

Questions and answers

Related Products for Sykes COMM-STOR II

Table of Contents