Parameter of the Unit 11 Installation and connection Transportation Installation Instruction Electrical Installation Electrical Connection Trial After Installation Connecting to the EcoFlow PowerOcean System 30 Maintenance and winterization Maintenance Winterizing 30 Removal procedures for outdoor units Removal Instructions for Outdoor Panels...
Foreword Read the Manual Before WARNING Operation Do not use means other than those recommended by the manufacturer to accelerate the defrosting process or to clean. The appliance shall be stored in a room with no ignition sources (for example: open es, gas appliance, or electric heater).
Page 4
the components are constructed of materials that are inherently resistant to being corroded or are suitably protected against being so corroded. REPAIRS TO SEALED COMPONENTS DD.5.1 During repairs to sealed components, all electrical supplies shall be disconnected from the equipment being worked upon prior to any removal of sealed covers, etc. If it is necessary to have an electrical supply to equipment during servicing, then a permanently operating form of leak detection shall be located at the most critical point to warn of a potentially hazardous situation.
Page 5
system. When the al OFN charge is used, the system shall be vented down to the atmospheric pressure to enable work to take place. This operation is vital if brazing operations on the pipework are to take place. Ensure that the outlet for the vacuum pump is not close to any ignition sources and there is ventilation available.
lubricant. The evacuation process shall be carried out prior to returning the compressor to the suppliers. Only electric heating to the compressor body shall be employed to accelerate this process. When oil is drained from a system, it shall be carried out safely. The Symbol Description of The precautions listed here are divided into the following types.
1 Do not install the unit in a location where there may be ble gas. 2 If ther ble gas around the unit, it will cause an explosion. According to the instruction to carry out drainage system and pipeline work. If the drainage system or pipeline is defective, water leakage will occur.
Accessories Name Quantity Installation & Instruction Manual Operation Manual Wire Controller Temperature Sensor Rubber Mat Overview of the unit Dimensions of the Unit Dimension Unit: (mm) Model 1263 EF AD-P1-9K0-S1...
Page 9
Dimension Unit: (mm) Model 1263 1375 EF AD-P3-20K-S1 Dimensions of the Unit EF AD-P1-9K0-S1 Front Service Four-way Valve Top Cover Plate Assembly Plate Heat Fixed Frame Expansion Tank Exchanger Ambient Temp. Electrical Box Water Pump Sensor Holder Water Flow Left Plate Liquid Reservoir Switch Finned Heat...
Page 10
EF AD-P3-20K-S1 Front Service Four-way Valve Top Cover Plate Assembly Fixed Frame Middle Plate Handle Plate Heat Electrical Box Expansion Tank Exchanger Finned Heat Water Pump Liquid Reservoir Exchanger Pressure Relief Ambient Temp. Left Plate Valve SensorHolder Water Flow Back Service Motor Support Switch Plate...
Electrical Box Parameter of the Unit Model EF AD-P1-9K0-S1 Power Supply 220-240V~/50Hz Refrigerant Type R290 [Space Heating] Ambient Temp. (DB/WB): 7°C/6°C, Water Temp. (Inlet/Outlet): 30°C/35°C. Max. Heating Capacity (kW) 3.50~8.81 Power Input (kW) 0.58~1.89 6.00~4.65 [Space Heating] Ambient Temp. (DB/WB): 7°C/6°C, Water Temp. (Inlet/Outlet): 50°C/55°C.
Page 12
1263 x 440 x 875 Net Weight (kg) Model EF AD-P3-20K-S1 Power Supply 380-415V/3N~/ 50Hz Refrigerant Type R290 [Space Heating] Ambient Temp. (DB/WB): 7°C/6°C, Water Temp. (Inlet/Outlet): 30°C/35°C. Max. Heating Capacity (kW) 6.70~20.36 Power Input (kW) 1.12~4.62 5.98~4.40 [Space Heating] Ambient Temp. (DB/WB): 7°C/6°C, Water Temp. (Inlet/Outlet): 50°C/55°C.
Power Input (kW) 5.19 4.37 Rated Power Input (kW) Rated Running Current (A) Compressor Brand HIGHLY Circulating Pump Built-in Water Side Heat Exchanger Plate Heat Exchanger Air Side Heat Exchanger Finned Heat Exchanger Expansion Tank (L) Display 4-inch Colored Touch Screen Rated Water Flow (m³/h) 3.44 Water Pressure Drop (kPa)
Page 14
Please comply with the following rules concerning the choice of heat pump location. 1 The unit’s future location must be easily accessible for convenient operation and maintenance. 2 It must be installed on the ground, xed ideally on a level concrete oor. Ensure that the oor is suf ciently stable and can support the weight of the unit.
Page 15
It is not recommended to install the unit according to the following installation method. 1 Do not make the air outlet of the unit blow against the air inlet of another unit and do not make the air outlet of the unit blow against the air outlet of another unit. 2 Don't make the air inlet of the unit opposite to each other and don't make the air inlet of the unit blocked by the wall.
Page 16
Notice: 1 Flexible connection between the unit and circulating water pipe can prevent vibration from unit to water pipe. 2 The gate valve must be installed at the inlet/outlet of the unit. When the pressure test is completed after the installation of the end of the water system, the gate valve shall be closed for the pressure test.
Electrical Installation current standards and regulations in the country where the system is installed. 3 The electricity supply cable must be adapted to match the unit’s rated power and the length of wiring required by the installation. The cable must be suitable for outdoor use. 4 For a three-phase system, it is essential to connect the phases in the correct sequence.
Page 22
1 Open the handle on the right side of the unit 2 Wiring Section...
Page 23
• The ground fault circuit breaker must be a 30 mA (<0.1 s) high speed type circuit breaker. Please use a cable with the corresponding number of cores and speci cations. • The current rating is based on the allowable maximum operating temperature of the conductor (105°C/70°C) and the rated ambient temperature (40°C/25°C), and assumes that the single wire is freely separated in the air, and the wire diameter comparison table is as follows.
Page 24
Solar Signal 18-N Solar Pump Outside Circulator Pump 19-N Mixing Water Pump Electric Heater for Water Tank 20-21 Defrost Indication 2# Three-Way Valve (Heating 22-23 Fault Indication Direction) 2# Three-Way Valve (Cooling 24-27 Linkage Switch Direction) 3# Three-Way Valve (Open 10-N 25-27 Smart Grid (SG)
Page 25
valve needs to be connected to the corresponding point on the terminal block of the unit. When the a ir conditioner of the unit is heating, the 8# wiring point has 220V voltage output, and the 9# point has not output;...
Page 26
Maximum current 0.2A Wire Speci cations 20AWG/0.75mm² control method Type 2 3) Electric heater for water tank...
Page 27
Voltage 220-240VAC Maximum current 0.2A Wire Speci cations 20AWG/0.75mm² control method Type 2 4) For Thermostat "Power input" provides the voltage of "thermostat", and does not directly supply power to the motherboard interface. Port "L1" supplies 220V to the RT connector. Port "L1"...
Page 28
(Single Zone Switch) Method 3 When "thermostat control" is set to "dual zone switch": When the C signal is closed, the A area is opened; when the C signal is disconnected, the A area is closed; When the H signal is closed, the B area is opened; when the H signal is disconnected, the B area is closed;...
Page 29
Voltage 220-240VAC Maximum current 0.2A Wire Speci cations 20AWG/0.75mm² Control method Type 1 6) For Wire Control Switch For Smart Grid The smart grid wiring is shown in the re below, SG is the smart grid signal, EVU is the photovoltaic signal.
7) For Solar Signal (220V power input, L and N) When [solar temperature probe] is set to "disabled", it is necessary to connect the solar signal to control the start and stop of the solar water pump. The wiring is shown in the re below.
Connecting to the EcoFlow PowerOcean System EcoFlow PowerOcean hybrid inverter is compatible with any SG-Ready cer ed Heatpump. When connected with the PowerOcean system, a SG-Ready cer ed Heatpump will be powered by PV strings, battery and utility grid. Effortlessly manage, monitor, and control your devices through a sleek, user-friendly interface via app or web management.
Maintenance and winterization Maintenance • Before undertaking maintenance work on the unit, ensure that you have disconnected the • electrical power supply. • The heat pump’s casing must be cleaned with a damp cloth. The use of detergents or other household products could damage the surface of the casing and affect its properties.
Page 33
Step 2 Remove The Front Service Panel 1 Remove the six screws in the upper and lower parts of the front service plate. 2 Press and hold the front service panel and push the panel upwards. 3 And then slide to the right to remove it.
Page 34
Step 4 Remove The Back Net 1 Remove the six screws ofthe back net. 2 Remove the back net. Step 5 Remove The Left Panel 1 Remove the seven screws in the left panel. 2 Remove the left panel.
Page 35
Step 6 Remove The Back Service Panel 1 Remove the seven screws from the back service panel. 2 Remove the back service panel by pulling it upwards. EF AD-P3-20K-S1 Work Procedure Step1 Remove the Top Cover 1 Remove the two screws on the right side of the top cover.
Page 36
Step 2 Remove The Front Service Panel 1 Remove the four screws in the upper and lower parts of the front service plate. 2 Press and hold the front service panel and push it upwards. 3 And then slide to the right to remove it.
Page 37
Step 4 Remove The Back Net 1 Removethe back net by removing eight screws. Step 5 Remove The Left Panel 1 Remove the ten screws in the left panel. 2 Remove the left panel.
Page 38
Step 6 Remove The Back Service Panel 1 Remove the nine screws from the back service panel. 2 Remove the back service panel by pushing it upwards.
Need help?
Do you have a question about the R290 and is the answer not in the manual?
Questions and answers