• all of the operating instructions. It is highly recommended to have this Battery Bank commissioned by a PowerShield Service Partner. This equipment should only be serviced and maintained by qualified PowerShield Service Partners. Failure to use a qualified service partner may impact your warranty. All electrical work must be undertaken by qualified electricians.
All electrical work shall be undertaken by a qualified electrician (in your local jurisdiction) iv. All commissioning / start-up shall be undertaken by either PowerShield or a locally trained service technician. All ongoing maintenance shall be undertaken by qualified personal. PowerShield recommends that all maintenance work is undertaken by a PowerShield trained service technician, to ensure that the vendor warranty is maintained.
NOTE: Before the installation, please inspect the unit. Confirm that there is no physical damage to the unit. Unfortunately, from time-to-time damages occur in transit. If the unit is damaged, please do not install and energize the unit. Please contact PowerShield immediately.
Page 5
7 IMPORTANT SAFETY WARNINGS continued The warranty for this battery bank will be void if water or other liquid is spilt or poured directly onto the battery box. Similarly we do not warrant any damage to the battery box if foreign objects are deliberately or accidentally inserted into the battery box enclosure.
Page 6
8 PRODUCT OVERVIEW AND SETUP 8.1 Rear Panel View 1. DC connector : connects to either UPS or 2nd BATTERY BANK 2. DC breaker: Battery over-current protection breaker...
8 PRODUCT OVERVIEW AND SETUP continued 8.2 Rear Panel View Unpacking & Inspection 1. Remove the battery bank from the packing. Note: The battery bank is very heavy, be cautious when unpacking and lifting the unit to avoid injury. Remove unit from pedestal For BB40: Lift the device off the pallet carefully >121kg For BB80: 1.
Page 8
8 PRODUCT OVERVIEW AND SETUP continued Connecting with UPS and other Battery Bank(s) Follow the installation diagram to connect the UPS with the Battery Bank(s) with included cable(s). 1st battery bank 2nd battery bank 1st battery bank 2nd battery bank...
1-2 hours 9.2 Maintenance To maximize the longevity of the Battery Bank(s), PowerShield highly recommends ongoing preventative maintenance. Failure to maintain your assets may lead to the equipment not performing as expected. Expected battery service life is three to five years when operated at 25°C.
Page 12
For more information, please visit www.powershield.com.au or phone 1300 305 393...
Need help?
Do you have a question about the Centurion Pro PSCEPBB40 and is the answer not in the manual?
Questions and answers