Download Print this page

Förster-Technik S21.1e Quick Start Manual

Dosing pump

Advertisement

Quick Links

S21.1e
Page 1 out of 12
Dosing pump
1
Introduction
These mounting instructions put you in the position to retrofit
the dosing pump safely as intended.
> Please read these mounting instructions carefully before
mounting the dosing pump.
> Keep these mounting instructions readily available at all
times.
> Observe all of the warnings and safety instructions in these
mounting instructions at all times.
> Observe the original operating manual of the milk trolley
„MilchMobil" and particularly the chapter „For your safety".
2
Zu Ihrer Sicherheit
2.1
Zielgruppe
Solely trained service technicians are authorised to mount the
dosing pump.
2.1.1
Necessary qualifications of the service technician
Service technicians are electricians with appropriate qualifica-
tions, i.e. they are able to assess the work assigned to them
and detect potential risks on the basis of their technical train-
ing as well as their knowledge of the relevant standards. This
also includes the knowledge of relevant accident prevention
Service info
Dosing pump
Re:
Milk trolley MilchMobil
Date
26th of May 2010
Retrofitting

Advertisement

loading
Need help?

Need help?

Do you have a question about the S21.1e and is the answer not in the manual?

Questions and answers

Summary of Contents for Förster-Technik S21.1e

  • Page 1 Service info Dosing pump Milk trolley MilchMobil S21.1e Date 26th of May 2010 Retrofitting Page 1 out of 12 Dosing pump Introduction These mounting instructions put you in the position to retrofit the dosing pump safely as intended. > Please read these mounting instructions carefully before mounting the dosing pump.
  • Page 2: Safety Signs On The Product

    Service info Dosing pump Milk trolley MilchMobil S21.1e Date 26th of May 2010 Retrofitting Page 2 out of 12 regulations, generally accepted safety regulations, EU guide- lines and country-specific standards and provisions. Intended use of the dosing pump The dosing pump is to be used exclusively for the dosage of liquid feed for young animals in combination with the milk trol- ley „MilchMobil“...
  • Page 3 Service info Dosing pump Milk trolley MilchMobil S21.1e Date 26th of May 2010 Retrofitting Page 3 out of 12 Do not spray-wash! Water (liquids) can damage electrical components. • Do not spray-wash the dosing pump. Do not use any high-pressure cleaners or similar equipment either.
  • Page 4 Service info Dosing pump Milk trolley MilchMobil S21.1e Date 26th of May 2010 Retrofitting Page 4 out of 12 Note For application notes and other useful information. However, it is just as important to observe any other notes and information which are not highlighted to avoid failures which, in turn, may cause direct or indirect injuries or material dam- age.
  • Page 5: Scope Of Delivery

    Service info Dosing pump Milk trolley MilchMobil S21.1e Date 26th of May 2010 Retrofitting Page 5 out of 12 Scope of delivery The scope of delivery of the dosing pump is as follows: 1 Battery box with rechargeable battery + standard 25 A...
  • Page 6 Service info Dosing pump Milk trolley MilchMobil S21.1e Date 26th of May 2010 Retrofitting Page 6 out of 12 Mounting the dosing pump to the MilchMobil Before mounting the dosing pump, make sure that > all of the electrical connections of the MilchMobil are safely disconnected from the mains.
  • Page 7 Service info Dosing pump Milk trolley MilchMobil S21.1e Date 26th of May 2010 Retrofitting Page 7 out of 12 Caution! Injuries to the locomotor system may be caused by the weight and installation position of the rechargeable battery. To avoid this, observe the weight of the assembly in the sec- tion “Lead-gel rechargeable battery”...
  • Page 8 Service info Dosing pump Milk trolley MilchMobil S21.1e Date 26th of May 2010 Retrofitting Page 8 out of 12 4. Place the supplied U-bolts from the rear around the right handle bar and run them through the plate (see illustration).
  • Page 9 Service info Dosing pump Milk trolley MilchMobil S21.1e Date 26th of May 2010 Retrofitting Page 9 out of 12 8. Run the cable of the dosing pump around the right handle bar downward and secure it with the two supplied cable clips (see illustration).
  • Page 10 Service info Dosing pump Milk trolley MilchMobil S21.1e Date 26th of May 2010 Retrofitting Page 10 out of 12 11.Hang this plate into the chassis of the MilchMobil (see illus- tration). Caution! Injuries to the locomotor system may be caused by the weight and installation position of the rechargeable battery.
  • Page 11 Service info Dosing pump Milk trolley MilchMobil S21.1e Date 26th of May 2010 Retrofitting Page 11 out of 12 12.Hang the battery box without lid into the connecting tube of the rigid axle of the MilchMobil (see illustration). 13.Pull the battery box upward by means of the lashing strap until it hangs horizontally in the chassis of the MilchMobil (see illustration).
  • Page 12 Service info Dosing pump Milk trolley MilchMobil S21.1e Date 26th of May 2010 Retrofitting Page 12 out of 12 15.Tighten up the other two screws of the battery box. 16.Connect the cable of the dosing pump to the rechargeable battery according to the supplied wiring diagram.