ActronAir CCO2-S Installation And Commissioning Manual
ActronAir CCO2-S Installation And Commissioning Manual

ActronAir CCO2-S Installation And Commissioning Manual

Co2 sensor

Advertisement

Quick Links

CO
Sensor
2
Installation and Commissioning Guide
Sensor
Model
Number
Tri-Capacity
CCO2-S*
Hercules
Variable Capacity
CCO2-MOD
Commercial
*
Compatible with CG10K Module
IMPORTANT NOTE:
Please read this manual carefully before installing or operating your air conditioning unit.
Family
PKY470/500/520/620/700/820/960T
CAY470/500/520/620/700T
EVY470/500/520/620/700T
PKV1400T/2000T
PKV720T/850T/960T
CRV/EVA720T/850T/960T
Model Number
Connector
Type
8 Pin
4 Pin

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the CCO2-S and is the answer not in the manual?

Questions and answers

Summary of Contents for ActronAir CCO2-S

  • Page 1 Sensor Installation and Commissioning Guide Sensor Connector Model Family Model Number Type Number PKY470/500/520/620/700/820/960T Tri-Capacity CAY470/500/520/620/700T CCO2-S* 8 Pin EVY470/500/520/620/700T Hercules PKV1400T/2000T Variable Capacity PKV720T/850T/960T CCO2-MOD 4 Pin Commercial CRV/EVA720T/850T/960T Compatible with CG10K Module IMPORTANT NOTE: Please read this manual carefully before installing or operating your air conditioning unit.
  • Page 2: Table Of Contents

    Installation and Commissioning Guide SENSOR Table of Contents 01. Introduction ....................03 02. Installation ....................03 02.01. Dimensions ......................03 02.02. Cable Specifications and Mounting Location ............ 04 02.03. DIP Switch Settings ..................... 04 02.03.01. Tri-Capacity and Hercules .............. 04 02.03.02. Variable Capacity Commercial (720-960) ........06 02.04.
  • Page 3: Introduction

    02.01. Dimensions 14.02 27.96 2 x 4.47 114.30 76.20 14.56 71.12 CCO2-S CCO2-MOD ActronAir is constantly seeking ways to improve the design of its products, therefore specifications are subject to change without notice. Copyright © 2022 Actron Engineering Pty. Ltd.
  • Page 4: Cable Specifications And Mounting Location

    To gain access to the DIP switch, remove the cover the CO sensor and locate the switches. CCO2-S (Tri-Capacity and Hercules) CCO2-MOD (VCC720-960) Please follow the DIP switch configuration in the figure below to ensure proper functionality of the CO sensor.
  • Page 5 Example application for this setting are Tri-Capacity (for PKY/CAY fitted with CM100 controller) and large Hercules (PKV) units. 1 2 3 4 5 6 ActronAir is constantly seeking ways to improve the design of its products, therefore specifications are subject to change without notice. Copyright © 2022 Actron Engineering Pty. Ltd.
  • Page 6: Variable Capacity Commercial (720-960)

    SW2 is used to configure the RS-485 address of the device. The factory setting address is 127 and which is also the address required to communicate with the ActronAir board. To set the MAC address to 127, all DIP switch positions must be set to ON, except for position 1.
  • Page 7 Auto baud disabled, serial baud rate, parity, and stop bits must be set manually ActronAir is constantly seeking ways to improve the design of its products, therefore specifications are subject to change without notice. Copyright © 2022 Actron Engineering Pty. Ltd.
  • Page 8: Wiring Diagram

    Installation and Commissioning Guide SENSOR 02.04. Wiring Diagram 02.04.01. Hercules Models Sensor Installation and Commissioning Guide Document: 9590-3011 Ver. 8 240603...
  • Page 9: Tri-Capacity Models - Cm100

    Installation and Commissioning Guide SENSOR 02.04.02. Tri-Capacity Models - CM100 ActronAir is constantly seeking ways to improve the design of its products, therefore specifications are subject to change without notice. Copyright © 2022 Actron Engineering Pty. Ltd.
  • Page 10: Tri-Capacity Models - Upc

    Installation and Commissioning Guide SENSOR 02.04.03. Tri-Capacity Models - uPC Sensor Installation and Commissioning Guide Document: 9590-3011 Ver. 8 240603...
  • Page 11: Tri-Cap 0-10Vdc Voltage Divider Terminal Block - Upc

    Installation and Commissioning Guide SENSOR 02.04.04. Tri-Cap 0-10VDC Voltage Divider Terminal Block - uPC ActronAir is constantly seeking ways to improve the design of its products, therefore specifications are subject to change without notice. Copyright © 2022 Actron Engineering Pty. Ltd.
  • Page 12: Vcc (72-96Kw) Models

    Installation and Commissioning Guide SENSOR 02.04.05. VCC (72-96kW) Models Sensor Installation and Commissioning Guide Document: 9590-3011 Ver. 8 240603...
  • Page 13: Controller Setup

    Steps 3 and onwards, will be relevant to both Hercules and Tri-Capacity units. ActronAir is constantly seeking ways to improve the design of its products, therefore specifications are subject to change without notice. Copyright © 2022 Actron Engineering Pty. Ltd.
  • Page 14 Installation and Commissioning Guide SENSOR 1. Select Service page Gfc8 to assign the CO sensor to Multi input 2. NOTE For this Tri-Capacity example, CO sensor will be assigned to Multi Input 2. S. Configuration Gfc8 Sensor present: Multi Input 1: NO Multi Input 2: NO NOTE Do not change your existing configuration for Multi Input 1.
  • Page 15: Variable Capacity Commercial (720-960)

    NEO, go to the Setting Economy Cycle Section in the Installation and Commissioning Guide of the Unit. ActronAir is constantly seeking ways to improve the design of its products, therefore specifications are subject to change without notice. Copyright © 2022 Actron Engineering Pty. Ltd.
  • Page 16: Minimum Outside Air Setup (Demand Controlled Ventilation)

    Installation and Commissioning Guide SENSOR NOTE The CO sensor is compatible with the following software with CMI board: Outdoor Board By using the Outdoor board Seven Segment buttons, a linear scale can be created for the outside air damper. To enable the CO sensor go to the following menu.
  • Page 17: Variable Capacity Commercial (720-960)

    EHPL = Economiser ELdP = Economiser damper p1 EHdP = Economiser damper p2 ActronAir is constantly seeking ways to improve the design of its products, therefore specifications are subject to change without notice. Copyright © 2022 Actron Engineering Pty. Ltd.
  • Page 18: Co Status

    Installation and Commissioning Guide SENSOR 03.03. CO Status 03.03.01. Tri-Capacity and Hercules To view the current status / levels of concentration of the CO in the condition space, please flow the steps below: NOTES The screenshots portrayed below are taken from the Hercules CP10. The same steps maybe followed on the Tri-Capacity’s CP05 to determine the CO concentration levels, however, contents on E1 page may vary.
  • Page 19: Specifications

    50 metres 100m Recommended Cable VCC - 0.50mm - 0.65mm twisted pair cable ActronAir is constantly seeking ways to improve the design of its products, therefore specifications are subject to change without notice. Copyright © 2022 Actron Engineering Pty. Ltd.
  • Page 20 1300 522 722 Refrigerant Trading Authorisation No.: AU06394 Sensor Installation and Commissioning Guide Document: 9590-3011 Ver. 8 240603...