Assembly Manual
N-Rack System
for rammed foundations
Connecting Strength
k2-systems.com

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the N-Rack 2.20 and is the answer not in the manual?

Questions and answers

Summary of Contents for K2 Systems N-Rack 2.20

  • Page 1 Assembly Manual N-Rack System for rammed foundations Connecting Strength k2-systems.com...
  • Page 2: Table Of Contents

    • Notes Quality tested – several certifications K2 Systems stands for secure connections, highest quality and preci- sion. Our customers and business partners have known that for a long time. Independent institutes have tested, confirmed and certified our capabilities and components.
  • Page 3: Tools Overview

    Tools overview 6 mm 8 mm 6 -  30 Nm 6 mm 17 mm 6 mm (4.5 - 22.2 lb-ft) 17 mm Gripple Torq Tool 400 · 2004456 ≥ 3,0 m ≥ 6,0 m...
  • Page 4: General Safety Information

    • Compliance with health and safety regulations, acci- • K2 Systems GmbH reserves the right to exclude liabil- dent prevention guidelines and applicable standards is ity if our general safety instructions are disregarded required. or if components of the competition are installed or •...
  • Page 5: The Following Guidelines Apply

    The following guidelines apply This system can be used without further testing by K2 Systems in the following standard conditions. The system is also suitable for higher requirements. However, if a value exceeds the standard conditions, please contact K2 Systems.
  • Page 6: Components

    Components Base components 2004384 Item number project 2004408 1002849 Cap-Profile Hexagon head Hexagon lock specific , see P. 8 - 11 N-Rack Brace screw with nut M10 shank M10 × 70...
  • Page 7 Item number project 2004381 2004409 1001051 specific, see P. 8 - 11 CrossRail 73 CrossRail 73 Con- Self-drilling screw N-Rack Beam nector 5,5 × 25 2003145 Item number project Item number project 2004410 Climber 36/50 set Wind bracing set specific specific End clamp Middle clamp...
  • Page 8: Brace/Beam Components N-Rack 2.20

    Brace/Beam Components N-Rack 2.20 Suitable for module lengths > 1905 mm Module length 2004401 3-Hole Brace N-Rack 715 2004403 3-Hole Brace N-Rack 1625 2004406 2-Hole Brace N-Rack 2154 2004399 Beam N-Rack 3750...
  • Page 9: Brace/Beam Components N-Rack 2.20 S

    Brace/Beam Components N-Rack 2.20 S Suitable for module lengths ≤ 1905 mm Module length 2004401 3-Hole Brace N-Rack 715 2004402 3-Hole Brace N-Rack 1370 2004452 2-Hole Brace N-Rack 1779 2004400 Beam N-Rack 3020...
  • Page 10: N-Rack 3.15

    N-Rack 3.15 2004384 Item number project 2003145 Cap-Profile Climber 36/50 Set specific, see P. 11 N-Rack Beam Item number project specific, see P. 11 2004381 Item number project N-Rack Brace CrossRail 73 specific End clamp 2004408 2004409 Item number project Hexagon head screw with CrossRail 73 Connector specific...
  • Page 11: Brace/Beam Components N-Rack 3.15

    Brace/Beam Components N-Rack 3.15 Suitable for module lengths > 1905 mm Module length 2004401 3-Hole Brace N-Rack 715 2004402 3-Hole Brace N-Rack 1370 2004405 3-Hole Brace N-Rack 1948 2004406 2-Hole Brace N-Rack 2154 2004398 Beam N-Rack 6150...
  • Page 12: Assembly

    Assembly Ramming tolerances ± 5° Inclination Inclination Ramming depth Twisting Height difference North-South: ± 3° East-West: ± 3° ± 100 mm ± 5° in a row: ± 30 mm Ramming foundation spacing The pile-driving depth and the installation distances specified in the project plan.
  • Page 13: Fixation Braces

    Fixation Braces 30 Nm Fixation Beam 30 Nm...
  • Page 14: N-Rack 2.20 / 2.20 S Bracing

    N-Rack 2.20 / 2.20 S Bracing 30 Nm Note attachment of wind bracing: Step 10 Alternative holes for field inaccuracy N-Rack 2.20 / 2.20 S Distances CrossRails The distances between the CrossRails are shown in the project report.
  • Page 15: N-Rack 3.15 Bracing

    N-Rack 3.15 Bracing 30 Nm Note attachment of wind bracing: Step 10 Alternative holes for field inaccuracy N-Rack 3.15 Distances CrossRails The distances between the CrossRails are shown in the project report.
  • Page 16: Fixation Crossrail 73 + Climber

    Fixation CrossRail 73 + Climber 16 Nm k =Project specific CrossRail 73 Connector...
  • Page 17: Module Assembly (End Clamp / Middle Clamp)

    Module assembly (End clamp / Middle clamp) ≥ 50 mm 16 Nm ≥ 50 mm Manufacture of the wind bracing Anwendungshinweise des Herstellers beachten...
  • Page 18: Notes

    Notes...