• Notes Quality tested – several certifications K2 Systems stands for secure connections, highest quality and preci- sion. Our customers and business partners have known that for a long time. Independent institutes have tested, confirmed and certified our capabilities and components.
• Compliance with health and safety regulations, acci- • K2 Systems GmbH reserves the right to exclude liabil- dent prevention guidelines and applicable standards is ity if our general safety instructions are disregarded required. or if components of the competition are installed or •...
The following guidelines apply This system can be used without further testing by K2 Systems in the following standard conditions. The system is also suitable for higher requirements. However, if a value exceeds the standard conditions, please contact K2 Systems.
Components Base components 2004384 Item number project 2004408 1002849 Cap-Profile Hexagon head Hexagon lock specific , see P. 8 - 11 N-Rack Brace screw with nut M10 shank M10 × 70...
Page 7
Item number project 2004381 2004409 1001051 specific, see P. 8 - 11 CrossRail 73 CrossRail 73 Con- Self-drilling screw N-Rack Beam nector 5,5 × 25 2003145 Item number project Item number project 2004410 Climber 36/50 set Wind bracing set specific specific End clamp Middle clamp...
N-Rack 3.15 2004384 Item number project 2003145 Cap-Profile Climber 36/50 Set specific, see P. 11 N-Rack Beam Item number project specific, see P. 11 2004381 Item number project N-Rack Brace CrossRail 73 specific End clamp 2004408 2004409 Item number project Hexagon head screw with CrossRail 73 Connector specific...
Assembly Ramming tolerances ± 5° Inclination Inclination Ramming depth Twisting Height difference North-South: ± 3° East-West: ± 3° ± 100 mm ± 5° in a row: ± 30 mm Ramming foundation spacing The pile-driving depth and the installation distances specified in the project plan.
N-Rack 2.20 / 2.20 S Bracing 30 Nm Note attachment of wind bracing: Step 10 Alternative holes for field inaccuracy N-Rack 2.20 / 2.20 S Distances CrossRails The distances between the CrossRails are shown in the project report.
N-Rack 3.15 Bracing 30 Nm Note attachment of wind bracing: Step 10 Alternative holes for field inaccuracy N-Rack 3.15 Distances CrossRails The distances between the CrossRails are shown in the project report.
Page 20
Thank you for choosing a K2 mounting system. Mounting ystems from K2 Systems are quick and easy to install. We hope these instructions have helped. Please contact us with any ques- tions or suggestions for improvement. Our contact data: •...
Need help?
Do you have a question about the N-Rack 2.20 and is the answer not in the manual?
Questions and answers