Advertisement

Quick Links

Installation instructions
Compleo ePOLE
for Compleo ePOLE and Compleo ePOLE back-to-
back

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the ePOLE and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for Compleo ePOLE

  • Page 1 Installation instructions Compleo ePOLE for Compleo ePOLE and Compleo ePOLE back-to- back...
  • Page 2 2 | Installation instructions Compleo ePOLE...
  • Page 3: Table Of Contents

    Contents | 3 Contents Safety information Qualifications for electrical work Product overview Included in delivery Compleo ePOLE – the product details Specifications Installation Before installing Choosing the site Concrete foundation Tools needed Supply lines Mounting Next steps Dismounting Disposal Imprint...
  • Page 4: Safety Information

    4 | Installation instructions Compleo ePOLE Safety information DANGER Danger to life and limb Warning of electrical voltage! Caution Significant injury hazard/material damage Caution: Significant risk of injury or material damage! Note Information on optimising the application Observing this information can improve the product’s application.
  • Page 5: Qualifications For Electrical Work

    Safety information | 5 Qualifications for electrical work The specialised personnel performing or supervising the electrical installation Danger and maintenance of the device must have read and must follow these Handling live components installation instructions. Also, this personnel must have been assigned by the incorrectly may cause grievous injuries and death.
  • Page 6: Product Overview

    6 | Installation instructions Compleo ePOLE Product overview The ePOLEs serve as mounting stele for up to two eBOXes with one eCLICK, each. The modular concept of the eBOX overall product also allows for a separate eCLICK installation of the ePOLEs in advance.
  • Page 7 Safety information | 5 The following products can be ordered separately: • LOCK ePOLE (padlock with steel bolt) • Concrete foundation...
  • Page 8: Compleo Epole - The Product Details

    Measurements H x W x D ePOLE: 1,583 mm x 150 mm x 250 mm ePOLE back-to-back: 1,583 mm x 150 mm x 250 mm ePOLE back-to-back short: 1,203 mm x 150 mm x 250 mm Installation type Free-standing on concrete foundation ePOLE: 14.1 kg, ePOLE back-to-back: 15.2 kg,...
  • Page 9: Installation

    No additional electrical devices may be integrated in for connection can supply the required electrical power. any of these circuits. For each charging point, each ePOLE must be protected, Before installing, first consult the owner or operator in the pre-installation, corresponding to the respective...
  • Page 11: Choosing The Site

    Installation | 9 Choosing the site Typically, the location of the ePOLE has been agreed upon with the customer, in advance of the installation, Danger upon the on-site inspection. Do not install in and around ex-zones! For a smooth flow of the installation, the following prep work must be performed.
  • Page 12: Tools Needed

    Each eCLICK must be equipped with a separated residual-current device and an over-current protection device in the sub-distribution. This means that in the case of the ePOLE for two eBOXes two electrical supply lines lead through the ePOLE. Danger There is a danger of electric...
  • Page 13 There, keep at least 2,000 mm cable length available at the installation point in order to be able to later feed the feeds through the ePOLE and be able to connect the eCLICKs. If the two eBOXes are to be connected via LAN, two separate Ethernet cables must be laid analogously.
  • Page 14: Mounting

    12 | Installation instructions Compleo ePOLE Mounting Before assembling the ePOLE, obtain an overview of the steps required. Feed the electrical supply lines and, where applicable, the Ethernet cables through the concrete foundation. At the top of the foundation, at least two metres of each supply line should still be available to you.
  • Page 15: Next Steps

    Next steps | 13 Next steps Subsequent to the assembly of the ePOLE: • eCLICKs and eBOXes can be installed immediately or • eCLICKs and eBOXes later. A) Installing eCLICKs and eBOXes immediately If the eCLICKs and eBOXes are available, install them Danger immediately.
  • Page 16 14 | Installation instructions Compleo ePOLE Commission the eBOXes Optional (only if LOCK eBOX Hand the key to the owner in accordance with the was ordered): Feed the steel or operator of the ePOLE. included installation bolt through the designated instructions.
  • Page 17: Dismounting

    For de-installation of the ePOLE, set the eBOXes and eCLICKs voltage-free first. Leave the lines voltage-free Ensure that the electrical lines are also voltage-free after for the whole duration of the de-installation.
  • Page 18 Compleo Charging Solutions GmbH & Co. KG Sales partner UK Ezzestraße 8 Compleo Charging Solutions UK Ltd. The Lambourn | Wyndyke Furlong 44379 Dortmund | Germany Abingdon | OX14 1UJ | Great Britain servicedesk@compleo-cs.com compleo-charging.com...

This manual is also suitable for:

Epole back-to- backEpole back-to-back short

Table of Contents