Contents | 3 Contents Safety information Qualifications for electrical work Product overview Included in delivery Compleo ePOLE duo – the product details Specifications Installation Before installing Line selection Choosing the site Concrete foundation Tools needed Supply lines Mounting Next steps...
4 | Installation instructions Compleo ePOLE duo Safety information Danger Danger to life and limb Warning of electrical voltage! Caution Significant risk of injury/material damage Caution: Significant risk of injury or material damage! NOTE Information on optimising the application Observing this information can improve the product’s application.
Safety information | 5 Qualifications for electrical work The specialised personnel performing or supervising the electrical installation Danger and maintenance of the device must have read and must follow these installation Handling live components instructions. Also, this personnel must have been assigned by the system owner. incorrectly may cause grievous injuries and death.
4 M16 nuts with 4 washers with 4 caps Note: To mount the eBOXes on the ePOLE duo, you will need two eCLICKs; they are not part of the ePOLE duo. Caution The contents of the delivery must be checked...
Product overview | 7 Compleo ePOLE duo – the product details Aluminium head Cover plates for aluminium head Lock Aluminium column Cable hanger (optional, not included) Base plate Concrete foundation (optional, not included) Specifications Measurements H x W x D...
8 | Installation instructions Compleo ePOLE duo Installation This chapter is split into installation, supply lines, assembly and next steps. Caution Danger Each eCLICK must be protected in Before installing, familiarise the distribution box with a residual yourself with the safety current device and a circuit instructions.
Page 9
Installation | 9 Variant 1 Variant 2 Charging power 3.7 kW; 11 kW 7.4 kW; 22 kW Charging current 16 A 32 A Example F204A, 4-pole, 25/0,03 A ABB F204 A, 4-pole, 40/0,03 A ABB Standards DIN EN 61008-1/DIN EN 61008-2-1 DIN EN 61008-1/DIN EN 61008-2-1 Type Operating voltage...
10 | Installation instructions Compleo ePOLE duo Choosing the site Typically, the location of the ePOLE duo has been agreed upon with the customer, in advance of the installation, Danger upon the on-site inspection. Do not install in and around...
Since each eCLICK must be equipped with a separate residual current device and a circuit breaker in the sub-distribution, it is necessary to feed two electrical supply lines through the ePOLE duo. Danger There is a danger of electric shock!
There, keep at least 2,000 mm cable length available at the installation point in order to be able to later feed the feeds through the ePOLE duo and be able to connect the eCLICKs. If the two eBOXes are to be connected via LAN, two Ethernet cables must be laid analogously.
Page 13
Installation | 13 Feed the electrical supply lines and, where applicable, the Ethernet cables through the concrete foundation. At the top, at least two metres of each supply line should still be available to you. Place the aluminium column on the base plate and screw it on with the four screws provided.
Page 14
14 | Installation instructions Compleo ePOLE duo If you would like to install cable hangers, mount these now to the aluminium column in accordance with steps 05.01 to 05.04. Otherwise, skip to Point 6. 05.03 Tighten the screws with the help of an Allen wrench while fixating the mounts with an open-ended spanner.
Next steps | 15 Next steps Subsequent to the assembly of the ePOLE duo: • eCLICKs and eBOXes can be installed immediately or • eCLICKs and eBOXes later. A) Installing eCLICKs and eBOXes immediately Danger If the eCLICKs and eBOXes are available, install them There is a danger of electric immediately.
Page 16
16 | Installation instructions Compleo ePOLE duo Now release the bracket Please continue to hold and let it lift automatically. the eBOX in place with Please hold the eBOX in one hand. Check the final place with one hand. position of the locking bracket, it must be fully raised.
Page 17
If no eCLICKs are available, Hand the key to the owner or Leave the electrical supply yet, fixate the supply lines operator of the ePOLE duo. line voltage-free so that such that they are easily the supply lines are not...
For de-installation of the ePOLE duo, set the two eBOXes subsequently the aluminium column can be removed. and eCLICKs voltage-free first. Leave the supply lines Unbolt the steel mounting bracket from the concrete voltage-free for the whole duration of the de-installation.
All rights reserved. This document is intellectual property right- and copyright-protected. No part hereof may be edited, duplicated, or published in any manner purposing other than the proper installation of the ePOLE duo without express written permission of Compleo Charging Technologies GmbH. Compleo Charging Technologies GmbH Oberste-Wilms-Straße 15a...
Page 20
Compleo Charging Technologies GmbH UK sales partner Oberste-Wilms-Straße 15a Compleo Charging Solutions UK Limited D-44309 Dortmund | Germany 6th Floor | 60 Gracechurch Street London | EC3V 0HR | Great Britain servicedesk@compleo-cs.com compleo-cs.com...
Need help?
Do you have a question about the ePOLE duo and is the answer not in the manual?
Questions and answers